ADAMS + SPARKES Information Response (David Low Way) Reduced_Part2

Attached to the e-mail Information Response - Email 2 of 2 MCU16/0153 & REC16/0041.

of 59

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (28.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                   ENGINEERING SERVICES REPORT
Client: Thomco (No 2087) Pty Ltd                                Location: 215 David Low Way, Peregian Beach


5.0 EARTHWORKS
There will be earthworks required to facilitate construction of stormwater treatment facilities, sanitary
drainage and allow for an aesthetically pleasing and functional built form. There is little opportunity
for fill material to be won on site therefore most of the fill material will need to be imported.

The interface with the western boundary to the Council reserve will require approximately 2.0m of fill
to be placed. It is proposed that a rock filled gabion wall is constructed along this boundary to retain
the fill material. The proposed retaining structure would be subject to Geotechnical investigation and
advice to determine an appropriate design. The photograph below (Figure 6), illustrates the ‘swampy’
nature of the lower area of the site in the vicinity of the proposed gabion wall.




                                   Figure 6 - Low Lying Area of Site

Along the southern boundary with the Noosa National Park, a ‘fill’ wall of approximately 2.0m will be
required. These walls will most likely be of a concrete sleeper, or similar, construction. This would
continue the existing wall in-situ.

Along the northern boundary, ‘fill’ walls of approximately 1.5m height will be required. These walls
will most likely be of a concrete sleeper, or similar, construction.

At the eastern boundary with the Peregian Tavern, some shallow excavation will be required. Care
will need to be exercised during any excavation to ensure that there is no undermining of the existing
block retaining wall (up to 2.0m high). Terracing is proposed at the front of the existing wall to aid in
stability and mitigate the visual impact. Works in this area will be subject to geotechnical investigation
and advice.

Covey Associates Pty Ltd                             5                                  Project No: 162042
Consulting Engineers                                                                    100493RPT Issue B
Log in to download the original file

ADAMS + SPARKES Information Response (David Low Way) Reduced_Part2.pdf · 28.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.