Council archive · source document
Stormwater Management Plan · MCU15/0122
Attached to the e-mail MCU15/0122 - Response to Information Request - Stormwater Mgmt Plan, Bioretention & Rainwater reuse Email 2 of 3.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
15099 - SBSMP/3
Page 19
Option 2
The proposed treatment train has been modelled using the following methodology:
1. Roofwater runoff is captured and directed to a combined rainwater re-use and on-site
detention system which will incorporate 10kL of storage dedicated to external rainwater
re-use. Overflow from the tank will be directed to a proposed bio-retention basin (Bio-
retention Basin 1) to be located at the basement level within the south-western portion
of the site.
2. Surface runoff within the upper level car parking and access area will be captured by
various pits containing litter baskets and then directed to an end-of-line proprietary
stormwater quality treatment device to be located within the upper level landscaping
area.
3. Surface runoff from the exposed ramp and basement level areas along the western site
boundary will be collected by various pits containing litter baskets. Additionally, a small
swale along the southern site boundary is proposed to capture minor quantities of runoff
from the southern portion of the site and convey the flows to Bio-retention Basin 1.
Refer to Table 6.5 for details of the treatment train assets.
Table 6.5 - Proposed Treatment Assets
Treatment Treatment
Description
Level Asset
5 x Enviropod 200 Series Litter Baskets within
the gully pits on the basement level and 4 x
Primary Litter Baskets
Enviropod 200 Series Litter Baskets within the
upper level car park
Primary/ 3m wide grassed swale along southern site
Grassed Swale
Secondary boundary.
10kL of dedicated rainwater storage will be
Primary/ provided as part of the detention system.
Rainwater Re-use
Secondary The stored water will be used for external
irrigation.
Secondary/ Humes - Jellyfish JF-1200-2-1 underground
Humes - Jellyfish
Tertiary stormwater quality treatment device
- 70m2 Filter Media Area.
Secondary/ Bioretention
- 400mm depth of filter media;
Tertiary Basin 1
- 200mm extended detention depth
Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.