RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
• Surface roughness and vegetation cover, which influence flow resistance and travel time
• Topographic gradients, confirming alignment between flow velocities and assumed conditions
• Site hydraulic connectivity, including potential depressions or ponding areas, verifying the
appropriateness of the adopted Tc.
Figure 3-2 Max Overland Flow Path (QLD Globe, 2026)
Figure 3-3: Overland Sheet Flow Times (QUDM, 2016)
The impervious fraction for the site was determined to be 8.46%, based on a manual measurement of the total
impervious area to accurately represent existing site conditions in accordance with QUDM methodology. Lot 15 on
C5605 consists of a single dwelling and a shed, Lot 18 on C5605 is currently a vacant lot with an access driveway
partially entering the lot.
Using QUDM Table 4.5.4, the C₁₀ was determined based on the 1-hour, 10 % AEP rainfall intensity of 70.2 mm/hr.
Applying this methodology, a C₁₀ value of 0.70 was derived, as summarised in Table 3-1.
45 MAPLE STREET, COOROY
24 June 2026 P a g e |7
Stormwater Management Plan
Client Reference: P0478-26-001
Prepared for Myall Rise PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.