Council archive · source document
Stormwater Management Plan · MCU15/0122
Attached to the e-mail MCU15/0122 - Response to Information Request - Stormwater Mgmt Plan, Bioretention & Rainwater reuse Email 2 of 3.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
15099 - SBSMP/3
Page 18
6.2.2 Proposed Treatment Train
Given the current review being undertaken within Noosa Council regarding the acceptance of
various stormwater quality treatment technologies, two separate options have been provided
for stormwater quality treatment for the proposed development. The provision of two separate
options at this conceptual stage ensures that the development can be provided with a
stormwater quality treatment system that meets Council’s future requirements whilst
optimising broader development outcomes.
Option 1
The proposed treatment train has been modelled using the following methodology:
1. Roofwater runoff is captured and directed to a combined rainwater re-use and on-site
detention system which will incorporate 10kL of storage dedicated to external rainwater
re-use. Overflow from the tank will be directed to a proposed bio-retention basin (Bio-
retention Basin 1) to be located at the basement level within the south-western portion
of the site.
2. Surface runoff within the upper level car parking and access area will sheet flow into
two proposed bio-retention basins to be located along the eastern boundary of the site.
3. Surface runoff from the exposed ramp and basement level areas along the western site
boundary will be collected by various pits containing litter baskets. Additionally, a small
swale along the southern site boundary is proposed to capture minor quantities of runoff
from the southern portion of the site and convey the flows into Bio-retention Basin 1
Refer to Table 6.4 for details of the treatment train assets.
Table 6.4 - Proposed Treatment Assets
Treatment Treatment
Description
Level Asset
5 x Enviropod 200 Series Litter Baskets within
Primary Litter Baskets
the gully pits on the basement level.
Primary/ 3m wide grassed swale along southern site
Grassed Swale
Secondary boundary.
10kL of dedicated rainwater storage will be
Primary/ provided as part of the detention system.
Rainwater Re-use
Secondary The stored water will be used for external
irrigation.
Bio-retention Basin 1
- 70m2 Filter Media Area.
- 400mm depth of filter media;
- 200mm extended detention depth
Secondary/ Bio-Retention
Tertiary Basins Bio-retention Basin 2
- 20m2 Filter Media Area
- 400mm depth of filter media;
- 200mm extended detention depth
Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.