Original source · versioned page text
RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
2 Introduction 2.1 Background and Scope RECOR has been engaged by Myall Rise Pty Ltd to prepare a Stormwater Management Plan (SWMP) for a proposed Material Change of Use (MCU) involving the retention of the existing dwelling at 45 Maple Street and the development of the vacant lot at 9 Myall Street to facilitate a multiple dwelling development. This report has been prepared to support the Development Approval Application submission to Nosa Shire Council and any nominated referral agencies. The proposed development’s property details have been summarised in Table 2-1. The SWMP addresses potential stormwater impacts resulting from the proposed development and outlines the necessary mitigation measures to meet both quantity and quality requirements of Noosa Shire Council. This report presents the hydrological assessment of the proposed development, including any external catchments that may directly influence peak flows exiting the site. The purpose of the assessment is to ensure that post- development stormwater discharge does not adversely impact existing flooding or stormwater conveyance conditions on surrounding properties and that the stormwater management objectives of the QUDM and Noosa Shire Council requirements are achieved. Additionally, the assessment evaluates the development requirements for stormwater treatment to ensure compliance with Water by Design guidelines, the SPP, and council water quality requirements. Table 2-1 Property Details Site Details Parameters Site Location 45 Maple Street & 9 Myall Street, Cooroy QLD 4563 Lot Number 15 on C5605, 1 on RP99323, 2 on RP99323, & 18 on C5605 Intended Land Use Material Change of Use for Multiple Dwellings Development Area 3,119 m2 2.2 Stormwater Management Objectives and Design Approach The intent of this report is to document the design considerations and outcomes that satisfy the stormwater management objectives for the proposed development. The strategy has been developed to address the following key aspects and performance objectives: • Catchment Definition: Identification of all catchments and sub-catchments discharging through or into the site. • Hydrological Assessment: Determination of existing flow conditions for multiple storm events and assessment of development impacts on surrounding properties. • Flow Management: Ensuring post-development peak flows do not exceed pre-development flows across all relevant storm events, up to and including the 1% AEP. • Lawful Point of Discharge: Identification and utilisation of a lawful point of discharge in accordance with QUDM, ensuring no actionable nuisance to downstream properties or infrastructure. 45 MAPLE STREET, COOROY 24 June 2026 P a g e |4 Stormwater Management Plan Client Reference: P0478-26-001 Prepared for Myall Rise PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.