Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

ADAMS + SPARKES Information Response (David Low Way) Reduced_Part2

Attached to the e-mail Information Response - Email 2 of 2 MCU16/0153 & REC16/0041.

of 59

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (28.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                   ENGINEERING SERVICES REPORT
Client: Thomco (No 2087) Pty Ltd                                Location: 215 David Low Way, Peregian Beach

All filling will be in accordance with AS3798-1996 (Level 1).

Refer Appendix B for Preliminary Bulk Earthworks Plan.

6.0     ROADWORKS
Access to the site will occur from Sandpiper Court, through the newly completed Peregian Market
access. An access easement will be established through this area.

The internal road network consists of an access road past the short-term residential accommodation
building and loop road to service the remainder of the dwellings, access the parking spaces for
individual units and other parking areas. The internal road, to the point of access to the carpark, will
be a minimum of 6m wide (typically 11.0m road reserve) with the remainder being 5.5m wide
(typically 11.5m road reserve). All roads are to be of a concrete, inverted crown construction.

It is proposed that the internal roads would cater for a heavy rigid vehicle (HRV) and a rear lift refuse
collection vehicle (RCV) to service the short-term residential accommodation building. Widenings at
horizontal curvature are included to facilitate the larger vehicle movements. Vehicle manoeuvring
paths are presented in the Traffic Impact Assessment by PTT.

Car parking will be provided in accordance with the Noosa Planning Scheme (2006) and is detailed
in the Traffic Impact Assessment by PTT.

7.0     STORMWATER DRAINAGE
The site generally slopes from the David Low Way to the Noosa National Park. The stormwater
discharge point from the site is the Council Reserve to the west. This land is under council control
and the stormwater discharge will not cause an actionable nuisance therefore, as per QUDM (2013),
this is considered a lawful point of discharge.

The stormwater quality and quantity effects of the development will be reviewed in a separate
Stormwater Management Plan (SMP). The treatment of stormwater will be carried out in accordance
with state and local authority requirements.

Road and surface runoff will generally be directed to treatment areas via the concrete inverted crown
road. Roof and surface runoff within allotments will be directed to treatment areas via a shallow pipe
network.

Refer Appendix B for the Preliminary Stormwater Management Layout.




Covey Associates Pty Ltd                            6                                   Project No: 162042
Consulting Engineers                                                                    100493RPT Issue B
Log in to download the original file

ADAMS + SPARKES Information Response (David Low Way) Reduced_Part2.pdf · 28.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.