ORDINARY MEETING MINUTES 17 NOVEMBER 2022
18. Any construction and post construction activity must not to impact on the condition
of the waterway and is to be conducted so as not to breach the Environmental
Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
19. Certification by a Registered Professional Engineer of Queensland that states that
the jetty extension and pontoons are constructed in accordance with best practice
methods and are structurally sound must be submitted to Council. This certification
must be submitted to Council within three (3) months of the completion of the
works. A final inspection and approval of the structure by Council’s Inspector is
also required. Please contact Council’s Planning Assessment Section to arrange
the inspection.
20. After completion, the proposed works must be maintained in a sound state of repair
in accordance with the approved plans.
21. All necessary State government approvals relating to this development must be
obtained prior to any works commencing on the site.
Environment
22. To ensure the safety of persons accessing the approved works and to prevent
environmental harm, a safety audit of the on-site fuel storage tanks, bowsers and
associate pipework, valves, vents and systems shall be conducted by a suitably
qualified professional and submitted to Council for approval prior to the use of the
new works (pontoon/jetty extensions). The audit shall demonstrate that the fuel
systems are in a safe and serviceable condition or, where necessary, identify repair
and rectification requirements to meet the relevant Australian Standards and
industry best practice environmental management. Any repair works must be
completed, with certification submitted by the auditor to Council, prior to the use of
the new works (pontoon/jetty extensions).
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REASONS TO JUSTIFY THE DECISION DESPITE THE CONFLICT WITH THE PLANNING
SCHEME:
Find the following matters relevant to the assessment and sufficient reason to approve the
application:
1. Although there is a proposed net increase of pontoons which increases site cover within
the lease area, the proposal:
a. will ensure the vessels are moored wholly within the existing lease area of the
marine facility; and
b. maintains the character of the site as a marine facility which is compatible with
surrounding marine activities.
2 INTEGRATED WATER QUALITY MONITORING PROGRAM
In accordance with Chapter 5B of the Local Government Act 2009, Cr Stockwell provided the following
declaration to the meeting of a prescribed conflict of interest in this matter:
I, Cr Stockwell, declare that I have a prescribed conflict of interest in the matter as follows: Seqwater
was a major client of my sole trader business (t/a Watershed Australia). Between 2016 and 2020, I
undertook: catchment planning; land capability and suitability assessments for source protection,
recreation, grazing, infrastructure, environmental offsets and solar farms; environmental and natural
resource evaluation, and 'Expert Witness' services in a court case, for the entity. This involved contracts
to the value of $232,266. This work has covered the vast majority of the Seqwater estate throughout
South East Queensland including the Seqwater Lake Macdonald estate, where the water treatment plant
is located. As a result of my conflict of interest I will now leave the meeting room while the matter is
considered and voted on.
Cr Stockwell left the meeting.
Page 16 of 24