Council archive · source document
Attachment 12- Amended Property Vegetation Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (16.7 MB): may take a few minutes to open.
Noosa on Weyba
Property Vegetation Management Plan
Table 3-2 Compliance assessment of the proposed development with the RVM Code (Part P)
Performance requirement Acceptable solution Compliance Assessment
PR P.2: Wetlands AS P.2 Complies with PR P.2
To regulate the clearing of vegetation P.2.1 The proposed development will not necessitate clearing within a natural
in a way that prevents the loss of wetland.
Clearing does not occur–
biodiversity and maintains ecological
The only area where clearance of assessable vegetation is proposed is
processes — assessable vegetation a) in any natural wetland; and
located within 100 m from mapped areas of remnant RE 12.3.5 and RE
associated with any natural significant
b) within 100 metres from any natural wetland; and 12.3.4 that are classified as palustrine wetlands. Note, however, that
wetland and/or natural wetland is
these wetlands are not permanently inundated vegetation communities
protected to maintain — c) in any natural significant wetland; and
but are woodlands that experience seasonal water-logging of soils.
a) water quality by filtering sediments, d) within 200 metres from any natural significant
Due to the proximity of the proposed clearing to wetland vegetation
nutrients and other pollutants; and wetland.
communities, the proposed development will rely on an alternative
b) aquatic habitat; and AND solution to AS P.2.1 in order to comply with PR P.2. Specifically, to
ensure that no adverse impacts to wetlands occur as a result of the
c) terrestrial habitat.
proposed development, detailed impact mitigation measures and
management strategies will be included within a site-specific
Construction Environmental Management Plan (CEMP) that will be
implemented within the site. With regards to avoidance of impacts to
wetlands, particular focus will be afforded to erosion and sediment
control measures.
P.2.2 AS P.2.2 is not applicable as the proposed development is not a
significant community project.
Where clearing is for a significant community project,
maintain the current extent of assessable vegetation
associated with any natural significant wetland and/or
natural wetland to provide—
a) water quality by filtering sediments, nutrients and
other pollutants; and
b) aquatic habitat; and
c) terrestrial habitat.
Northbrook Corporation Pty Ltd Version 3 11 October 2013
5101-19 PVMP v3.docx Commercial in Confidence Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 12- Amended Property Vegetation Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 16.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.