4 - Bushfire Response
PPA ATTACHMENT 4 Bushfire Response Prepared by: Eldon Bottcher Architect 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 22 pages
Page 2
Eldon Bottcher Architect ty. Ltd EJB:VAB: FM 5810 L1 FINO BPOMrcuelk WLCUIECr KIA ra Postal Office 5/10/22 PO. Box 3606 145 Varsity Pde Robina Town Centre Varsity Lakes QLD 4227 . QLD 4230 ABN 61010354604 Mr S Godwin W www.eb-a.com.au P 07 55920082 Ci/- E_ [email protected] F 07 56380374 Property Projects Australia Level 1 618 Brunswick Street New Farm. Attention . Mr S Godwin Project; Proposed Subdivision 43 Summit Road Pomona Dear Sir We, Eldon Bottcher Architects as competent persons have been requested to provide further advice in relation to an Information Request dated 20 September from Noosa Council in relation to the One into Two Subdivision of property scheduled below. 1.1. Address: 43 Summit Road Pomona 1.2, Local Authority Noosa Shire Council 1.3. R.P.D. Lot 3 on SP186019 It is my understanding that the issues have in the main been previously addressed by the Town Planner Mr Marcus McNee of Property Projects Australia, but | provide my further advice in response to the Information Request, in particular Items 9 to 11 in relation to Bushfire Hazard Item 9 a. The report clearly provides a plan which sets out BAL Contours from threat vegetation, a table in Section 2.4 of the report which sets out the distances and respective BAL levels, and support information at the rear of the report provides the computer printouts supporting those distances. You will note that the plan provided as part of the report clearly sets out the proposed subdivision boundaries and the BLE’s within those proposed boundaries. It is quite clear from the plan that the proposed easiern lot has approximately haif of the lot within which a proposed building would be required to be a BAL 12.5 construction, and that there are no construction requirements in relation to bushfire for the proposed western Lot. | attach as Appendix A, a copy of the plan provided in the report. Section 2.4 of the report also includes the following: Construction Levels are shown as part of a comprehensive Bushtire Management Plan. They are provided for the end user of the land and its eventual occupants. They are not provided for assessment by Local Authority, in accordance with the Planning Act 2016, The State Planning Policy, and The Building Act 1978. | attach extracts from the Planning Act (Sections 7, 5&6) in relation to this as Appendix B SL A A LS Architecture | Interior Design | Bushfire Management Planning | Bushfire Safety Engineering ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 1
Page 3
b There are no “Asset Protection Zones”. The site is essentially well managed, however Section 3.8 of the report details generally vegetation management across the whole of the site to ensure that responsible management continues to occur across the site. ce There is no “extent of clearing”! The vegetation management only requires understory vegetation to be removed with no trees of protected sized to be removed. Refer to Section 3.8 of the report. d There is no management required of any protected size vegetation and no management along creek lines— see Section 3.8 6 See Section 3.8, which outlines that there is no vegetation management along creek lines. No further detail is required as no management is required in these areas. Section 3.8 of the report is attached as Appendix C with relevant areas underlined. Item 10 See Appendices D for Noosa Council Overlay Code and Appendix E for State Interests Overlay Code Item 11 The access track is dealt with in sections 3.6, 3.7 and 3.11 of the Report- see Appendix F. It is required to comply with “Fire Hydrant and Vehicle Access Guidelines for Residential, Commercial and Industrial Lots” published by QFES and Qid Government, and is along an access strip approved by council as part of an earlier subdivision. Yours faithfully ELDON BOTTCHER. Grad. Dip/DBPA (UWS) Dip. Arch. (QIT), Cert. R.F.M. (USQ), F.R.A.LA., M.A.LE.S. AlFireE Archite BPAD¢L3 Practitioner a IS ENT SS ST SURG SY SSS SP SS Architecture | Interior Design | Bushfire Management Planning | Bushfire Safety Engineering ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 2
Page 4
APPENDIX A PLAN SHOWING BAL CONTOURS ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 3
Page 5
ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 4
Page 6
APPENDIX B EXTRACTS FROM PLANNING ACT ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 5
Page 7
Planning Act 2016 Chapter 2 Planning [s 7] 7 Act binds all persons (1) This Act binds all persons, including— (a) the State, other than the Coordinator-General when performing functions under the State Development Act; and (b) the Commonwealth and the other States, to the extent Parliament’s legislative power allows. (2) However, the Commonwealth or a State can not be prosecuted for an offence against this Act. Chapter 2 Planning Part 1 Introduction What are planning instruments @) (2) A planning instrument is an instrument that sets out policies for planning or development assessment, and is either— (a) a State planning instrument; or (b) a local planning instrument. A State planning instrument is a planning instrument made by the Minister to protect or give effect to State interests, and is either— (a) a State planning policy (including a temporary State planning policy); or (b) aregional plan. (3) A local planning instrument is a planning instrament made by a local government, and is either— (a) aplanning scheme; or (b) aTLPI; or Page 22 Current as at 10 June 2022 Authorised by the Parliamentary Counsel ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22
Page 8
(4) Planning Act 2016 Chapter 2 Planning [s 9] (c) _aplanning scheme policy. To the extent of any inconsistency— (a) a State planning policy applies instead of a regional plan or local planning instrument; and (b) a regional plan applies instead of a local planning instrument; and (c) aplanning scheme applies instead of a planning scheme policy; and (d) aTLPI applies instead of a planning scheme or planning scheme policy. Note— A TLPI may also suspend, or otherwise affect, the operation of a planning scheme or planning scheme policy—see section 23(3). 6) (6) A local planning instrument must not include a provision about building work, to the extent the building work is regulated under the building assessment provisions, unless allowed under the Building Act. To the extent a local planning instrument does not comply with subsection (5), the local planning instrument is of no effect. 9 When planning instruments and designations have effect (1) (2) @) This section explains when certain instruments made under this chapter start to have effect. The effective day is the day when the following instruments start to have effect— (a) aplanning instrument or designation; (b) an amendment or repeal of a planning instrument or designation. If this chapter requires public notice of the instrument to be published, the effective day is— (a) _ the day on which the notice is published in the gazette; or Current as at 10 June 2022 Page 23 Authorised by the Parliamentary Counsel ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22
Page 9
APPENDIX C REPORT SECTION 3.8 ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 8
Page 10
3.8. Vegetation management 3.8.1. All grass and existing mid storey vegetation within the site shall be always kept to a maximum of 100mm or be of jess flammable or rain forest species. 3.8.2. Existing non rainforest trees within this area are to be reduced to give a noncontinuous canopy cover between trees with a total Lover of Jess than 30% af the. area 3.8.3. 3.8.4, 3.8.5. a imber to be "removed from the sites and_removed from site. 3.8.6. Requirements nated above may be subject to State and Local Authority approval. Those approvals must be obtained prior to implementation of any of these measures. 3.8.7. Refer to Sections 14 and 19 of the Planning Act 2016 in relation to Local 3.8.8. The management referred to above is regarded as “Essential Mere a et opeecenee to Renimi'ok feckion the imminent risk that the vegetation poses of serious personal injury or damage to infrastructure” under the Sustainable Planning Regulation Schedule 24, It is recommended that the owner register any clearing work with www.dnrm.ald.gov.au, “Vegetation management notification form for self-assessable codes’ 3.8.9. This legislation is currently under review. It is the owner's responsibility to make any necessary enquiries to ne compliance with the current legislation with important amendments made in December 2019., as noted low: ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22
Page 11
APPENDIX D COMPLETED NOOSA COUNCIL BUSFIRE HAZARD OVERLAY CODE ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 10
Page 12
LE ce/oLs ® D xipuaddy aes -seare Aemiaqem ay) Ul peyonpuos SI JUaWaseueU UONeaBaA OU Jey) saimMba GWAG eyL ‘sattduioy *s.'1q pasodoid Jo suoneso] Surmoys y xipuaddy ut uejg aus aas ‘satjdwio) ‘vale plezey aayysng paezey ysty Jo WNIpaul & UI jOU aJOjatay} pue ‘Base Jayjng prezey B WIM S,q'1g sasodoid ay sase|d styy ‘y xipueddy se paypeye ueld ays 34} Uo UMOYS .M0qWOD 74 TV ay) JO aspa Uleysea ayy Aq payeatpul se pue ‘ays yalqns ay) Jo Arepunog usajsea ay) Suoye SuluuNs yaas ayy JO apis U1a}se9 ay} UO Jsea JaYLANY Rate paezey YS} AoA 2y} Jo adpa U1ajsam ayy saoeyd yorum ‘Apms doy ysap Aq PSULIUOS JOU SI SIW], ‘Barly paezey YsIY Ala, e Ul ays oy) jo bale Usa}sea ay) Jo Wed adejd pinom eaie paddew ayy asuodsay G11 Ald LOALIHOYV YAHOLLOG NOd1S peplaorg awuosng a[qeidassy on ‘ysti ajqeidasoe Ue aAaTYIE 0} UOTeIaS9A snopsezeYy WOJy SydEqIaS SaSTUHXeU JUaUIdoO[aAsGg cTOV "ale plezey aargysng Ysty 10 WnIpauu e UIYIIM payeso] JOU SI Jo] & Sulnsyuosas Sulpnyout ‘sastwuaid uo Suneseidu0s 10 Surat] e[doad Jo saquinu ayy asealOUl Aljeliayeul [[IM YoTyM Juaudojeasq TTOV sautozmng e[qeidassy jo seare pue puepam ‘shemie}eM Jo AaZaquy jearsAyd w1a}-3uo] ayy -q pue ‘Suluonsuny wayssove pue AMANIauUOD ‘sanfea AYSIIATPOIQ. “eB ‘uo qedull Ajasiaape JOU Op samseaul UONes IW aiyysng ZOd sealy JueWodul AT[es1s0[00q uo sedwy ‘aryysng jo spedul asiaape ayy Woy AJado.id pue ajdoad Jo Mayes ayy surequrew yusurdojaaaq TOd Ayredoig pue ajdoag Jo Ajayes SalWlo2]NQ adUeULIO}.ag quauidojaaag a[qessassy 10J eLIaLI) ¢'¢°7'9 B1qeL apo) Aep.aaQ paezey a1gysng ¢€'7'8
Page 13
a Zz/OLis ® atqeayddy Jon arqeorddy jon ‘sosodind sunysyer1y 10j ajqeyins jou eae sjood Jo swep WO JayeM se parmba. st [ddns yuey payesipaq 5) xIpuaddy aas ¢'¢ uonoas Woday ut pasmbey ‘saljdwioy G11 Ald LOALIHDYVY HSHOLLOG NOG1S 0} pausisap si amyon.yseyur AyUNUIWOD [eQuasse Sulajoaut quowidojaaap ‘vase paezey alyysng ysiy 10 wnIpaw e Ul payeo0] a10yM, ZvOV Yo ‘Bale PIBZeEY alyYysng YysTy 10 UWMIPEU & UIYILM pa}ed0] JOU SI AINON.YSBYUI AyUNUIUIOD [eWUaSsa ZuLAfOAUT JuaUdoTaAag ‘(wep Jo [ood surmmuims e ul st Ajddns Jajem ay) aieym uey) 4ayj0) Ajddns 1ajem ay} 0} payauu0s sumy epesuq aly piepueis 2 YM payy Ja}sWeIP Ul saaUIT[ [IW 0s adid japno Ajddns sayem eve pue ‘S31 000‘S Wey ssa_ Jou Jo aumjoa Jayem aysuo ue Mm = sasodind sunysyary 10} aqetreae yur, Jojem 410 jood SurwWiMs ‘wep a[qIssas0e ue TvOV "2 isey sasiuaid ayy ‘Ajddns JOIEM paze[Noyat a[qepieae OU S| a1ay) ATOM cEOV Yo ‘Atddns 193em pave[Moyal ay) 0) payauuod ale sastulaig TEOV ‘squaaa aayysng Jaye ApayeIpauunt pure 3uLinp AjaaQoajja uoouny 0} arqe sI aINpONAYSeAJUI ATUNUIWOD [eQUaSSy Od aImpnyselyul AWWUNUWIUIOD [eQuassy “a[qissazoe Ajaad pue payecoy Ajayes ‘a[qeifas ST yotym asodand Sunysyery 10) Ajddns Jayem ayenbape ue saptaoid quauidojeaeq €0d sasoding sunysty atty 10y Ajddng sz97e, uoTWe1a59A BAQEU
Page 14
€L
ZC/OLIS 9
aqeoyddy 30N
4 xIpueddy aas quauiusan0y pid
pue saad Aq paysiqnd ,s}07] [eLysnpu] pue [epseuw0
‘feQUaplsay 10j sautjapmny ssadzy appre, pue
querpAy atts, YM ATduro9 07 paambad si ye. sseooe ay,
atqeorddy 10N
atqeatiddy 10N
atqeoyddy I0N
‘sannuenb
asn [eQuaptsal [eULIOU J0j aq [[IM a8e10}s [eQUa}0d
pue ois UO pa.InjoeynueW aq [[IM S[eLIoqeuL snopiezey ON
G11 Ald LOALIHDYY YAHOLLOG NOG13
SxIOM JURAATA.I BY YILM Sat[dwos yt ‘parmbas
SI qulod ssazoe Anuadjaula ue aay,
g90V
‘jauuos.iad pue saparyaa
AnuaB19wW 10J UaUIdoTsAap ay} Jo [Te 07
Sault [[e 1e alqe|eae si ssai3a pue ssaoov ayes
vo0V
“speo. y8no14y
0} Yul] YITYM pue saptyea [eUoQUaAUOD
Aq payestaeu 3ulaq jo ajqedes ase
YSIYM ‘sjUaulasea ssad0e 10 S{Ie.1] ay YIM
peplaoid are speos ySno.1yj-ou 10 soes-ap-[nj
€90V
Yo
%G'Z1 Jo qualpess wnuxeuw pue
Sa.1]aUl OZ JO YPM WNUITUTU B YIM dAlesat
peol JajawLiad e sey yuautdojaaap ayy,
Z90V
Yo
“spel pua-peap pure soes-ap-[nd sploae pue
speol-ysno.1y) oj saptaoid ynoAKT peo ay
T90V
‘eale prezey aiyysnq e UL x[Nq UT patois
Jo painyoejnuew jou aie sjeLiajyeul snopsezey
sOV
‘ue[d JUewiaseuRyW piezey
augysng & YIM adueps0zze Ul Uae aIyYysNq
Be Jaye pue Surimp Ajaanoayje uogouny
‘sadlAJas Aquastawia Aq ssazoe
pue sastwad Jo sjuapisal Jo uonenoeaa
ayes pue Asea 10j aptaoid speoy
90d
sajnoy uoenseag pue ssao0y
“yng Ul But10ys 10 8uLMDeNUeUL
s[el1eyeW snopiezey uo alyysng
Jo spedur ayj Aq paqoayye Afasiaape
JOU ale JUaWUOIAUA ay} pue AJayes aqQng
sOd
sjeiayey snopiezey
Page 15
tL ez/0Lis 2 atqeorddy Jon y xipuaddy aas - sayjduio7 @ xipuaddy pure y xipuaddy aas - sarjduio) 4 xipuaddy pue y xipuaddy aes - sarjdurop ¥ xIpuaddy aas -satjduiop GLI Ald LOSLIHDYV YSHDLLOG NOd14 JUSIPeis UNUIXeU puke apm Saljau QZ UY) ssa] OU dAlasat peot pales e Surplaoid Aq paplaoid sl} yearqaly e ‘s}o] pue peor mau e JO UONeaID ay) Saajoaul JuaUIdoJaaap aa, “paezey aly ay} 0} Jsasop) are aly 0} ajqudassns sea] Juaudojeaap ayy jo sjUuaUleta pue jo, ayy UNM paezey samo] JO suoyeso] UI pels are sainjonns pue ssurpjing yey) os pausisep st pue ‘6se6esy Jed se squswiaainbas 62 [P4977 2PENY sigysng YUM aul] UT uonejesaa snopiezey WO. syxIeqlas saaaltype “WIN0SZ Uey) arour alayM ‘(s8urping 0] shemaalip ssao7e Suo] YM $}0[ MoLIeU BUC, pue s}0] yoysyey/axe-ayyyeq Surpioae Aq “3'a) saoueldde Sunysyery 10j s8urpjmq 0} ssao.e ADuaSIawWia WwaDYJa 10J Mo|[e 0} adeys pure azis JUalDyNs Jo si ‘UOISIAIpns Jo ued e uo paynuept ‘adojaaua)=s Sulpjinq. ee = sapnpul T'80V 4 "e JO] [eNUapIsas yoe LOV “sprepueys uSIsaq SULId.UISUY 9dSd pue sapoo ‘sap yaa Aduas IAW Jayj0 pue sunysyaty 10j ssaooe ayenbape = ‘e raplaoid syoej sseooe aly pue syeaige.y] 80d SyPeI] SSad0y ally pue syeeiqa.ly ‘Ayradoid pue ajdoad 0} ysl paezey aryysng SasIwIUlM SUIS SUIptng pue usIsap 07 40d usIsaq 107
Page 16
SL Zz/Olis ® GL1 Ald LOSLIHOYV YAHOLLOG NOG14 Aytadoid ‘Aytadoid Zururo[pe ypafqns ay} 0} paurequoo ae sa.msevout uonesnIW [Ty Aue jou pure Ayedoid yalqns ayy uo yno sayduoy —ppal.iied are sainseaul yuoweseuew aiyysng €80V “ADIAIVS andsay pue aI] puejsusend ay} pue [louno) esooNn jo INOARj UE paqyuess SI Jey JUaUIaSea ssagoe ue Ulm pajyes0, aie ‘a ‘seare sumuiny pue skeq Suissed apiaoid ‘p ‘sapotyaa Bunysy aly oj ssaa.e uayoiqun apiaoid ‘9 '%G'Z] JO WaIpess wNWIxewW Be aAey “Gg A xipuaddy vag ‘Se.qou wim sayduioy «9 JO WIPIM wNUTUTW pateap e aay “e yey) pur] pazejedaa Surlpuno.ins pue sjo[ payeai9 ayy uaamjag paplAoid are syoe.g ssaooe 3.1L] Z80V Yo “spue] poqejasaA SUlpuNo.ins pue s}0] payea.1o ayy UseMjeq ‘UOISLAIpqns ayy Jo Jajautiad ayy punole %>G"ZT Jo quautdojaaap 9} JO a1njeu pau] ay 0} anp paiinba. si yuautasea ON uonengs Aouas.1oura ue ul jauuOsiad AdUaSI0UIa pue sjuapises jo uoqenoeaa ay} 10y ssaoe ayenbape pue
Page 17
APPENDIX E STATE INTERESTS BUSHFIRE HAZARD OVERLAY CODE ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 16
Page 18
Assessment Benchmark Compliance benchmark Commentary 4.1 Not applicable Erosion prone areas within a coastal management district 4.2 Erosion prone areas within a coastal management district Not applicable 43 Bushfire, flood, landslide, storm inundation, and erosion prone areas outside the coastal management district Development other than that assessed against (1) above, avoids natural hazard areas, or where it is not possible to avoid the natural hazard area, development mitigates the risk to people and property to an acceptable or tolerable level. The bushfire Mitigation report provides several _— mitigation measures which mitigates the risks to people and property to an acceptable or tolerable level. 44 All natural hazard areas Development supports, and does not hinder, disaster management response or recovery capacity or capabilities The bushfire Mitigation report provides several _— mitigation measures which to support disaster management response including vegetation management, access facilitating service intervention and dedicated water storage requirements. 4.5 All natural hazard areas Development directly, indirectly, and cumulatively avoids an increase in the severity of the natural hazard and the potential for damage on the site or to other properties. The bushfire Mitigation report provides several _— mitigation measures which satisfy this benchmark including vegetation management, access to and within the subject property including access to adjoining properties which satisfy this benchmark. 4.6 All natural hazard areas Risks to public safety and the environment from the location of hazardous materials and the release of these materials as a result of a natural hazard are avoided. No hazardous materials will be stored on site. 4.7 All natural hazard areas The natural processes and the protective function of landforms and vegetation that can mitigate risks associated with a natural hazard are maintained or enhanced. There are no landforms or vegetation on the subject or adjoining sites that mitigate the risk of bushfire ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 17
Page 19
APPENDIX F ACCESS TRACK REQUIREMENTS ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 18
Page 20
3.6, 3.6.1. 3.6.2. 3.6.3, 3.6.4, 3.6.5. 37. 3.11. 3.11.1. 3.11.2. Construct a Fire Trail/Emergency Access track ‘The existing vehicular fire/access trail is to be upgraded to meet the standards set out in the Fire Management report except for gradient. Tuming and protection areas are to be formed with a minimum dimension of 8m in the locations Indicated on the plans Anew vehicular fire trail is to bs established around the building envelopes. This trail is to comply fully with the Standards as set out in this Report All Building Envelopes are to have a 6m wide defendable space, generally complying with the requirements (except for width) of the vehicular fire trall requirements to the whole perimeter. This space is not to be obstructed by structures or landscaping. The road access and all boundary crossings through fences to these trails can be sither a gate or a fence cutting point consisting of strainer posts 3.6m apart with fencing wire between The location shown is Indicative only and can be modified to sult terrain and vegetation. Minimum Vehicular Fire Trail Standards The Fire/Maintenance trail has: -. Aminimum formed width of 4m. A minimum height of 4.8m A maximum gradient of 16% or one that has been satisfactorily test driven with the type of Fire Service Appliance that would be utilised on the site during a fire event with adequate drainage to pravent soil erosion and minimise ongoing trail maintenance Turing /passing areas at a maximum of 400m with a maximum gradient of 5% Provided in accordance with “Fire Hydrant and Vehicle Access Guidelines for Residential, Commercial and Industrial Lots” published by QFES and Qld Government. Fire Trail and Fire Break Maintenance The existing Driveway and any proposed driveways are to be kept in a condition suitable for 2wd Heavy Vehicles at all times. The fire trails are to be kept mowed to a maximum of 50mm at all times and to be kept in a manner suitable for 4wd Fire Vehicles and to the satisfaction of the Fire Brigade. Pectin Aaa natn ELDON BOTTCHER ARCHITECT PTY LTD @ 5/10/22 19
Page 21
APPENDIX G DEDICATED WATER SUPPLY REQUIREMENTS ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 20
Page 22
Proposed Fire Fighting Infrastructure The proposed buildings are to always have a minimum dedicated firefighting water reserve of 50001. This reserve can be in the form of a Tank and must be in place at the time of completion of the new Building. 3.5.3. The tank must be located a minimum of 9m from the nearest bullding, have fiat standing area immediately adjacent, and be no further than 20m from the building and be located between the building and the road. 3.5.4. The tank storage can comprise part of a larger tank providing the normal outlet is positioned to reserve 50001 in the bottom for firefighting purposes only. Provide a 50mm male cam lock fitting outlet with isolating valve for fire brigade purposes only. 3.5.5. The tank is to be of non -combustible materials. ELDON BOTTCHER ARCHITECT PTY LTD © §/10/22 21
Page 23
PROFILES
ELDON BOTTCHER
EDUCATION AND QUALIFICATIONS
Graduate Diploma in Design in Bushfire Prone
Areas
University of Western Sydney
Diploma in Architecture
Queensland Institute of Technology
Certificate of Rural Fire Management
University of Southern Queensland
Registered Architect
Queensland
A+ Architect
Australian institute of Architects
FPA Australia Certified Practitioner (BPAD-Level 3-
16935)
Bushfire Planning and Design (BPAD-LEVEL 3),
Altemate Solutions & DTS
PROFESSIONAL MEMBERSHIPS
Fellow
Australian Institute of Architects
Member
Australian Institute of Emergency Services
Member
Australian Institute of Engineers Society of Fire Safety
Member
Queensland Environmental Law Association.
Member Board of Experts
Bushfire Building Council of Australia
Associate Member
Institution of Fire Engineers
Corporate Member
Fire Protection Association of Australia
PROFESSIONAL EXPERIENCE
Director
Eldon Bottcher Architect Pty Ltd since 1978
Bushfire Assessment and Planning Consultant
since 1998
Group Officer
Albert Rural Fire Brigades Group
Queensland Fire and Rescue Service
Group Officer
Gold Coast Rural Fire Brigades Group
Queensland Fire and Rescue Service
Group Officer
South East Regional Support Group
Queensland Fire and Rescue Service
Planning Officer
Gold Coast Rural Fire Brigades Group
Queensland Fire and Rescue Service
Member Practice Committee AIA Qld Chapter
AIA delegate to Building Industry and Research
Consultation Panel on Bushfire Hazard advising
Queensland State Bushfire Committee
BBCA representation to Australian Standards
Committee FP20 {AS 3959 & AS 5414)
Life Member
Guanaba Rural Fire Brigade
Member
Clagiraba Rural Fire Brigade
ELDON BOTTCHER ARCHITECT PTY LTD
OTHER BUSHFIRE RELATED COURSES AND
TRAINING
1.C.S/AIIMS (40 hr. course) in Incident Command
Systems
Certificate 4 (Workplace Training and Assessment}
RFSQ Level 4
RFSQ Level 2 (Officer)
RFSQ Fire Management 1
RFSQ Crew Leader
Certificate Il in Public Safety (Firefighting Operations)
Fire Weather 1
QELA Expert Witness Workshop 2020
BUSHFIRE RELATED AWARDS
National Planning Award
State Planning Award
Planning Institute of Australia
Gold Coast Bushfire Management Strategy
(Co-I|nitiator and Member of Preparation Committee)
Australian Government
National Medal
Long and Distinguished Service to Fire fighting
Queensland Fire and Rescue Service
Diligent and Ethical Service Medal + Clasp
Service to Fire fighting
Queensland Government
Australia Day Medallion
Services to Rural Fire Fighting
Queensland Government
Year of the Volunteer Medallion
Services to Fire fighting
UDIA
Best Consultancy Team Award in 2007.
SERVICES OFFERED
Bushfire management Reports
Bushfire Safety Engineering
Bushfire Planning and Design
Bushfire Hazard Assessment
Alternative Solutions
Expert Witnessing
(See Planning and Environment Court of Queensland
Determination
File No. BD 624 of 2005 sections 28 to 35)
Continuing Professional Development Lectures
Tertiary Education Lectures and Tutorials
Town Planning Bushfire Codes for Local
Authorities
Bushfire Burn Pianning
General consultancy relating to all aspects of
Bushfire
5/10/22 22