Table 6.1 - Potential Contaminants and Proposed Treatments
Proposed Treatment
Management /
Pollutant Potential Source Device and Maintenance
Maintenance Procedures
Procedure
Sediment & Excavated material, Provision of sediment and Sand filled filter socks.
Eroded fill material, silt barriers to the site Removal of excess
material exposed ground, drainage entry and exit sand/silt build up at
Stockpiles of points. regular intervals and after
material. every storm.
Dust Stockpiles of Covering the material or Coverage of material with
material, exposed wetting it down at regular plastic, geotextile, surface
ground. intervals. binding agents or regular
watering.
Litter Refuse generated by Construction waste is to Industrial bin is to be
staff. be cleaned off the site provided within the
area and installed into an construction area - to be
industrial bin then emptied on at least a
removed by a refuse weekly basis.
collection contractor.
Concrete Washing of concrete Provision of a closed area Liquids to be removed by a
trucks/tools to onsite for washing off of waste collection
remove wet/unused concrete slurries. contractor. Solids to be
concrete. placed into a refuse bin.
Surfactants Washing down No cleaning of vehicles Monitoring & prevention
(detergents) operations on will be permitted on site.
hardstand area using
detergents.
Chemical Typically this may Where spills occur, the A temporary containment
(Paints, occur due to spillage containment area is to area. This is to be
thinners etc.) of product. stop escape. The material impermeable and of a size
is to be treated (as to permit mixing/transfer,
required) and removed and with a storage volume
and cleaned by a licensed of twice the largest
contractor. container used.
Minor spillage outside this Treatment of spills is to
area shall be cleaned up occur on site. No
with cloths and disposed discharge of treated water
of to waste via the to the stormwater system
industrial bin. is to occur without council
approval. Incidents are to
be reported to the EPA.
Wastewater Spillage from the A licensed contractor shall No leakage is to be
relocation of the remove any residue permitted to enter the
existing sewerage sewage from unused pipes groundwater or discharge
reticulation. and contaminated soils are to the stormwater
to be disposed of via the system.
industrial bin.
Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.