Original source · versioned page text
4 - Bushfire Response
Eldon Bottcher Architect ty. Ltd EJB:VAB: FM 5810 L1 FINO BPOMrcuelk WLCUIECr KIA ra Postal Office 5/10/22 PO. Box 3606 145 Varsity Pde Robina Town Centre Varsity Lakes QLD 4227 . QLD 4230 ABN 61010354604 Mr S Godwin W www.eb-a.com.au P 07 55920082 Ci/- E_ [email protected] F 07 56380374 Property Projects Australia Level 1 618 Brunswick Street New Farm. Attention . Mr S Godwin Project; Proposed Subdivision 43 Summit Road Pomona Dear Sir We, Eldon Bottcher Architects as competent persons have been requested to provide further advice in relation to an Information Request dated 20 September from Noosa Council in relation to the One into Two Subdivision of property scheduled below. 1.1. Address: 43 Summit Road Pomona 1.2, Local Authority Noosa Shire Council 1.3. R.P.D. Lot 3 on SP186019 It is my understanding that the issues have in the main been previously addressed by the Town Planner Mr Marcus McNee of Property Projects Australia, but | provide my further advice in response to the Information Request, in particular Items 9 to 11 in relation to Bushfire Hazard Item 9 a. The report clearly provides a plan which sets out BAL Contours from threat vegetation, a table in Section 2.4 of the report which sets out the distances and respective BAL levels, and support information at the rear of the report provides the computer printouts supporting those distances. You will note that the plan provided as part of the report clearly sets out the proposed subdivision boundaries and the BLE’s within those proposed boundaries. It is quite clear from the plan that the proposed easiern lot has approximately haif of the lot within which a proposed building would be required to be a BAL 12.5 construction, and that there are no construction requirements in relation to bushfire for the proposed western Lot. | attach as Appendix A, a copy of the plan provided in the report. Section 2.4 of the report also includes the following: Construction Levels are shown as part of a comprehensive Bushtire Management Plan. They are provided for the end user of the land and its eventual occupants. They are not provided for assessment by Local Authority, in accordance with the Planning Act 2016, The State Planning Policy, and The Building Act 1978. | attach extracts from the Planning Act (Sections 7, 5&6) in relation to this as Appendix B SL A A LS Architecture | Interior Design | Bushfire Management Planning | Bushfire Safety Engineering ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original