Table 3-1: Rational Method Key Inputs
Catchment Area (ha) Tc (min) Actual Tc (min) fi C10
Pre-Development 0.3756 14 14 0.08 0.70
To quantify the peak flow rates for various Annual Exceedance Probability (AEP), the Rational Method formula
was applied:
where:
• Q = Peak discharge (m³/s)
• C = Runoff coefficient
• I = Rainfall intensity (mm/hr)
• A = Catchment area (hectares)
The following Table 3-2 presents the calculated pre-development flow rates for each of the assessed storm
events:
Table 3-2: Rational Method Flow Calculations
AEP % 63.2% 50% 20% 10% 5% 2% 1%
Pre-Development Flow (m³/s) 0.050 0.059 0.090 0.110 0.130 0.165 0.188
These calculations establish the hydrological baseline for the site and form the foundation for further stormwater
management analysis. The results will be used to assess post-development runoff characteristics and determine
the necessary mitigation measures to ensure compliance with the QUDM and Noosa Shire Council stormwater
management requirements.
3.3 DRAINS Model and Comparison to Rational Method
The DRAINS model was configured using the appropriate Australian Rainfall and Runoff (ARR) parameters specific
to the site conditions. Inputs for each catchment were derived from the parameters discussed in previous sections,
ensuring consistency with site-specific hydrology and QUDM low residential density development criteria. The
general configuration of the DRAINS model is shown in Figure 3-4.
Figure 3-4: DRAINS model for existing catchment
The existing catchment was modelled based on survey data (refer to the Existing Layout Plan in Appendix C). This
information was used to determine an accurate impervious fraction for the pre-existing site through measurement
of existing impervious surfaces. The relevant DRAINS catchment inputs are detailed in Figure 3-5.
45 MAPLE STREET, COOROY
24 June 2026 P a g e |8
Stormwater Management Plan
Client Reference: P0478-26-001
Prepared for Myall Rise PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.