RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
Figure 3-5: DRAINS Catchment Inputs The pre-development flow rates for various AEP were calculated using DRAINS. The results are summarized in Table 3-3. Table 3-3: DRAINS Results for Existing Catchment AEP % 63.2% 50% 20% 10% 5% 2% 1% Pre-Development Flow (m³/s) 0.048 0.059 0.093 0.112 0.133 0.159 0.179 A comparative assessment was conducted to evaluate the variance between DRAINS results and the Rational Method calculations. The differences between the two methodologies are presented in Table 3-4. Table 3-4: Comparison Between DRAINS and the Rational Method Storm Event (AEP) Rational Method (m³/s) DRAINS (m³/s) Difference % 63.2% (1-Year ARI) 0.050 0.048 3% 50% (2-Year ARI) 0.059 0.059 1% 20% (5-Year ARI) 0.090 0.093 4% 10% (10-Year ARI) 0.110 0.112 2% 5% (20-Year ARI) 0.130 0.133 2% 2% (50-Year ARI) 0.165 0.159 3% 1% (100-Year ARI) 0.188 0.179 5% The results obtained from the Rational Method and the DRAINS model show differences that are within acceptable engineering tolerances and align with expectations given the inherent methodological differences between the two approaches. 45 MAPLE STREET, COOROY 24 June 2026 P a g e |9 Stormwater Management Plan Client Reference: P0478-26-001 Prepared for Myall Rise PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.