• Site Drainage and Conveyance: Development of a preliminary site drainage layout that ensures safe
conveyance of stormwater through the site without adverse impacts on adjacent areas.
• Erosion and Sediment Control: Adoption of construction-phase measures consistent with the International
Erosion Control Association (ICEA) – Best Practice Erosion and Sediment Control (2008) guidelines.
Stormwater management for the proposed development has been designed in accordance with the following
documents:
• Noosa Shire Council Planning Scheme Policy – Stormwater Management
• State Planning Policy (SPP), 2017
• Environmental Protection (Water) Policy, 2009
• Environmental Protection Act 1994
• Queensland Urban Drainage Manual (QUDM) Fourth Edition, 2016
• Water by Design – Construction and Establishment Guidelines: Swales, Bioretention Systems and
Wetlands V1.1, 2010
• Australian Rainfall and Runoff Guideline (ARR)
2.3 Supporting Documentation and Reports
The SWMP is supported by technical documentation and reports which provide the basis for the engineering
recommendations and support the application, including:
• Civil Design Drawings prepared by RECOR, File No: P0478-26-001_Cooroy_Development_OPW
45 MAPLE STREET, COOROY
24 June 2026 P a g e |5
Stormwater Management Plan
Client Reference: P0478-26-001
Prepared for Myall Rise PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.