Attachment 12- Amended Property Vegetation Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (16.7 MB): may take a few minutes to open.
Noosa on Weyba
Property Vegetation Management Plan
Performance requirement Acceptable solution Compliance Assessment
PR P.3: Watercourses AS P.3 Complies with PR P.3
To regulate the clearing of vegetation in P.3.1 The proposed development will not necessitate clearing within a
st
waterway. The RE Map recognises a 1 order stream south of the
a way that does not cause land
Clearing does not occur— proposed vegetation clearing Area B, however the vegetation clearing is
degradation, prevents the loss of located ~50m from this tributary of Keyser Creek and is separated from
biodiversity and maintains ecological a) in any watercourse; and this waterway by Hollett Road. Therefore, as the vegetation clearing is
st
processes – assessable vegetation located more than 10m from the high bank of the 1 order watercourse,
b) within 50 metres from each high bank of each
associated with any watercourse is the proposed development achieves compliance with PR P.3.
watercourse with a stream order 5 or greater; and
protected to maintain – Furthermore, detailed impact mitigation measures and management
c) within 25 metres from each high bank of each strategies will be included within a site-specific CEMP that will be
a) bank stability by protecting against implemented within the site so as to ensure that waterways are not
watercourse with a stream order 3 or 4; and
bank erosion; and adversely affected by the proposed development.
d) within 10 metres from each high bank of each
b) water quality by filtering sediments,
watercourse with a stream order 1 or 2.
nutrients and other pollutants;
AND
c) aquatic habitat; and
d) terrestrial habitat. P.3.2 AS P.3.2 is not applicable as the proposed development is not a
Where clearing is for a significant community project, significant community project.
maintain the current extent of assessable vegetation
associated with any watercourse to provide—
a) bank stability by protecting against bank erosion;
and
b) water quality by filtering sediments, nutrients and
other pollutants; and
c) aquatic habitat; and
d) terrestrial habitat.
PR P.4: Connectivity AS P.4 Complies with PR P.4
P.4.1 The proposed development would require clearance of ~0.12 ha of
To regulate the clearing of vegetation in
remnant vegetation and the width of the proposed clearance is ~15m.
a way that does not cause land Where clearing is less than–
In respect of proposed remnant vegetation clearance Area A: the extent
degradation, prevents the loss of
a) 10 metres wide; or of clearance is less than 2 hectares and the proposed clearance area is:
biodiversity and maintains ecological
processes – areas of remnant b) 2 hectares;
a) located on the very southern edge of a mapped polygon of remnant
vegetation are retained that are –
clearing does not– RE12.5.3 which is not connected (or adjacent) to any areas of
Northbrook Corporation Pty Ltd Version 3 11 October 2013
5101-19 PVMP v3.docx Commercial in Confidence Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 12- Amended Property Vegetation Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 16.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.