09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508
Company or organisation name {if applicable)
Part A, Version 3.1, 3 March 2008
a:
approval that inay be issued as @ consequence of this application will be issued to the Applicant}
RECEIVE]
74 OCT 1303
By Noosa Building Certifiers
Tamdecaio Py Uyak
Individual applicant/Contact person (if there is more than one applicant, provide
O Title
Postal address
. oy ;
al applicant details on an attachment to this form)
MR Firstname | (~AJAQ.\ Cre
Last
name
REe\~ooD
qe WicdFrowee STREET Corssittine Ret
Contact telephone number $4480 \ CS
Facsimile number. So4 & OA\Rs.
4
e-mail address tedrood 6d ruses
Details of.the. premises (ie. the tand on which the development is proposed — refer to the advice at the end of the form)
Mobile phone number] (>C-\ 7 FOC CoO Tw
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises}
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to 02.
1.
Name of each local government area in which the mobile and temporary ERA is proposed to operate
OR
TableB Street address for the premises (~ applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
Street address / lot on plan for the premises (4ppropriate for most applications including building applications): ot
. (i) (1 Street address /ot on plan for the fand adjoining or adjacent to the premises (Appropriate for development in water e.g, jetty, pontoon
etc) (Note: Lot on plan details may be obtained from litle documents, a Rate’ notice, or from the focal government.)
(i)
Street address Lot on pian description Local government area (e.g
Unit Street ‘ " Post Plan type and Logan, Cairns)
No. Wo. Street Name and officiat suburbfocality name Code Lot No. Plan Number
1, 102. | Packie. Pues arsinitelasé7 63 |REQA7370] Noose
AND/OR .
Table Coordinates and/or a map of the premises (Aporopizte for develooment in remote areas, over part of a jot, in water (e.g. channel dredging in Moreton Bay) etc.)
Coordinates ;
(Note: place each set of coordinates in a separate row} Reon ce Datum Local iy valent) area
Easting Northing Latitude Longitude .
LJ cpas4 ( weses
CL Other
Page 1
ay
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 68 pages
Page 2
INTEGRATED PLANNING ACT 1997
. 2.
following characteristics, hawever some applications may involve ane or more at these characteristics - comptete only if applicable)
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. nver, creek, lake, canal)
Name of water body, watercourse or aquifer (known)
1.
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on plan description for strategic port land Port authority for the lot
1.
Table F Complete if the premises are in tidal water
Name of local government for the tidal area {/f applicable)
Name of port authority for the tidal area (if applicable)
1.
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may inchide land both above and below water)
Total aréa of premises (land on which the development is proposed)
(oly j2rlo|/O ne OD hectares (appicaote unit)
Existing use of the premises
Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
Part A, Version 3.1, 3 March 2008
Identity if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of the
Rosrdearmar Kose
Se 5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)
yy Oh
Yes ~ Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
Proposal details
6. Brief description of the proposal: (eg. 6 unit apartment building, 30 tot residential subdivision, a bore, aquaculture etc.)
Deconnmodamon Tope OF ~ Hraate\
2
Does the proposal include‘new building work or operational work fiackuding any services) on the premises?
[LINo
Yes - Ensure the nature, fecation and dimensions of the propused works ave included in plans, subraitted with the ‘application
Resource entitlement (applicable) — further information is provided in the advice section at the end of the forin
8. Does the application involve taking or interfering with a State resource and: therefore require a resource entitlement? (eg. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No - Gow Q9 Oo Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable, Evidence of resource allocation or
entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
Nature of State-owned resource
Table G ” [Nature of evidence-required
Ailocation/entitlement na a set . State Government Date of } Date of
reference number Name of authorising officer Position of authorising officer Department issue _| expi
1. :
Owner's corisent (7. applicable) - further information is provided in ihe advice section at the end of the form
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and not
within a canal as defined under the Coastal Protection and Management Act 1995; or'work on rail corridor land defined under the
Transpoit Infrastructure Act 199¢ - provide details (or each owner on a separate row, of on an attachment to this form i applicable.
TableH ~
Premises Owner's name/s
Details of the premises owned eyf signatur | jDate consent
and postal address (street address or fot on plan description) if : 9 was obtained
1. [TAH R Redneck tot PacKe Poe-
1O% Cacwric vee SEseine Beda {
iL (0-09
Tee. Boots
KR
* Owners signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the [PA website .
Page 2
Page 3
a INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Attachments and supporting information (Complete Table |- Use a separate row for each ype of attachment or information, including information required under this Parl) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form. Table | Description of attachment or information Title @ appticabie) Method of delivery to Ce a COLI ee ae Taine oat” _| (eg. Generet Authoriy, James Steet Trafic Repon} Date assessment manager 1. Faas S- Plows Shaminey CORON ILE | Portable Long Service Leave (PLSL) levy (Appticable for certain building and construction work valued over $80,000 only) 10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (~ bax if applicable) (J the application seeks a preliminary approval only; : (7 the application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave) Act 1991, section 3AA (e.g. the application is anly for a change af use. or for the following types of work carried out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests}; all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or @ LD the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 - Complete and submit a QLeave Notification and Payment Form (no payment required if ovmer-buiider permit number stated). The roceipted form must be sighted by the assessinent manager before a develgoment permit can be given. . 11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information) LI No - End of Pat A Yes - Answer Q12 below : 12, Has the PLSL levy been paid? i] No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the Assessment Manager before a development permit may be given for this application, To pay the levy you will need to complete and submit a Notification and Payment Form to Qleave.) . J Yes - Complete Table L and submit, with the application, the “yellow” (Local Government's (Council) / Private Certiier’s) copy of the receypted QLeave Farm. Table Amount paid Date paid (6 Gite wang ABE or Pp) 1. | $1700-00 | 1+ -B-0% COACALS OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional) : . Receiving . Reference © @ Fee (8) Date received officer's name numbers NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER To: Council. | have been engaged as the private certifier for the building work referred to in this application. Date of engagement Name BSA Certification license number Building Gassification’s QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) ‘Amount paid Oate receipted form Oéseription of the work QLeave Project Number 8) Ri Date paid sighted by Name of officer who sighted the form. assessment manager Privacy Statement The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application. _| Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992} or as required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002. . Page 3 i
Page 4
a
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Advice for completing Part A (Fa more detaited advice, refer to IDAS Guide 1 (Making ang IDAS application!
General advice
+ Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible for
answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger
may refuse to receive an application that is not properly made.
« The {DAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act
7975 only, i.e. those applications requiring the comptetion of Parts A and B only.
Applicant details
¢ Ifthe applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided under the IPA.
Details of the premises
« The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is
situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete Table A.
« The premises may be identified in a number of ways—
e Street address and lot on plan are most common and will apply to most applications.
« Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the premises
the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as
Zone Reference or GS84 may be provided.
«The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.
« Strategic Port Land is within a locat government area but a local government's planning scheme does not apply on Strategic Port Land. Strategic Port
Land is declared under the 7ransport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port land) and the ci
@ Queenstand Transport (Ports) website.
« ‘Tidal water’ ts defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is 3
defined in the IPA (schedute 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides) of ‘
establishes the boundary of a tidal area. Land below high water mark is not within @ local government's area unless provided for under the Local Government _ 5
Act 1993. Unless otherwise provided for by legistation, a local goverment has no jurisdiction below high water mark. A tidal area for strategic port land is
within the jurisdiction of the refevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local government tidal area.
However, the IPA gives local govemments jurisdiction for assessing and deciding applications for prescribed tidal works within the local government tidal area,
and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work).
Resaurce entitlement ,
* Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for apptications if they involve taking or interfering with a prescribed State y
resource. Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where evidence is
required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation. Section 3.2.1(10)(a)(ii) states an
application cannot be taken to be properly made without the required evidence.
. « For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the
request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
« For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette
_ Notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
'e Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for
quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark.
Owner's consent
« Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the application
: involves: a.material change of use; reconfiguration of a lot; work on land belaw high-water mark and not within a canal as defined under the Coastal
P * Protection and Management Act 1995; ot work on rail corridor land defined under the 7ransport Infrastructure Act 1994.
e .» Evidence of this consent may need to be provided before the application will be accepted as property made by the Assessment Manager, during the
processes of the application or in the event of an appeal about the outcome of the application.
* ‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent
for the land (or would be entitled to receive the rent for it if it were tet to a tenant at a rent).
« Templates are available from the IPA website for the provision of awner’s consent as an attachment to this form. However other documentation may be used
for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
» Owners consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary ERA.
Portable Long Service Leave (PLSL) Levy
* The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and
construction industry who would be unlikely to accrue enough service with one employer to quatify for long service leave. To fund the scheme, a Portable
Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out in Queensland. : .
The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable
Long Service Leave} Regulation 2002. included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and
| _ Construction Indusiry Training Levy. ,
* The Building and Construction Industry (Portable Long Service Leave) Act 1991(PLSL Act) defines the building and construction work subject to the
PLSL tevy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines,
* fences or earthworks, and works for subdividing, irrigating or draining land,
» The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be isSued.
+ The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be
* completed on the QLeave website at www.gleave.qid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web: www.dleave.qid.gov.au }
Page 4
Page 5
Part E, Version 3.2
INTEGRATED PLANNING ACT 1997
Building &/or operational works assessable
against a planning scheme’
Usiw - lewann
Front Coop
iNature of:the works |” maa
1. Nature of work that requires assessment against a planning scheme:
(J Building work - Complete Table A Operationat work - Complete Table B
Table B
e (i) What is the nature of the operational work?
, ([] Roadworks [X] Stormwater (7) Water infrastructure {[] Sewerage infrastructure
Landscaping (7) Earthworks (J Drainage Works C Signage
- [J Clearing vegetation under the planning sctieme Other - Specify below
Car parking & access, Frontage works, sediment & erosion contro!
-(ii), What type of approval is being sought? (NOTE: if you have indicated mutiple operational works in question (i) above and your answers fo this
question would be different for different operational work, il may be more appropriate to provide these details in an attachment fo this form)
Development Permit ~ * em Reatinimaneappmval- (J Both (Specify below)
{ili) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
No [[] Yes - Specify the number of lots being created .
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot) oo . if.
(No Yes - Complete Table B(a)
Table B(a) "List aF approval references Bate approved
1 Material Change of Use Approval - 2007/2446 17/08/2009
2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 00000-20 |
Mandatory Information.” aes
3. Confirm that the following mandatory information accompanies this application
AS % Zand
© Corifirmation:of 2 ffi esate on
me ’ od of lodgement’
baat lodgement *. *: benae! hee HM, as an
PI ifications if appli i location of th sed includ!
Plans, andspecicaions if applicable showing the nature and location of the proposed works finciucing the Confirmed _ | over the counter
OFFICE USE ONLY
Date Received Reference Numbers
Page 6
of INTEGRATED PLANNING ACT 1997 Part E, Version 3.2 Advice for completing Part E General advice « Part A must also be completed for all IDAS development applications. « The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question, a1 A development permit authorises development to occus, while a preliminary approval is a step in the approval process and does not authorise development to ecur 1 This form is also used for building or operational work assessabte against the land use plan for Caims airport land or Mackay airport land. Wherever planning scheme is mentioned, take it to mean the land use plan for the airport land.
Page 7
e
INTEGRATED PLANNING ACT 1997
ne eames ay ro ERY SEE REN Gye
IDAS Assessment Checklist, Version 22
IDAS Development Applic ion Form Ais the approved | forri'for all development applications under the Integt ed fanning
identifi ed.in-the Table below, must:be
unsure, phone or visit your local government or tog onto.the DIP website www.dip.qld.gov.au for help
‘building work’
Answering the following questions will ‘assist you in ictemiing reer ren ae the checklist must be completed ts your application. if
For all DAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist
Does the application seek approval to make a material change of use of the premises?
ifyes - complete Section 2 of this checklist Dies |[x]No
Does the application seek approval to reconfigure a lot?
if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. If the premises are completely within a single C1Yes |(x}No
local government area assessment is by the local government.
Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist fzlYes |LJNo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? yes | [No
if yes - complete Section 5 of this checklist
Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist DYes |(x]No
Does the application seek approval fo carry out building work requiring assessment against a focal government planning
scheme? CYes |[x]No
if yes - complete Form 1 Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1, CYes |(}No
Assessment is by a building certifier
Do you wish the application fo be assessed against a superseded planning scheme?
if yes - complete Form 1 Attachment 1 DYes |{x]No
:
Is the application for development completely or partly on Caims and Mackay airport land under the Airport Assets
(Restructuring and Disposal) Act 2008?
If yes - Assessment is by the Department of infrastructure and Planning. Complete Form 1 Part D of IDAS Application Form 1 if the CiYes
application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the
local government as Advice Agency.
ExJNo
Page 8
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 22
SE CT lo N A "Section 1 must te coinipleted for ail applications that require ‘completion of the iDAS Assessment Checklist. a
HERITAGE gs. ge Seca
ne
CUB gee +2 ioe a FR Se 3. —
114A ls any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
[]No-Goto118 [_] Yes
IPA. schedule 8, part 1, fabe 5. item 2: IP Regulation, schedule 2, table 2. item 18.
‘#4
1.18 Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
(JNo-Gotoat.2 (_] Yes
IPA. schedute 8, part {, lable 5, item 2A, IP Regulation, schedule 1. part 2. table 5, item 2.
‘REMOVING QUARRY. MATERIAL; WILD RIVER AREA iis... :
1.2 ‘Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
(J No-Gotoa13 ((] Yes
IPA, schedule 8, part 1, table 5, item 1; IP Regulation, schedule 2, table 2. itent 11; 1P Requiation, schedule 1. table 5, item 2 (wild river area): Water Act 2000,
section 966C; Wild Rivers Act 2005, section 43A
IENVIRONMENTALLY‘RELEVANT‘ACTIVITY; WILD RIVER AREA oS. age
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[[]No-Gotoat4 (_] Yes
IPA, schedule 8, part 1, table 2. item 1: IPA, schedule 8, part 1 fable 5. items J and 4: 1P Regulation. schedule 2, table 2, items 1 and 23; Environmental Protection Act 1994, section
73AA (wild river area): Wild Rivers Act 2005, section 43A; relevant wid river declaration; Wild Rivers Code.
‘WITHIN-THE LIMITS OF A VPORT ne Rc eae ae
14 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
(J No -Goto015
Yes
IP Regulation, schedule 2, table 2. items 15 and 16 '
‘au
[DECLARED FISH HABITAT.AREA os): ozs isc viet re
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
(J No - Goto 07.6
O Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
JP Regulation, schedule 2, table 2. item 26
{COMMUNITY INFRASTRUCTURE
1.6 Is any part of the premises designated for community infrastructure?
(J No -Goto.01.7 ‘ :
(Yes
IP Regulation, schedule 2, table 3, item 7
WASTE WATER MANAGEMENT.
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[J No -Endof Section 1 [_] Yes
JP Regulation, schedule 2, table 3. tem 5
Page 9
INTEGRATED PLANNING ACT 1997 . (DAS Assessment Checklist, Version 22
ov!
ee ve >
SECTION 4 -Section 4 must be Sompleidd ‘when the application Seeks approval to carry out operational work. os
PLANNING SCHEME” “2. ge se = Pa ao ee |
44 is the proposed operational work assessable under any State planning regulatory provisions?
(J No Yes
If yes, is the proposed operational work assessable under the planning scheme?
[] No - Answer Q4.1.1- 4.1.7 Yes - Complete Form 1, Part E and answer Q4.1.1- 4.1.7 below
ISTATE-CONTROLLED ROAD" ar ra |
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[No Yes
If yes, is all of the proposed operational work associated with either -
A material change of use that is assessable under the planning scheme, or 0 No (& Yes
Reconfiguring a lot that increases the total number of lots, or increases the total
number of lots abutting the State-controlled road
If no - Answer (a) - (c) befow
IP Regulation, schedule 2, table 3, item 3; IP Regulation, schedule 2, table 3, item 1(b)
‘ACID SULFATE SOILS:
4.1.2 Is any of the operational work proposed in a local goverment area listed*' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils :
[X] No -Go1004.1.3 LC Yes
4. | ,urukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
-Fitzroy, Gladstone, Gold Coast, Heivey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
IP Regulation, schedule 2, table 3, item 4; ‘State Planning Policy 2/02; Planning and Managing Development involving Acid Sulfate Soils, section 3.6
[EASEMENTS AND SUBSTATIONS: idee 7
4.1.3 Is any of the proposed operational work for filling or excavation?
, No - Goto 04.1.4 ,
Yes
IP Regulation, schedule 2. table 3 item 10{a): IP Regulation, schedule 2, table 3, item 10(b)
wo me
4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number t issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
[X] No -Gotoa41.5 (_] Yes
JP Regulation, schedule 2, table 3, item 17
|PUBLIC- PASSENGER TRANSPORT. : :
4.1.5 Is any of the proposed operational work listed i in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
x] [X] No- Go to 04.1.6 oO Yes - This application must be referred to QueenslanidTransport (QT) as Concurrence Agency.
IP Reguiation, schedule 2. lable 3, item 14 .
(RAILWAY SAFETY: AND EFFICIENCY: : ge 8
4.1.6 1s any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No- Go to 04.1.7 O Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, fable 3, item 15
IKOALA CONSERVATION (outside SEQ urban footprint).4:..”
4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
No -Gotoo42 [_] Yes :
IP Regulation, schedule 2, table 3, item 19 -
Page 10
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 22
WILD RIVER AREA .; Although legislation provides for assessment of operational works for residential, commercial and industrial, ;~ -
‘development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of.the wild river ateas apply the Wild Rivers *.
Hae tag apt tag go ne
‘code to thal type of development... a
ee
% fete te, 2.
RESIDENTIAL; COMMERC
“hE UE Re RS
Sse Ae ig peewee jee i weil
+ :
‘AREA’ ~ .
42 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No -Gotoa4.3 {_} Yes
IPA, schedule 8, part 1, table 4, item 2; iP Regulation, schedule 1, part 2, table 5. item T(c)
Wild Rivers code {Note: the code does not currently contain applicable provisions for residential. industrial or commercial development inside a designated urban
area)
"ASSOCIATED WITH.RECONFIGURING A LOT; TAL OR INDUSTRIAL DEVELOPMENT IN A WILD eR
y eee ane aa aa ers aoe ae ee ae
Vee cid
|KOALA CONSERVATION (Inside SEQ urban footprint)
43A Is any part of the premises in an interim koala habitat protection area?
: No -Gotoa4.38 (_] Yes
IP Reguiation, schedule 2, table 2, item 344
\MEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA 2 ee
4.3B Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
No -Gotoa44 [_] Yes
IPA, schedule 6, part 1, table 4, items 1A-1G; iP Regulation, schedule 2. table 2. item 5 (vegetation clearing): IP Regulation. schedule 2, table 2. item 34 (koala
conservation); IP Regulation, schedule 1, part 3. table 4, item (vegetation clearingwild river area); Vegetation Management Act 1999. section 22A, (vegetation
clearingAwild river area): Wild Rivers Act 2005, sections 31F and 43A
TAKING OR INTERFERING WITH WATER; WILD RIVER ARE
44 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No -Gotoa4s [C] Yes- Answer(a) and (b) below
IPA, schedule 8, part 1, table 4, items 3a): IP Regulation. schedute 2, table 2. item 8: IP Regulation, schedule 1, part 3. table 4, items 3 and 3A; Water Act 2000, section 9664 (wild river
areay: Wild Rivers Act 2005, section 43A: relevant wild river declaration; Wild Rivers Code
4.5 . ‘ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No Goto Q4.6 O Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8. part 1, table 4, item 3(6); IP Regulation, schedule 2. table 2, item 8: IP Regulation, schedule 1. part 3, table 4, item 3
Wild Rivers code {Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
No -Gotoa4.7 —[_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1° table 4, item 3(c}(i): IP Regulation, schedule 2, table 2. item 8: IP Regulation, schedule 1, part 3, table 4. item 3; Water Act 2000, section 966A (wild river area).
Wild Rivers Act 2005, section 4A: relevant wild river deciaration: Wild Rivers Code.
47 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No -Gotoa48 [_] Yes
IPA, schedule 8. part 1, table 4, item 3fc){ii): P Regulation, schedule 2, fable 2, item 8: IP Regulation, schedule 1. part 3 table 4. item 3
Water Act 2000, section 966A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water}
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
: interfering with overland flow water (other than using a water truck to pump water)?
No -Gotoa49 [[] Yes - Answer both (a) and (b) below
IPA, schedule 8, part 1. table 4, items 3{c)fi) and Ya): iP Regutation, schedule 2, table 2, item 9; IP Regulation. schedule 1, part 3. fable 4, item 3A; Water Act 2000, section 9668 {wid
river area); relevant wild river declaration: Wild Rivers Code. . . .
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
O1No LT Yes
Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% (J No LD Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This appication requires assessment by the Department of Natural Resources and
Water (NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. 7s
IPA, schedule 8. part 1, table 4. item 4: IP Regulation. schedule 2, table 2. item 10
‘TIDAL WORK; WILD RIVER AREA _
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No -Gotoa4.11 {_] Yes - Answer (a) and (b) below /
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12, 14 and 17; IP Regulation, schedule 1, part 3, table 4. items 4A and 5
Coastal Protection and Management Act 1995, section 1044 (wild river area)
(COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
No - Go to 04.12 ag Yes
IPA, schedule 8. part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area); Wild Rivers Act 2005, section 43A
WATERWAY BARRIER WORKS; WILD RIVER AREAS".
4.12" |s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gotoa4.13 (_] Yes
JPA, schedule 8, part |. table 4, item 6: IPA, schedule 8, part 2, table 4, item 2; Fisheries Regulation 1995 $113A (self-assessable codes); 1P Reguiation, schedule 2, table 2, item 28; IP
Regulation, schedule 1, part 3, table 4, item 6; Fisheries Act, 1994, section 76D (wild river area); Wild Rivers Act 2005, section 434.
DECLARED FISH \ : :
4.13 (s any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No '- Go to 04.14
[1 Yes
IPA, schedule 8, part 1. table 4, item 7; IPA, schedule 8, part 2, table 4, tem 3: Fisherles Regulation 1995 113A (self-assessable codes): 1P Regulation, schedute 2. table 2, item 25; 1P
Regulation, schedule 1, part 3, table 4, item 7; Wild Rivers Act 2005. sections 43A; Fisheries Act,.section 760C (wild river area).
IREMOVAL; DESTRUCTION OR DAMAGE OF A:-MARINE PLANT; WILD-RIVER AREA‘: ;
4.14. Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994? °
No -Gotoo415 (_] Yes
IPA, schedule 8, part |, table 4, item 8, IPA. schedule 8, part 2, table 4, item 4: Fisheries Reguiation 1995 $113A (self-assessable Codes): IP Reguiation, schedule 2, table 2. item 29: IP
Regulation, schedule 1. part 3, table 4, item 8; Fisheries Act 1994, section 76DB (wild river area); Wild Rivers Act 2005, section 43A; relevant wild river deciaration; Wild Rivers Code.
enn
WILD RIVER ARE
Press
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
[XK] No -Gotoa416 (_] Yes
IPA, schedule 8, part 1. table 4, item 10: IP Regulation, schedule 2, table 2, item 37, Wild Rivers Act 2005, sections 42, 43A
ISTATE-CONTROLLED ROAD i
4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controfled road?
No -Endofsection4 (] Yes
IP Regulation, schedule 2, table 2, item 3
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22 Disclaimer: . White the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form.
Page 13
BUILDING AND CONSTRUCTION INDUSTRY ~ QLEAVE PROJECT NUMBER
' NOTIFICATION AND PAYMENT FORM
_ FORM BCI 10 V2
PO Box 512 Lutwyche Qid 4030 FREECALL PH 1800 803 481
A.B.N. 89 586 619 186 :
PART1 PAYER DETAILS , Crear
Has the payer lodged a notification with QLeave previously? Y/N N. _ "tyes, please insert customer number if known (Contact OLeave).
Wino, leave blank
E045963
Payers Legal Name Tamobrojo Pty Ltd
Payers Trading Name Flashpackers Contact Person (FULL NAME)
(if applicable) WARICK
Payer ABN REDWOOD
(if applicable) :
Daytime.Phone No.
Postal Address 4 Wildflower St , SUNSHINE BEACH Postcode 4567 = 9417700942
NOTE: QLeave will typically correspond with the party named as the Payer In this section, Correspondence may indude: letters, invoices and refurids
PART 2 .PROJECT DETAILS
Project Description HOSTEL CONSTRUCTION
Lot 163 Plan No. RP897370 Local cil SUNS Certifier Noosa Building Certifiers ‘Contr Phone; 4424778
Mires 102 PACIFIC AVE, , SUNSHINE BEACH _Posttode- 4567
Estimate your 45/09/2009 EPS sate 02/2040 Rerrence No” .
Project Owner TAMOBROJO PTY LTD
Principal Contractor (if appointed) - Refer to instructions for definition
Legal Name TAMOBROJO PTY LTD
Principal Contractor ABN
. . : “Phone No. 04 1 7700942
eee mee
Customer Type: [Australian Gov
Other x
Local Gov
State Gov
hy
Place ‘x’ in appropriate box
. te
(Refer to Instructions) PrdjectyT ype: [Houses Other Res Commercial | X {Civil : | Minesite
PART 3 LEVY / FEE PAYMENT (att amounts ARE TO BE SHOWN TO THE NEAREST WHOLE re
*, ~ us Sh :
{COST ORWORK No payment or form, requited if work is lass than $ 80000 °°. Ny A $ 400,000
“Hh 78 “<, * cn Roo ON
If the work i red by an Owner Builder Permit issued by BSA; QL: must be notfiied of the iNER i
See acest tom staid OseeMtt hares wrorcaeme OWNER BUILDER PERMIT Op
Form” ety
a % 90.2% Portable Léng Service Leave Levy 0.00425xA=B
COMBINED ofstNe, . 0. xA=
@ LEVIES/FEE so A288 Workplace Health & Safety Fee tie 0.425% of A) $ 1,700
00.1% Building and Construction Industry Training Levy
LESS EXEMPTIONS (Refer to instructions) EXEMPTION CATEGORY c
YOUR PAYMENT (GST not payable on the Levies or Fee) B-C=D $ 1.700
YELLOW - LOCAL GOVERNMENT'S COUNCIL/PRIVATE CERTIFIER'S COPY
BCTF 100 [$400.00 PLSL 200 | $800.00
| dectare that the information provided in this form Is true and
aS 4 0) 16) wate) (TO BE SIGNED AND DATED) correct to the best of my knowledge and belief.
Name WARICK REDWOOD Date 14/08/2009
$500.00 *
Nae 5 PAYMENT SLIP
Payers Name Tamobrojo Pty Ltd E045963 woes
Received
PhoneNo. 9417700942 . 14-Aug-0'
Amount $ 1,700
Rees;
FM/LV/00047-12 QLeave is coflecting the information on this form for the purposes of administering tha Building and Construction indusiry (Portable Long Service Leave) Act 1991. 2s required by
that'Act GLeave may give some or ail of this information to various other Government departments and agencies, as required or permitted by law.
Page 14
SS asl oe is s+ sss ss ew property bowioay RAINWATER TANK DETAIL CHECK VALVE L.21kw PUMP EQUAL TO RAINWATER PUMP DETAIL 31F00S 8 ee ACIFIC AVENUE c ‘GROSS POLLUTANT TRAP DETAIL GENERAL NOTES ‘MO PAY AL FEES OE. D)ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE LOCK. AUTHORITY AMANG JURISDICTION AKO WIN THE REQUIREMENTS OF ALL RELEVANT AUSTRALIAN ‘STANDARDS. S)DONAAN WOERT UEVOLS AND LOCATIONS OF AU. DOSTING SERVICES PRIOR TO THE INSTALLATION OF ANY ASSOCIATED SERVICES. 5) THE CONTRACTOR IS TO ASCERTAIN THE EXACT LOCATION OF ALL EXISTING SERMCES PRIOR TO COMMENCEMEXT OF CONSTRUCTION AND SHALL BE RESPONSIBLE FOR THE COST OF RECTCATION OF ANY DAMAGE WICH MAY OCCUR, THE LOCATION OF BUSTING SERVICES SHOWN ON THIS DRAWING (5 REPRODUCED FROM LOCAL AUTHORITY RECORDS ETC, FOR WHICH NO OPINION ‘Saat 15S EXPRESSED AS TO THE ACCURACY OF ‘NO SHALL GE DEEMED TO BE FULLY AWARE OF SITE CONDIMONS. ‘ANY CLAIM. FOR VARIATION ON THE BASIS OF LACK OF KNOWLEDGE OF SITE CONDITIONS SHALL NOT GE ACCEPTED. iv " SUBSTITUTED PRODUCTS MUST HAVE PERFORMANCE AND LONGEVITY CRITERIA EQUAL TO OR GREATER THAN THE SPECIFIED PRODUCT. DOCUMENTED PROOF OF SAD CRITERIA WAY BE REQUIRED. STORMWATER & DOWNPIPES 1) ALL STORMRAIER ORNNAGE SHALL OE 100 OA AT 1X FALL UXO, 2) OOWNPIPE SIZES STATLD AME MNMMUM REQMURED CROSS-SECTIONAL MATERIALS: DOWNPIPES PVC CLASS Dwy STORMWATER (UP 0 225 DA) PVE CLASS SW HEAW UNO A fias/s CPERATONA, WOU. Rei Spe in REVS, SSG) GATE ses py SPICE CONSULTING 24 CONSTRUCTION HYDRAULICS CONSULTANTS Poth Po BOX 1408 Super 4855 [9 OBSA Fecsimie O7 5445 3824 wr 1124616 Email - [email protected] AHSCA poet GARY WILBRAHAM L FASSOCIATED CONSULTANT RANG = LeveL: AMD v SITE STORMWATER MANAGEMENT = foe | COVER SHEE! Al— $:100 Nola AS—_1: 200 — PRET ® i PROPOSED VISITOR HOSTEL opis Ar ‘ 102 PACIFIC AVE pee ¢ | SUNSHINE BEACH 895-SWM1) “1 oO 2
Page 15
9,
Be {
“
oO %
Le Oe
3 ALL WORKMEN ARE RESPONSIBLE FOR REPORTING OF EQUIPMENT DAMAGED
OR WW NEED OF REPAIR
4 ARRANGE FOR CLEANING AND MANTENANCE OF ALL EGUPMENT AS REQUIXED.
Ss) PROWDE ADOMIONAL SLT FENCES AS REQUIRED TO ENSURE ALL SEDAMENT 1S
COLECTED OW SITE.
6 SIE SUPERVISOR SHALL BE RESPONSIBLE FOR ALL WSPECTIONS, EXTENSIONS &
MAINTENANCE AS. REGLARED.
TASKS / ACTIONS
PERFORMANCE UCKCATORS,
FREQUENCY / DEADIKE
°0%
ca BrEReY boundary
MN
——,_ []\_ a samc
|
>. 4 “
4 e f i SEDUENT CONTROL FARRIC a
“PROPEX OR SRILA AP ROD, cL oe
$ i & j————— TOP EDGE 10 BE Ma. eh
FO 260, wana cu-OFF ony =~ GERM (300MM MIN HEIGHT)
I q ~~ FALL =
| ¢ pte
J é wm Sorat EXCAVATION GEOTEXTLE vane”
| SUN. consstauenon extey / Gur MATERA, woes.
J f ur BAER stommtca nun-orr Anat
2, I i> TEMPORARY SILTATION CONTROL FENCE eae ae if
Bean Sai
OS | a concneTe sonny CONSTRUCTION ENTRY / EXIT
rors . DETAIL
Oey \ > 2 =a RTA Wie wer ro
, 3 TON
| = O cob bron J
; 2 i
1 3 NG
1 = ellie
| e :
t t aie FIELD INLET
T H ie WITH SEDIMENT BARRIER
| H : Be .
i oF - an - ee ee
\
] } . on
ra | | w ail in Kb NS
HG Lis L 50.467 “
DS, 4s ‘“
oe PP
§ ew CONSTRUCTION ENTRY / EXIT
| : e (REFER DETAIL)
ce %, 1 gee ao
eso, | 4 so
Sal | + \ . 00.5% —
oF » H 7 a, 7
> , . ow
& Ot gg gg gg SEE I as} y A
| Urzzz777727 272 727ZZZZZZ I at tT TI SE I
t ,00. Ptoperty boundary
|
t
&
&.
xe
Oo %,
2 i {
ONTROL LEGEND
EROSION CONTROL NOTES ENVIRONMENTAL ISSUE___| ACTION EROSION © : r
1 CONSTRUCTION OF ALL SEDOIENT MANAGEMENT OCMGES SHALL BE COMPLETED AND OBIECINE / TARGET COMPLY WeTDh ALL STATYTORY REGARATIONS AND SLTATION CONTROL FENCE III I 9 : |
EFFECTIVE PRIOR TD; MADTAIN THEM DURING EARTHWORKS. AND 2875 1 A epee PUTER, WOES, Ret Spice
A STRIPPING OF TOPSOL AND GRASS EOHESTRCTION, COMPLY Tn THE EROSION Ss Be LT eon | aust galt ee San
T Sbces wetaianon STF eae WOOE, CSE sont (FELD BEET SEDOMENT GANRER) ry SPICE CONSULTING L
2 PERODICALLY CHECK FENCES, GARRIERS AND GULUIES FOR CONDITION MAWAGEMENT STRATEGY Scion OF SORGHATER toes owes AS CONSTRUCTION HYDRAULICS CONSULTANTS
OF EQUIPMENT ‘SHOWN ON THIS PLAN, PROVIDE BARRIERS AND PO BOX 1406 BUDERIM O 4556 Cc
wer
AHSCA
fy
“hh
ose
11424616 Emad - randal@firepok comau
GARY WILBRAHAM
} ASSOGATED CONSULTANT
DRANG = :
SEDIMENT & EROSION CONTROL ve
. ‘SCALE:
L DETARS Al~ 1:00 + r
A3-_ 1: 200 |
“ | PROMECT NOS i
4 PROPOSED VISITOR HOSTEL Ops, L
4 102 PACIFIC AVE
SUNSHINE BEACH
Page 16
Saiemchars C Werwm ZONES ag, OD LNG A,
Cotter trargenPHO08 «12 Pact: Ave
om)
DOHELS @ 300 CRS BITUMEN COAT AND CAP
DIP GALVANISED. (OR RAMSET EQUIVALENT.) Oo) cong 688 r
FT2 FABRIC 40 TOP . APPROVED MASTIC SEALANT. SILICON JOINT SEALANT. UIGHTLY TORED & DISCONTINUE FABRIC
/* EDGES. deere FROM END, me EDGE,
7 = V7 - -
te
Ty <— = + E i S g Hi2 TRIMMER BAR
aI A eerste 8 (50 EDGE COVER}.
— LAP 300, PROVIDE
ttt > é lemme BACKER ROO, 0 « 450 CORNER BARS,
CAP BITUMEN FILL, #2 ce (2mm
XPANSION JOINT JOINT SEALANT SLAB EDGE THICKENING
* NOT TO SCALE,
{NOT TO SCALE) (NOT TO SCALE) i & CONCRETE ,
EDGE OF BUILDING, COLUMNS, BOLSTER CUT SLAB (3w x 30d), FILL JOINT
MANHOLES, PITS, ETC, TO Imm BELOW SURFACE WITH DOW CORNING
REFER TO SEALANT OETAIL. THROUGH KERB. 888 SILICON JOINT SEALANT,
DISCONTINUE FABRIC 40 FROM EDGE,
RIMNERTBAR (50 EDGE COVER).
TRINSERRBREVIDE 450 1 450 CORNER BARS,
CUT EVERY SECOND WIRE DIRECTLT UNDER
JOINT AND DEPRESS FABRIC LOCALLY.
CARPARKING SLAB. f LA’
MESH 40 TOP COVER.
20 FOSROC EXPANDITE BITUMEN IMPREGNATED
FIBREBOARD (BITUMEN CONTENT FULLT BOUND)
OR EQUIVALENT.
CONTRACTION JONFTO LEP)
ATION JOINT ALTERNATIVELY, SAW CUT SLAB IN LIEU OF
(NOT TO SCALE) BOLSTER CUT Su x 30d WITHIN 24 HOURS
OF CASTING SEAL AS ABOVE.
NOMINAL FACE
OF KERB 1 REFER TO SEALANT PAINT FIRST CAST FACE WITH BITUMEN,
DETAIL, TOP Tarn OF CONCRETE TO REMAIN
UNPAINTED,
DISCONTINUE FABRIC JAPER | IN f2 (TYP).
cl 40men FROM JOINT.
- _ CONSTRUCTION JOINT, ‘ _1
3 RIO @ 400: ° . +
a2 8 ¢ L__. g
age |_-300__|
Foe 3 BAR FIITM. en ap NI2 TRIMMER BARS (50 EOGE COVER),
LAP 300, PROVIDE 450 » 450 CORNER
$0 BTM ¢ SIDE COVER, mans.
ARPARK SLA Al BARRIER KERB - TYPE B KEY nt
(NOT TO SCALE) (OT TO SALE) N32 CONCRETE
a ere PAVEMENT JOINTS TO EXTEND THROUGH
KERB WITH ADDITIONAL TOOLED JOINTS AT
TIDPOINTS (3000 CRS MAX),
135 TMK SLAB ON GROWND TO
: CARPARKING SLAB, | LAYER F72
1 THICK SLAB ON GRAND. TO | eat en coven DRIVEWAY € CARPARK DETAILS
150 THICK SLAB TO/ORIVE, £ 475 THICK SLAB TO CROSGOVER.
1 LATER F72 MESH 50 TOP COVER CROSSOVER TO BE IN ACCORDANCE
WITH COUNCIL'S SPECIFICATIONS prorcary acanuny _|
(REFER TO DRAWING ROO5.I.) BOLSTER CUT SLAB r 30D). SANCUT ar caaSTOE FOOTPATHS.
| LAYER F72 MESH APPROVED PREFORMED (see wore)
lorem CORKIOINT oF 30 TOP COVER. METAL KEY . T4
coneere roarean]
CARPARK PLAN Ss tH
CUT EVERY 2nd WIRE DIRECTLY UNDER
ALL GETARS TO BE bY EXPANSION JOINT ¢ DEPRESS FABRIC LOCALLY.
ACCORDANCE WOTH susan JOINT (ED) FOOLED JOINT (TJ) KEYED JOINT (KJ)
SAW CUT SLAB 36300
AND NOOSA REQUIREMENTS, Te, tine
gives Sioa FOOTPATH SLAB DETAILS
= TERED DMCS (14) 0 an 3S rs. (TO BE FOUNDED ON MATERIAL OF FIN SAFE
BETES DOTS 0) en CS BEARING CAPACITY lokPe.)
2 s 0
pe es
SCALES: F100, 1:20
PROPOSED BUDGET ACCOMODATION b os jRIENMAC PUY TO srmucitia cient | CARPARK SLAB PLAN Baas: AR [oateSEPT “OA
02 PACIFIC AVENUE, gs scant ere ETM CM A € DETAILS
& Hrevod original sue SUNSHINE BEACH Sig soe Sea ArT 0 coast ort, Sl A
Pi_|aravo] PRELIMINARY ISSUE. for TAMOBROJSO PTY LTD rr I ag RTE TE © Breouae Rect, . Ons No.| ISSUE
We. | DATE AMENDMENT 7 ISSUE PROJECT MAME SLSR AD Fairlie on aad O50 6 Ree Oe | eocnel ox es ceases [Tes Pum & CoP PROTECTED Br eipewd FIV tTD, | OOM Sauk oF camecs | Al [SHEET | OF 4 (CHECKED,
Page 17
NOTES.
FOUNDATION DESIGN [5 BASED ON REPORT No. 09/0517 BY GLOBAL I, REFER TO APPENDIX A FOR SITE
TESTING, REFER TO THIS REPORT FOR SOIL CONDITIONS EXPECTEO ON ORAINAGE REQUIREMENTS AND APPENDIX B
SITE. IF ACTUAL SOIL CONDITIONS VART SIGNIFICANTLY FROM THOSE FOR SITE PREPARATION ¢ EARTHWORKS
IN THE REPORT. CONTACT ENGINEER FOR RE-APPRAISAL OF FOOTING DETAILS.
NOTE. DESIGN, j .
re THE SOIL TEST INDICATES APPROX. I700mm DEPTH OF LOOSE SAND 2, THE MINIMUM ALLOWABLE BEARING
zr MATERIAL IS PRESENT ON THIS SITE, BORED PIERS SHOWN ON FOOTING ALL FOOTINGS TO BE FOUNDED IN MATERIAL OF MINIMUM SAFE CAPACITY AT UNDERSIDE OF FOOTING
ae ey PLAN ARE TO EXTEND THROUGH THIS MATERIAL AND A MINIMUM OF BEARING CAPACITY W0kPo, ANY FILL MATERIAL BENEATH SLABS IS BEAMS SHALL BE IO0kPo, UNLESS NOTED
4500 CONCRETE PERS I 300mm INTO MEDIUM OENSE SAND OF MINIMUM SAFE BEARING TO BE COMPACTED IN LAYERS TO ACHIEVE A MINIMUM UNIFORM OTHERWISE,
AS DETAILED ts 192 CAPACITY WOkPo, A LINER IS LIKELY TO BE REQUIRED TO CONSTRUCT DENSITY OF 98% STANDARD COMPACTION,
| THESE PIERS. (F DIFFICULTY iS ENCOUNTEDE DURING CONSTRUCTION ; 3, THE ENGINEER IS TO S& NOTIFIED IF
L OT THE PIERS THEY MAYBE CONSTRUCTED WITH SCREW PIERS OF EARTHWORKS: \ VARIATION OCCURS BETWEEN SOiL
-- Wee Ww TUNIMUM SWL-ISOKN, SUBMIT DETAILS TO ENGINEER FOR APPROVAL, DEMOLISH ALL EXISTING SLABS AND FOOTINGS ON SITE, CONDITIONS DURING CONSTRUCTION AND
ergs Fer 7 - FOLLOWING SITE STRIPPING, THE BUILDING AREA, DRIVEWAY AND THAT NOTEO ON BORELOGS. ADVISE
Ht 5 CARPARKING AREAS ARE TO BE SATURATED AND COMPACTED WITH A ENGINEER IF ROCK IS ENCOUNTERED IN
bz rari FIN, a) FOOTING EXCAVATIONS.
‘a mt (0 TONNE ROLLER TO A MINIMUM OF 98% STANDARD COMPACTION, ANY
At i FURTHER FILL MATERIAL PLACED BENEATH SLABS TO BE COMPACTED 4, SLABS TO BE CAST ON SOmm (£20mm)
It ' IN LAYERS TO ACHIEVE A MINIMUM UNIFORM DENSITY OF (8% LAYER OF COARSE SAND,
ig ‘te STANDARD COMPACTION, i
an t $. MEMBRANE TO BE 0.2m POLYTHENE
a rm THE BASE OF ALL STRIP AND PAD FOOTINGS IS TO BE SATURATED (or EQUIVALENT) LAPPEO 200 AT JOINTS,
a ' AND COMPACTED WITH A VIBRATING PLATE COMPAL TOR. CARRY DORN 200mm OOWN FACES DEEP
BEAMS,
at SB sw C1 = FULL HEIGHT CONTROR JOINT TO MASONRY.
retard ircia baornh GALL REINFORCEMENT TO BE IN
-----.- Fees aoe ACCORDANCE WITH ASI302 AND ASI304.
Bl - 17iu3% Fla Cont SPAN, 1
Ca Tear 5 COUN,
! 7, ALL CONCRETE WORK TO BE IN
ACCORDANCE WITH AS300, Fie = 25MPa,
ea a OO ae
B._ ALTERATION TO SITE CONDITIONS
3+ ROWHO FLA SHETS © 480 CRS MX. AFTER THE HOUSE IS COMPLETED BY WAY
PP - (OtN80 FIA POLE PLATE, rita ov cea, OF LANDSCAPING, HOUSE EXTENSIONS OR
CHEMICAL ANCHORS TO BLOCEMALL AT cron, TREE REMOVAL CAN EFFECT THE STABILITY
DDS AND 8 600 CRS PAX, LAYER P02 MESH 30 TOP COVER, OF THE FLOOR SLAB, THE GHNER SHALL
eRonor GRAMICAN BACGTLt Mika REFER TO THE BUILDER BEFORE MAKING
Bean ALL RFTANGNG MALL SUCH CHANGES,
PROVIDE PF3 PAD FOOTING -~ $ 4. ALL WORK NOT OTHERWISE SPECIFIED
UNDER EACH C4, PE 1S TO BE IN ACCORDANCE WITH THE
lon om F AUSTRALIAN DOMESTIC CONSTRICTION
FIX BEARER TO BLOCKWALL A woo {IE _| WOERE RETANDMG HECHT EXCEEDS (00mm,
via ANGLE, TO WPLTIPII TILA Ab e “ TCKEN SLAB ON GROUKD 10 Bo TH MANUAL, OLD EDITION,
BEARER, 2/12 CHEMICAL COPPACTED ALL, AS SHOW, EXTRA LAYER FIZ M fo, WHERE BRITTLE FLOOR COVERINGS
ANCHORS TO BLOCKWALL, Barton covtR (TUES, ETC) ARE TO BE USED. SLAB
CONCRE) BLotK MESH 1S TO BE INCREASE TO F942 FOR THE
fe muen we AFFECTED AREA OR DELAY FOR MINIMUM
avpnoven watenpncor OF THREE (3) MONTHS THE PLACEMENT OF
MEMBRANE THE FLOOR COVERINGS.
eae riztry Top 8 BTM
Wo Ties 9 coo ens, ws cover NOTES
PROP WALL UNTIL REINFORCEMENT LAPS, U.N.O. 1
RIC = 2 CROSS WIRES (750mm,
SLAB OVER (5 CAST, Fay APR > 2 EROES FIRES (3eommd
CONCRETE WORK SHALL BE IN
pty ACCORDANCE WITH AS 3600
AININ Fe = 25 MPO
= - SLAB FABRIC SHALL BE SUPPORTED
Rarer mene | O vone oF ingrectiCn
ROUN D F OO AB, N AN Ase aa REIFORCEMENT SHALL BE PLACED
LOOR SLAB/FOOTING PL firme | Reba aa
(00 2448 OM GRouNO
Playa rez nese
” Tor Coven
40 sano oe.
WATERPROOF
MEYGRANE - TTPICAL,
AS PER FB)
RID TIES @ 600 CRS.
WIZ VER BARS @ 400
B TAILS TAP S00 WITH td
@ 400 CRS, LAP 450 to Aa OF CREO.
WHERE REG'D @ AT (ATER #7) MESH 10 Tap covER,
g PROVIDE GRAMAAR BACKFILL 6 AGG,
g DRAIN COMMECTED TO Se LONE
TiMWER DECKING ON GEUNO ALL RETADING MALLS
So cron oh kao
NNN
Nt2_VER BARS @ 400 CR
CENTRALLY Of MALL. LaP 800 ||
HATH STARTERS «460 WITH
‘SLAB HIESH
oF bes 10. $02 HORTONTAL BARS @ 400 E Bombe coxraok JoxTs
PATCH FOOT REDE. SF2 DETAILS
|xTRA 2-m12 BARS (OR 3 BAR APPROVED WATERPROOF
a3 SOS EN? ONES Sur comnees ig STARTERS © 400.cRS to/ orenane
OF RECESSES aNO VOXDS, —
fez rapa TOP
i} RO CORR. aw
8 i
}_2 4 8
EOOTING STEP STEP_IN SLAB DETAI
CORNER == DETAILS
CORNER DETAIL
TYPICAL FOR ALL CORNERS OF ALL RECESSES 4ND woIDS
Soe ALES, TOO, V8
PROPOSED BUDGET ACCOMODATION b pa RIENMAC PIV uD erat "ge ta | SLAB/FOOTING PLAN Bean AA _]oate SEPT
log PACIFIC AVENUE, | Cn ce ee won wom # DETAILS 521A
A. P1Rv04 SLAB CHANGED To TIRER DECK - ORIGINAL sequ@PUNSHINE BEACH k " paid advens PO ton Wer Picea ee, ap oy aoa consi ortee. crane} wae
Pt [4v0"] PRELIMDLARY ISGUE. for TAMOBROJO PTY LTD Jeahoce GF 508 B00 Fast OT eate | tore OM aE a .
tio. [Data “AMENDMENT 7 (S5UE PROJECT MAME Hobiler- 0404 685 43 fe Saat Eeteratpecrepsoma: | Same) ON THs ORANG [Tas PLAN 6 COPY PROTECTED or epee PI eT, [cour scar ar owoxs. | Al [SHEET 2 Ds
Page 18
+ BESS pumas sia OF RUD b COLINCTIN TH AL ARORTEETURAL a6 [APPENDIX A_reaurmoirs ror SITE Deawact. | APPENDIX B SITE PREPARATION AND. cartons | + ALL FOOTING EXCAVATIONS SHALL BE CLEAKED OF LOQSE FATERIALS AND WATER,» (0 Mlanedi ruar Or ruariaty BRAG CAMTRETEN a EL AB ATR PUCTEA, EOETON, . CONTRACT: NOTIFY THE SUPERINTENDENT BA GTI aur nm GR 1S TO MOTIF BA ETI OF (A enmne AT NOE 86 BREED AY a AACR LOF M4 CEEATRAITD AO ADMOCTURES TO BE USED IN THE CONCRETE MUX. NO ADPEXTURES TO SF USED © WHERE VERIFIED FOUNDATION MATERIAL 5S BELOW THE UNDERSIDE OF FOOTINGS WOTHOUT APPROVAL OF THE SUPERINTENDENT, CALCIUM CARORIDE WL NOT GE POI TED ne SUL NOT BE BRED Gnloee IT COREUPOTONES, AS DETAILED, BACKFILL ADOXTIOHAL EXCAVATION WITH WEAK FICK CONCRETE, | COuRETE TestWc = s4L TESTIG GULL BE BY PROACT ASHES 43 pen * OEE GE FOOTINGS SHULL BE FRED AS MECESSAT WEN EXCAVATED FACE ALL BARS ARE NI2 UNO | ALL FORMMORK TO BE DESIGNED, CONSTRUCTED AND REVOVE #1 ACCORDINKE ALL WALLS AND COLUPDS SHALL BE CONCENTR HATH SUPPORTING FOOTIMS, UNLESS OTHERWISE NOTED ON THE DRAWINGS, BARS @ 300 CRS MAX UNO WOTH AS36N0, SUIPERUNTERDENT, SHALL e@ BARS IW THIS DIRECTION TO BE PLACED OVTERNOST CLASS OF FORTHORK TO BE wi ACCORDANCE WITH A596, TABLE 5.34 ee eae Wise ind Lnar CRON He MEAREST INDURADE CORD APS eee Q oan Foote. TUNITLN COVER ‘AGL REINFORCEMENT, UNLESS NOTED OTHERWISE SHALL BZ AS. “STRUCTURAL STEELMORK NoTES: + THE FACE OF ALL CONCRETE AGADEST HORGH NEN CONCRETE &% TO BE CAST 15. next rarep- FomteD- NOT FoRnED- MoT POSED = POSED 1 4 a WEATUER «GRO, WATER GROUND, ETC, orvese. ce oR HEATHER SB, MOKATES COMPLETE PENETRATION FULL STRENGTH BUTT WELD, S.P, (SPECIAL PURPOSE) CATECORY WELDS SHALL BE LSSED FOR WELOING OF ALL oust 2 * °e STRUCTURAL STEEDNOME, oem “ ° ° ALL EXTEDUL, STEELHGRE TO BE HOT OP GALVANISED. rooms - 2 « ‘ALL OXTERIAL, STEELWORK TO BE HOT DP GALVANISED, AFTER WOT DIP we » o 0 GALVANSONG, SURFACE TO GL DECREASED AND UGKTLY ABRASIVE BLASTED (BRUSH GLAST) ROTH. A NOM RETALLIC ABRASIVE (4g, FINE GARNET) TO PROVIDE aL s © « ‘A PROFILE FOR ADMESICN OF COATING, PANT WITH AW DITERSEAL 670 (2 PACK ees Regt BUILD CPRacT MASTIC) HIREPURT Fd PUCRONS ORY PLM THICKNESS OPTIONAL |, TOP COAT (FOR COLOUR) OCTERTHANE 0 (ACRTUX POLYURETHANE) HITH A + NO SOLES GREATER THU Scr, CHASES OR EMEEDMENT OF POPES GREATER MDEPU DR FUT THIGUESS OF 60 FOCRONS. THAN adden OTHER THAN THOSE SOMO OF THE STRUCTURAL ORAWDICS SHA RECOAT ASY OAPUGED SECTIONS CURING KGTALLATION HITH WTERSEAL 610 AS GE PUDE BI THE CONCRETE SLABS HITHOUT PRIOR APPROVAL OF THE ABOVE, FOR PUNTDUSCE REPAR, FRESH WATER WASH HAND POKER TOOL SUPERDITENDOMT. FOR ALL OTHER CONCRETE HEMGERS NO PEXETRATION, ~~~“ CLEAN ACCORDANCE WIT THE AUSTRALUN'STANCARDS AND REAP GUSES OR EFGEDMENT SSALL BE FADE WITHOUT PRIGR APPROVAL OF THE OMTEREEAL 690, AS ABOVE. ALL DETAILS 70 BE IK ACCORDANCE WITH SUPERNTOOONT, INTERMATIONAL PROTECTIVE COATINGS. SPECIFICATIONS. CONDUITS CAST INTO CONCRETE MEMBERS SHALL BE SPACED AT MaxPan ALL BOLTS TO BE Mlb 44/3, UMLESS NOTED OTHERHASE. DISTANCE POSSIBLE AMD USDER MO CIRCLISTANCES CLOSER THAN A CLEAR SPACE SPACDK OF THOCE THE LARGER COMOUT OUMETER FROM PARALLEL REFORE FAGRICATION 15 COPED THE CONTRACTOR SHALL SUBTUT WORKSHOP REMFORCENDIT OR ANT OTHER COKDUT, CRMDKS TO THE SUPTRNTEXDOMT FOR REVI, + ALL REDRORCENDIT SHALL BE SECURELY SUPPORTED Bl ITS CORRECT POSTION THE CONTRACTOR SHALL PROVIDE AND LEAVE 81 PLACE UNTIL PERMANENT OURNG CONCRETIN BY APPROVED PLASTIC TIPPED BAR QUIRS, USOT BRUCING ELEADITS ARE CONSTRUCTED, SUG TOTPORARY BUACING AS COMTRES OF SUPPORTING GUUIRS SHALL BE 60mm FOR FABRIC, <tr FOR NECESSARY TO STABIUSE THE STRUCTURE DURING ERECTION, BARS UP TO tive, Scdrren FOR BARS Keren AID GREATER, + ROOF ANOJOR HALL SHEETING SHALL. BE FLIED TO PURLINS CR GTS + CORSTRUCTIN BREAK LOCATION AND DETARS SHALL GE APPROVED BY THE ACCORDANCE WITH HARLFACTIRER'S SPELICATION, SUPEREITENDENT PRIOR TO CONMOLEMENT, CLOURHORS NOTES 10 BE TROUGLY REOUNCALLY SCABBLED, FULLY EXPOSING TUE AGGREGATE © + BLOCKHORK SHALL WOT BE FLED TO A MEAT OF GREATER THUN 2400, PATROG SURG ANT ONE FOUR, + ALL CONCRETE SURFACES ARE TO CURED FOR SEVEN DATS AFTER CASTING USING + CORRETE BLOCKS TO HAVE & CHARACTERISTIC STRENGTH OF fare MaorURL A METHOD APPROVED BY THE SUPERNTEXDENT. RL WALLS AXD SLAB THRCKENING PARALLEL TO BAR. ALL BLOQGORK MATERIALS AND MORIMUNSHIP SHALL COMPLY HATH AS53700. LOCKS FOR USE bi REDIFORCED CONCRETE FULED WALLS SHALL BE 20.48 ¢ MB BUCT SE AND LOCATION OF PRIETRATIONS ARE TO BE CATABIED FROr ‘SERS. WORKSOP DRANONLS PRUDR TO SCEORMG OF SEBECRCOONT, AND ABE WOT 1D EXCEED OPEXSIONS MHERE SLOHM Oh STRUCTURAL DRAWAGS, + PORTAR SHALL BE IID BY MEDUMICAL TIXERS 01 ACCOROANCE FOTH ASLZS 1H THE FOLLOWDIG PROPORTIONS BY VOLUME OF- PORTLAND CEMENT + WTDRATED + REMFORCETENT 15 SHOW DIAGRAPFUATICALLY AND NOT NECESSARILY IM TRUE UNE | GLEN PT Seb, PROKECTION, = BELOM OUD CORSE LEV fs 0% 1 3 = ABOVE OANP CORSE LEVEL Ft + UNDER MO CIRCUMSTANCES 1% REDFORCIFENT TO OE GUT Gi SITE TO CLEAR * all GLOCKS SHALL BE LAID OW A FULL BED OF rozTaR, PENETRATION WITHOUT APPROVAL BY THE SUPERINTENDEXT. DRSPLACE REINFORCEMENT SUGITLY AS RECESSARY TO CLEAR BLOCKOUTS. + AL WALLS SHALL BE BONDED OR TIED AT THER DITERSEC TIONS, SPUCES Di RERFORCEMENT SHALL BE MADE ONLY WY THE POSITIONS SHOE OF REMFORCED CONCRETE MUSCAT HALLS SHULL GE FALED WITH GROUT OF Fe « AS OTHERBSE APPROVED GT THE SUPEROTDDONT, 2rPa SUPP « ZArren: MADPLM AGGREGATE SZE = Srv: CLEAN OUT BLOGS SLL BE BRLOTED 8 TE BOTTOM COURSE AMD ALL, FORTAR WELDING OF REMFORCEMDIT SHALL MOT BE PERMITTED LETHOUT APPROVAL BT DROPPRGS RAKED CUT POOR TO FEUD ‘TUE SUPERINTEXDENT. + GROST FALLS SUALL BE TAEROUGLT RODDED USE A PLAS SOUND BAR. RERFORCEMENT SHALL BE GENT COLD Wi ACCORDANCE KIT AS3600 EXCEPT WHERE APPROVAL BY THE SUPERINTENOENT, NO RIBDNOOG SHALL BE TOBE NOTES: PERMITTED UNLESS APPROVED BY TUE SUPERINTENDENT. + ALL TEER ELEENTS AMD CONSTRUCTION DETAR ARE TO COMPLY WITH THE SETARS CEN MH ASKCES MATIONAL THTAER FRAPS COOK HON CLASSIFICATION + ALL TRUSSES TO GE OESAGMED BY THE TAMFACTURER TO THE MOD LOAD ‘Proren. DE Trice mLFACTIRER © TO SULIT Te TED TO TP FIRST FLOOR TOP REINFORCEMENT PLAN SLAB REINFORCEMENT PLANS ran AA DATESEPT 4 NOTES s3fA PROPOSED BUDGET ACCOMODATION lo2 PACIFIC AVENUE, a. bred onicaa 1ssuE SUNSHINE BEACH Pi 149/08} PRELIMINARY ISSUE. for TAMOBROJO PTY LTD = =e OG Ko, | ISSUE Wo. | OATH AMENDMENT 7 ISSUE PROJECT MANE suoai ox nas cea: [Tas ue S COP PROTECTED BY eibrwc pry LTD, [oown scarcer commas, | Al fuer Sor 4 lowcneo.
Page 19
. i.
g-
PY AS, 1108
Crermesta argeirn005 «107 Pete hee Cacpeceere +9 WHbTanaMZBO eg, SBOOTCON ITS
SO
2
ee
SECEER SCHOINE av NOTES
DESIGN WWD SPEED » WIND CLASEIFICATION NB = ASAE,
ALL TINGER EXPOSED TO THE HEATHER TO BE DURABILITY CLASS 7 OF
t BETTER,
LAMBEATS POSED TO THE WEATHER ARE TO BE PROTECTED WN
ALCORDASCE WITH MANUFACTURERS SPECIFICATIONS,
f. THEDOWN EOS OF ALL LINTELS AND ROOF BEAMS WITH Li ANCHOR
wi BATTENS (METAL ROOF) - 3675 fll @ 900 CRS MAX. UTirren Mo ld
r TERE 1? SCREW TO Eat RAFTER ¢ TRUSS,
: ROOF FRAMING TO BE TRUSSES @ 800 CRS MAK, UNO,
GT = GiebeR TRUSS.
IT - Sack TRUSS @ 600 COS Max,
T - TRYSSES @ 900 CRS MAY TO MANUFACTIRER'S SPECIFICATIONS.
SUNLDER TO SUEFST TRUSS LATOUT TO ENGINEER FOR CONFIRMATION OF
UNTEL SES, ETC.
TRUSSES TO BE DESICNED
CANTILEVER OFF THIS WALL
EOGE OF SLAB
(An LOGP TREATED To 10
EXTOD TRUSS TAILS TO. 1
o
‘
1
oL_,
TRUSSES TO BE DESIGNED TO.
CANTILEVER OFF Tuts WALL
%
12 NINCATES PLYHOOO RALED TO STUDS 4S PER METHOD A OF AStbd
a TABLE BIB(h) AND HOLO DOWN ROTH ANCHOR RODS AT EACH EO TO.
AQAEVE 6.4034m BRACBK, STRENGTH, .
(2H NDICATES HARDIES MERE CEMENT SHEETS HELD DOWM WITH ANCHOR
RODS AND NAILED BY ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS
TO ACIREVE 2k BRAGG STRENGTH.
LC DHOKCATES OD) HARDKES SHEETING BRACING SYSTEM INSTALLED IN:
ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS TO ACHIEVE 6.484
BRACING STRENGTH {ANCHOR RODS REQUIRED),
BR - Mile CROGS ROO BRACING [email protected] EACH,
ALL BRACING HALLS ARE TO BE CONNECTED TO THE CEILING FRAMING AS
é
5 aoe Jo Lt GRACING DETAILS AS PER ASDA ~ PART 2 FOR NS KIND CLASGIFICATION,
=
ws PER ASIGS4 TASLE 8.22 TO TRANSFER THE DESIGNATED FORCES.
i
:
i
5
i
ey (Ge CON ALEMT TO PREVENT BODOG) ee
BETWEEN VERTICAL SURFACES 92 BOLT
PROMDE 2 CATERS OF scloe BETHEDY HORI SIRPACES Tatealo FA vat oz BARS @ 500 cas MAX + $00 LOM yt] eee ent ae ree
(0n EEUWALENT To PREVENT BONDS) MTU M2 BARS @ 300 CRS Pa » 5 LON *S Go tats Suan sar vei sENaecrO SCIONS ms 2 oe Bal Oto oF bass) 1]!
: BEL ASSDrOLY HOt OP CALVINEED,
BETHEDI HAL SURFACES ANGLE (FIN SO CFri EACH END OF BARS) Utz TREWIER 01 EACH CORNER a L Le
ASSEPELY HOT DiP GALVANIZED, \ Ro omra “t
I = c
Fs —} J H
é fs 8 i
Tv @ 300 CRS MAX, WITH 300 LEGS, N
é mH ‘TOP ¢ BTM REQFOCEMENT "Wa T’ BARS @ 500 CRS MAX. WITH 500 LEGS. RY TO EACH BP 1 z
U2 TRIFER DY TAGH CORNER LAP AGTH SLAB TOP 4 GIrt REINFOCEMENT 28 i
S148 TOP 4 BTM REDFORCEMENT LAO? TRIFIER bi EACH CORNER
EXTERD INTO CORBEL (50mm EKO COVER} SLAB TOP ¢ STH REBFORCEMENT 10
‘TURM COGS ON SIDE @ HECESSART EXTEND INTO CORBEL (Soren END COVER) KN
PROVIDE Wiz @ $00 CRS exTRA ‘TURN COGS ON
NOT om
m
=
mH #2
im
--------f{f--it-
a
SECTION r ROOFBEAM PFI DETAILS
zB
SSS SD TO_BLOCKWORK . : *
PROPOSED BUDGET ACCOMODATION coe RIENMAC ety cto 32h "Bit S| FRAMING PLANS aaa
lo2 PACIFIC AVENUE, BBA rc eee OTE ct srmicrnaL BLUES | DPT AIS ae
4 HIAVOF ORIGINAL ISSUE SUNSHINE BEACH i Bg oS Soe Bae RAs conse core S4|A
Pi [4-vor] PRELIMINARY ISSUE. for TAMOBROJO PTY LTD ere Sore Newsome 6 Seauae tos, WG No,| ISSUE
Wo. | DATE "ARENOMENT 7 ISSUE PROIECT Kane - BES tee Corton eee cans | suovet ov Tass caeas [Tas Aol 5 Cory POOTEETOD by Roene Pry vo, [bow seas or memos [AI [auett 4 oF 4 lolecKED,
Page 20
separate d
landscaping
30.165m, 133° 0 0°
Property boundary ~
completely - see
permit details
fall 15°
w
N
y property !
Z
landscaping
fail 12.5° ---~
12,5°-——----->
fall 15° --------~~
SS <an-----fall 12.5°
Refer to |
and Opera
Conerete
Details
Works for
t Design.
+
5,000
+
PACIFIC AVENUE
-PROPERTY DESC, LOT 163 RP 897370
SITE ADDRESS 102 PACIFIC AVE.
‘SITE SUBURB’ SUNSHINE BEACH
PROPERTY NO: 8568000000000
SITE AREA 1014 m2
WIND DESIGN W42 N3
MISCELANEOUS NOTES:
SEE DECISION NOTICE 2007/2446
BUILDING DESIGN
EXTERNAL LIGHTING ASSOCIATED WITH THE USE
OF THE BUILDING SHALL BE DESIGNED,
INSTALLED, OPERATED AND MAINTAINED IN
ACCORDANCE WITH SECTION 3 OF AS 4282
(Control of tha Obtrusive Effects of Outdoor lighting).
ENERGY EFFICIENCY
ALL HOT WATER SYSTEMS INSTALLED SHALL BE
EITHER SOLAR SYSTEMS; ELECTRIC HEAT PUMP
SYSTEMS; OR LP GAS SYSTEMS.
ALL NEW KITCHEN, LAUNDRY AND BATHROOM
FITTINGS SHALL COMPLY WITH THE AAA WATER
CONSERVATION RATING SYSTEM AS OEFINED BY
THE AS/NZS 8400 (Water Efficient Products - Rating
and Labeling 2003) and AS/NZS 3500 (National
Plumbing and Drainage Standard Part 1), WITH
TOILETS TO COMPLY WITH THE AAA WATER
CONSERVATION RATING SYSTEM.
ALL NEW TAPWARE AND SHOWER ROSES SHALL
NOT EXCEED A MAXIMUM FLOW OF 9 LITRES
PER MIN, DISHWASHERS AND WASHING
MACHINES ARE EXCLUDED FROM THIS
REQUIREMENT.
ALL PATHS, RAMPS, DRIVEWAYS AND PARKING
AREAS SHALL BE DESIGNED AND
CONSTRUCTED TO ENSURE PEDESTRIAN
SAFETY USING NON-SLIP MATERIALS, TO
PRODUCE AN EVENLY GRADED SURFACE FINISH,
AND TO BE IN ACCORDANCE WITH THE
DISCRIMINATION ACT 1992 AND AUSTRALIAN
STANDARD 1428.1 DESIGN FOR ACCESS AND
MOBILITY,
ROOFWATER AND STORMWATER DRAINAGE
ROOF RUNOFF FROM ANY NEW BUILDING SHALL
BE DIRECTED TO A RAINWATER STORAGE
SYSTEM OA TANK THAT IS INSTALLED TO
ENSURE WATER FROM THE TANK iS USED FOR
EXTERNAL USES (such as watering gardens,
irrigation, ornamental ponds, water features, topping
up swimming pools, outdoor cleaning etc. and for
ground floor use In washing machine cold taps and
tollet systems.) ALL RAINWATER TANKS ARE TO BE
DESIGNED AND INSTALLED IN ACCORDANCE
WITH THE QUEENSLAND DEVELOPMENT CODE
{QDC) CURRENT AT THE TIME OF BUILDING
APPROVAL, AND SHALL BE PART OF THE
PLUMBING APPLICATION FOR APPROVAL.
ALL STORMWATER DRAINAGE INCLUDING ROOF
WATER OVERFLOW FROM THE RAINWATER
STORAGE SYSTEM SHALL BE COLLECTED AND
DISCHARGED SO THERE IS NO NET INCREASE IN
STORMWATER RUNOFF FROM THE SITE.
SEWER MAINS
THE EXISTING SEWER MAIN THAT TRAVERSES
THE SITE AND THE SEWER MAIN THAT RUNS IN
THE ADJOINING PROPERTY AT THE REAR OF THE
SITE AND THE 'ZONE OF INFLUENCE' (taken as
the area within a 45° angle measured from the invert
of the sewer main to the finished surface level)
SHALL BE ACCURATELY LOCATED AND
OETERMINED BY A LICENSED SURVEYOR. NO
STRUCTURES REQUIRING A BUILDING PERMIT
(@.9. buildings, swimming pools, retaining walls
exceeding 1m in height, ralsed terraces) SHALL BE
CONSTRUCTED WITHIN THIS ' ZONE OF
INFLUENCE’ OR WITHIN 1.5M OF THE
CENTRELINE OF THE SEWER MAIN, WHICHEVER
IS THE GREATER,
Desenconcert
Garry Wilbraham Designs
PROKCT
BUDGET
ACCOMMODATION
102 Pacific Avenue
Sunshine Beach
TAMOBROJO
PTY. LTD.
POT tine
_ Development Approval
SUES AL oT — BRET HOT
origi —St
tocaC oii
Main Slab=52,200
a iia a
Nall In Kerb=50.467 AHD
aE
4:400
RESON ETA
refer to revision Indax for Info
Ne Pane nn 7
Global Testing Pty Ltd
RSTO ERGER
Rienmac Pty Ltd
TRS CDT
Spice Consulting Pty Ltd
‘SA Bn Di NTA
Mim Leece
BLECTRICA CONSULTANT
RPG Consultants 7
© Copyright 2009
©
Ye 5 3g
Io pm =
2 Q 2
wo s i
fall 12.5%------> a; v
1 |
\ |
2
2
' 23,000 Litre Rainwater Tank he S
Under Deck-Refer to Details r °
y On Hydraulics Site Drawings.
. m \ graded path
i 5 dD \
' 88 g Fence to Future Detail
ine & 7
i —_—F
ax i
4 ~ EASEMENT A _
A 33.600m, age Oe
t property boundary o
I
CODE -
1 Site Layout 100 Scale On A2_1:100
| GENERAL NOTES
| PROCEEDING WITH WORK.
. ALL WORK TO COMPLY WITH THE BCA, ENGINEERS DRAWINGS, THESE ORAWINGS AND
ALL OTHER RELEVANT TECHNICAL LITERATURE FOR THE STATED TERRAIN AND WIND CATEGORY.
. STRUCTURAL DETAILS TO COMPLY WITH AS 1884 PART 3 FOR A WIND CLASSIFICATION 7.
F CATEGORY N3 UNLESS NOTED OTHERWISE IN THE ENGINEERS DETAILS.
. FIGURED DIMENSIONS ALWAYS TAKE PRECEDENCE OVER SCALING. DO NOT SCALE 3.
; FROM DRAWINGS EXCEPT FOR THE MOST BASIC CALCULATIONS,
STANDARD TO SUIT THE PURPOSE AND FREE PROM ANY DEFECTS SHOULD DAMAGE OCCURON A
ANY. 4 OCCUR ON
| SITE, NOTIFY THE DESIGNER OR OWNERS REPRESENTATIVE FOR INSTRUCTIONS PRIOR TO
8. CONTRACTORS SHOULD VERIFY THAT ORAWINGS DISTRIBUTED TO SUBCONTRACTORS OA SUPPLIERS ARE THE
CURRENT VERSION AS DETAILED IN THE SPEC. OR AS ADVISED WHEN NEW DRAWINGS ARE ISSUED. CHECK VERSION NUMBER
AND ISSUE DATE NOTED IN ALL TITLE BLOCKS AND REVISION SCHEDULE ISSUED ON ALL UPDATES,
. REFER TO STRUCTURAL ENGINEERS DETAILS FOR BRACING AND TIEDOWN, STRUCTURAL STEEL SIZES, CONNECTIONS,
FOUNDATION AND CONCRETE SLAB DETAILS. :
THE CONTRACTOR SHALL VERIFY SITE CONDITIONS AND FAMILIARIZE HIMSELF WITH CROSSFALLS. SURFACE LEVELS
AND CONDITIONS, ACCESS FOR VEHICLES AND POSSIBLE OBSTRUCTIONS PRIOR TO QUOTING OR UNDERTAKING ANY WORK.
. WHILE ALL CARE AND ATTENTION HAS BEEN TAKEN IN THE PREPARATION OF THESE DRAWINGS, CONTRACTORS HAVE
A DUTY OF CARE TO SCAUTINIZE AND REPORT ERRORS AND OMISSIONS. IF CONFUSION EXISTS AS TO WHAT IS REQUIRED, THE
CONTRACTOR SHOULD INFORM THE DESIGNER FOR CLARIFICATION AND INSTRUCTIONS PRIOR TO UNDERTAKING OR
9. THE CONTRACTOR SHALL VERIFY THE DIMENSIONS AND CLEARANCES OF ANY
EXISTING STRUCTURES OR OBSTACLES ON SITE WHICH ARE RELAVENT TO THE
BUILDING WORKS BEING UNDERTAKEN IN A SAFE AND EFFICIENT MANNER.
10. INSTALL ANTI-EROSION-CONTROLS AS REQUIRED BY THE LOCAL AUTHORITY OR
AS DETAILED BY RELEVANT
Ve WHERE A DETAILED
CONSULTANT.
SPECIFICATION IS INCLUDED IN THE CONTRACT
DOCUMENTS, THE SPECIFICATION SHALL TAKE PRECEDENCE OVER THE DRAWINGS.
12. WORKMANSHIP SHALL BE OF A HIGH STANDARD, UNDERTAKEN IN AN EFFICIENT
MANNER WITHOUT UNDUE DISRUPTION TO NEIGHBOURING PROPERTIES AND THE SITE
SHA ee LEFT IN A CLEAN CONDITION WITHOUT ANY EXCESS BUILDING RUBBISH OR
t
1
Page 21
GENERAL NOTES WATER SUPPLY & % . 2% Y)ORTAN ALL NECESSARY APPROVALS FROM ALL AUTHORITIES HAVING JURISDNCTION 1) Ow & Hew TO INDMOUAL POINTS (S158 ULN.O. Ko) y AND PAY ALL FEES QUE. me or THE 2) HW IS 15® THROUGHOUT UNO. 2)ALL WORK SHALL COMPLY WITH THE REDUREUENTS LocaL, asTHORITY oe SA aT NY eT The. REGUREMENTS OF ALL RELAVAAT 3) GW TO MORE THAN 1 POINT SHA BE 209 OR GREATER aoe sewezs mat ©) SI es OE ANSE LTTE? at 80° oF * * ‘S)CORARW INVERT LEVELS AND LOCATIONS OF ALL EOSTIRG ne z SETALLAMON OF ANY ASSOCIATED SERVCES. v 5) SZNG (0 209) REFERS. 70 Tee cOPeER. MEE. eR OORESE ORAMmICS ARE A DUGRAMMATC REESESEIDATION OF, PROPOSED Senaved WATERALS. Grawincs FOR, SET OUT OF, PENETRATIONS ELATING TO PLUMBING. FIXTURES. 6) IN NO CASE SHALL A 158 COLD GRANCH EXCEED Jem iN LENGTH RESPONSBIUTY STALER ORDINATE THE ON=: Te Re NT eS SST LATIONS. AND STRUCTURE. 7} POSMON SERVICES I CEIUNG SPACES AND WALL FRAMING UNO, DO NOT SCALE THESE ORAWINGS. i 5) JONTS IM PRESSURED MATER SERVICE PTS UNDER FLOOR SLABS ARE HOT 5) THE CONTRACTOR IS TO ASCERTAIN THE EXACT LOCATION OF AU. EXISTING PERMTTED. SERVICES PRIOR JO COMMENCEMENT OF CONSTRUCTION AND SHALL BE 9) ALL N-GROUND VALVES SHALL BE ENOLOSED WY APPROVED PATH BOXES. Cee OR ne ae Noun OM tes DRANING fo 10) FLOW RESTRICTION OEVICES SHALL BE FITTED WHERE TAP FLOW RATES SEAS Puts inary cons ie Yoe Nat Mo Cos PRES Se INO Sel EA EXPRESSED AS TO THE ACCURACY OF Sw ‘ HAN oe eT Flows VO SSNS, SINKS, SHOWERS 6)'AS-CONSTRUCTED’ ORAWMOS—_ WHERE REQUIRED BY THE LOCAL AUTHORITY ARE THE & TUBS TO A UAXIMUM FLOW OF 81/5. RESPONSILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL RECORD ALL 41) HOT WATER PIPE INSULATION SHALL FULLY COMPLY WITH AS3500.4:200. CHANGES TO ORGMAL DESGN AND ALLOW ALL COSTS FOR THE PREPARATION OF 'SECRON 8. WIKIMUM R VALUE OF 0.3. "<S-CONETRUCTED OFABDICS. + 12) TAP OUTLET POWTS SHOWN ON PLAN ARE INDICATIVE ONLY, REFER TO T)AS_A_CONDITION. OF TENDERING, THE CONTRACTOR SHALL VISIT THE SITE ARCATECTURAL AND/OR END ELENT SPEGINCATIONS FOR PRECISE OUNT LOCATIONS, ‘AND SHALL BE DEEMED TO GE FULLY AWARE OF SITE CONDITIONS. ‘att CLAM FOR VARIATION ON THE BASIS OF LACK OF KNOWLEDGE OF SITE CONDMONS SHALL NOT GE ACCEPTED. + ao oe S) WHERE 4 PARTICULAR MANLEACTURERS PROOUCT IS SPECIFIED OR NOTED, Wind THE REQUAEMENTS OF THE LOCAL ALITHORITY SOE eS RS eT MPERTORMANCE WD i 14) PROMDE A S00KPa PRESSURE UMITING VALVE ui Lone RIEDATELY DOWNSTREAM OF TRE WETER CAMERA EOUNL TO OR GREATER Than THE SPEGFIED PROOUCT. ACRONITRILE BUTADIENE STYRENE, TYPE 8 COPPER, COPPER ALLOY 9) ALL PLUMBING SERVICES THAT PENETRATE BUILDING ELEMENTS REQUIRED =( yung, SORES aL POSTRATE Suetee MS ices Server, Poo. emma UD Lu PERFORMANCE LEVEL OF THE BURNS aren pose, WITH LOATATIONS AS STATED WN AS 3800. OBTAIN BRAND AHO WOOEL APPROVAL FROM THE GUNLDKG CEATIAER ) PRIOR YO THE BSTALLATION OF ANY FIRE COUAR. x AL HOT AND SOLD, ATER SEC aD a Te Das TS BUILDING & OF TYPE C CONSTRUCTION. PROVIDE FIRE STOP COLLARS TO ALL ENCASED_N_CONDUT DISTANCE WWCLUDING ENTRIES FNC PLUMBING WHERE REQUIRED WW ACCORDANCE WITH SPECICATION 1.0 TABLE $ FROM THE SAB Fi FORMWORK. ACROMTRILE BUTAMENE STYRENE Zz OF THe BCA, ‘ ® ‘SHALL NOT GE WW CONCRETE SLABS WALLS, LJ VO) AINE MT LOCAL AMTHORETY FOR A 250 WATER CEAMECTON, A TODH FRE FIRE SERVICE > EXTERNAL HYDRANTS SHALL BE POSINONED NOT LESS THAN 10m FROM SANITARY PLUMBING & DRAINAGE THE QUILOING UNLESS PROTECTED BY A CONSTRUCTION HAVING A FIRE x 1) AL SAKTARY ORABAGE SHALL GE 100 DA, AT 1.65% FAL UD. POSISTANCE UEVEL OF NOT LESS THAN 90/90/90 EXTENDING AT LEAST MATERIALS: 2m EITHER SIOE OF THE HYDRANT OUTLET, AND WHICHEVER IS THE LESSER, . 3m FROM THE GROUND LEVEL ADJACENT TO THE HYDRANT OR THE HEICHT O HOUSE DRAINAGE PVC CLASS OW OF THE GUILDING. — SOM, WASTE AND VENT PIPE PVE CLASS OW 2) EXTERNAL FEED HYDRANTS SHALL BE POSMONED WITKIN 70m OF A ul OAD, WAROSTAND OR THE UKE TO NIICH THE FRE ALTHORSTY AP — STORMWATER & DOWNPIPES APPUANCE WAS ACCESS O 4) ALL STORMWATER DRANAGE SHALL BE 100 OWA AT 1% FAL UNO. 3), SHORMMTS, SHAL, BE RETALED $0 TAO NE Te 2) OOWNPPE SIZES STATED ARE MINUM REQURED CROSS-SECTIONAL FRG ANAS TOT FAC OF OT aba TU << MOS. 3S DEC, BELOW THE HORIZONTAL oO. MATERIALS: A) ALL HYDRANTS ANO FIRE HOSE REELS SHA BE WSTALLED TD PROMDE DOWNPIES pve cuss Ow AACN OF TOOmun CLEARANCE AROUND THE HANOWMEEL ® ALL DIRECTIONS STORMWATER ( UP 10 225 OA) PVT CLASS SW HEAVY UNO: 5) AL SDAA RCHORK SHALL BE SUPPORTED m1 ACCOROMACE WH ry (> THE 25 OA) CONCRETE (RR) CL 3 / FRC (ADCOL) CL 1 pie DAL, MORA PREWORK SHALL GE ROXTFIED ACCORDANCE WITH ‘fm OF A ROAD, HARDSTAND OR THE UKE TO WHICH THE FIRE AUTHORITY S 7) FIRE AUTHORITY BOOSTER CONNECTIONS SHALL BE POSITIONED WITHIN wee PUMP APPLANGE HAS ACCESS _ MATERIALS: («100 04) CLASS 16 POLY / TYPE @ COPPER IN GROUND 0d Se eeu TWPE B COPPER ABOVE, GROUND 5 + Py es mK (b/= 100 Ga) CLASS 18 BLUE BRUTE IN GROUND ail in Kb \ PRELIM AG/TYPE © COPPER RISER/S L_ 50.467 De 4 PROVIDE A 256 OCV NN I(t. FQR FUR SERVICE . . ARSE 1008 SOLE 2 & t | CHECK VALVE (TYCO) .. . . Fx He ON wal] q YS "AUTHORITY. _ “ot . 3 OEE Rumor "sed fo. Bate on ieee ae mgr i 2 x 00.¢% S A It someencr PS ree na ; Z T gg Sung ER gg gg gg Ot p— et 5 © — aN gee V p fo, # N + o-——t LE 00. Bo; erty Bound AC BUNDED GN WASH AREA NO . GEND Oa Peper a 1 . USE ATE MIN. SM ABOVE FOL | STORMWATER ORAINAGE — es § COULD WATER ee eS a + ee Tomson & wr 00 IEEE ero a | wan —-—- REV ee i enue Ky «ABBREVIATIONS FORE HOORANT MOOSE PATH OF TRAVEL, 0 weeseeseeeenseensreeeeeeeneeeneeee < ro ACCESS PANEL ' OSTING SEWER se ss msm . DUSTING STORMWATER: — —sw— — sw — ov DOUBLE CHECK VALE ~ EXISTING WATER = a na FOESHED FLOOR LEVEL 2 ‘STOP TAP —_—_—_4—__—_. ne FRE HOSE REEL , GATE VALVE a Fw FLOOR WASTE GULLY GATEVALYE PADLOCKED OPEN a “ Hose cock t ek VALVE ee vce HOUSE COROKETON BRANCH L METER i HOPE HGH OEMSTY POLYETHYLENE DOWNPPE = -——_ 4 kD FRE HYORAMT ao oe oe o——— re at ee ee sae tr COLD WATER mance wares sureur ncn ‘ eT eone | : SON EUCRON, UIPORAULICS CONSULTANTS i NS: INSULT pur iw ue oo i! PO BOX 1406 BUOERM, 9 4586 L-« . Telephone 3888 provost Sve 13 2 ors OVERFLOW RELEF GULLY QBSA Focsimila O7 5445 3824 eer to me ‘REDUCED LEVEL 7 1124616 Email — rondollOfirs COM.CU FLOOR WASTE GURL .- - nefrepak AHSCA Yom X Zim FRE HOSE REEL = = BA PROPERTY OCSSTOM imal GARY WILBRAHAM JASSOCIATED COWSULTANT oa SHOR DUA PILLAR HYDRANT y 2 SURFACE LE ORANG: LEVEL: MHD 0 cD CPS A $75 oc uND (WOES NOTED OTHEReGE SAE: + \ Behe = = ooo se STE Asm aegimn .90n Ai 12100 RAS guru ess pou Ta @ > . = 2 | ‘EQUA. TO FOX BPT 600 BEH PROUECT P| 8 PROPOSED VISITOR HOSTEL approval A BBP Bee 02 PACIFIC AVE P395-01 Bae ee a SUNSHINE BEACH Pe 5 . or
Page 22
= Sea
UPPER FLOOR SANITARY & STORMWATER
PROMDE TEMPERING VALVE
fecedsseqdeezeseet &
|
{ q
q
ey | ;
t ny ’
p Tu a “}r% & v
weed tH tea R=) by r
ty rive ctl =
BS | od ES ;
meres wie Ein) Se FES | ja es
To gxrenoow POTURES TO. A See Gs oS Zh Yel 3 v SPICE CONSULTING
wwe TEMP. OF So” CELE. ees | oe rez CONSTRUCTION HYDRAULICS CONSULTANTS)
Eeaou forsiee 1 20 BOX 1405 BUDERI O 4556
ferry | 7 et at R QBSA Facsimile 07 5445 3824
(et gsuftu @ a \@ 124616 Email — [email protected]
5 Qe GARY WILBRAHAM
ASSOCUTED CONSULTANT
UPPER FLOOR WATER SUPPLY
SEE Se Ea eT
L--*% vy
las *
\ 7
ES
PROPOSED VISITOR HOSTEL
102 PACIFIC AVE
SUNSHINE BEACH
Page 23
100
owe ow
1 ROOF 1 '
1
! 1
'
vse cnmea 10 amet \
I
's0
GONCRETE UPSTAND KEN 189 7!
8 '
8 B 8 a ' 1
1008 (wom) GRATE . . + 1 !
Madrasa \ 1
. 2 ke ia og mcfe fo | meee
Fas SHR oe Ewe SHR EWG pecsme 1 NS G w J Lt Fue
a a
3) mi As Py
PLAN =
ONS HOSE COCK FIXED TO POST
OR ADJACENT STRUCTURE
00
GROUND
a 8
ogee
3s
jo “al
®
i
}
\
tLe
4
:
_— N
4
\
oe oe *
ROOF + 4
' '
'
FIRE HOSE REEL
NTS '
t 0
NOTE ' se 6 Y
FIX SIGN TO STRUCTURAL MEMBER 8 ‘ '
WITH CORROSION RESISTANT ' J |
FASTENERS 75 —— Era a ' a fo!
! wc
UPPER. m EWG SHR % tu 1 J i
a) ss)
00
‘.
~~ E
2
SECTION A-A
BUNDED GULLY DETAIL
NTS
HOSE TAP FIXTURE SIGN
NTS
FOX ENVIRONMENTAL BPTEOO
(GROSS POLLITANT TRAP) IN GRASSED OR
TD OISCHARGE PIPE
MIN GRADE 1% LANDSCAPED AREA
ch ~
GROSS POLLUTANT TRAP DETAIL
YOOMM MIN. 15upo IN PAVED AREA
656 LANDING VALVE, CONCRETE
(QUEENSLAND ROUND
IN CONCRETEO AREA
THREAD WITH BRASS
WIRING INSTRUCTIONS ‘LAP AND CHAIN
10°S TO SURFACE
‘AS THE TAK RE-FLLS WITH RAINWATER THE t—
FLOAT SWITCH WILL SIGNAL AND THE SYSTEM
1008 ACCESS CaP AKD SHALL REVERT TO NORMAL (MAINS OFF &
COUPLING. ORILL 730 HOLE LS ES PuMP ON). |e
WN ACCESS CAP FOR ORFICE 4S DETALED
oun. £
\ 3 SELECTED COMPACTED fuusH CONCRETE ~
(gam | GRAVEL FLL 25 ABOVE “\
t 1
° vm
‘2250 OUTLET
ae ns ras . = a eA Cu COE. Reveal Spe rr
(ssat owe Fe
Float : tt SPICE CONSULTING -
RL 30.40 opel it CONSTRUCTION, piirORAULICS CONSULTANTS
: FLOAT SwTrcH WRAP UNDERGROUND. :,! Po BOX ! 4 Fn
008 ooner/” a FOOT VALE PIPE IN OENSO TAPE am Telephone OF ee rer |
“ee a & 1124616 Emoil — [email protected] AHSCA
GARY WILERAHAM L
tL 28 a an
La THANG = LEVEL: AKO
OETALS cs SRE L
RAINWATER TANK DETAIL AS 1-200
RAINWATER PUMP DETAIL Cone east sacar pee cet *
PROPOSED VISITOR HOSTEL approval L
DUAL PILLAR HYORANT DETAIL 102 PACIFIC AVE ie A
WOT TO SCALE SUNSHINE BEACH = i”
. - ee
Page 24
Proposed Backpacker Hostel 102 Pacific Ave Sunshine Beach Landscape plan and Plant schedule. PLANT SCHEDULE Code Botanical Name Size Number Acm Smi Acmena Smithi 25itr 7 Arc Ale Archontophoenix Alexander 45itr 3 (12existing adv) Ban Int Banksia Integrifolia 45itr 3 Cub Roy Cuban Royal Palm Adv 2 Existing Chr Lut Chrysalidocarpus Jutescens Adv 11 Existing Car Acu Carpentaria acuminata Adv 5 Existing Dia Bre Dianetla Brevipundunculata 140mm 52 Dor Exe Doryanthis Excelsa 200mm 8 Hib Sca Hibertia Scandens 140mm 18 Iso Nod Isolepsis Nodiflora 140mm 56 Lom Lon Lomandra Longifolia 140mm 24 Syz Aus Syzyzgium Aussie Southern 45 ltr 7 Syz Aus Syzyzgium Aussie Southem = Adv 7 Wes Fru Westringea Fruitacosa 300mm 5 Xan Chr Xanthostemum Chrysanthis 25 Itr 10 Notes : e Gardens to be covered with 100mm layer of 1”Hoop Pine mulch Computer controlled drip irrigation to be installed Sir Walter Buffalo to be supplied All plants fertilised at planting Pruning and fertilising of existing plants and palms to be done at completion of building works. Landscape Design by: 4 Wildflower Street, Sunshine [email protected] p: 54480123 m:0417700942 Mesa acenens, garden consultation & design, irrigation commercial & residential landscape construction Mixstone pty itd ABN 927 697 695 10 QBSA licence no: 715497
Page 25
%
8 a3
PROPERTY DESC. LOT 163 RP 897370
SITE ADDRESS 102 PACIFIC AVE.
SITE SUBURB SUNSHINE BEACH
PROPERTY NO: 8568000000000
SITE AREA 1014 m2
WIND. DESIGN W42 N3
cosmcone HG)
OERKIN CONCERT
Gany Wilbraham Oesigns
eT .
BUDGET
ACCOMMODATION
102 Pacific Avenue
Sunshine Beach
TAMOBROJO
PTY. LTD.
“TRARIOSC.APE
a tame
Ron
Bx FSie
SUNDECK
Global Testing Pty Ltd
Rienmac Pty Ltd
Spice Consulting Pty Lid
UTOARAELE HALOS CON DT
Mim Leece
. Mixstone pty Itd
4:100'-- ABN 927 697 695 10
Og = ~~. QBSA licence no: 715497 ..},, SSu/wener
BY dg og tb . > 2 7a ’ Seainee
ok a ae o + A 34 a “ garden consultation & design, irrigation fosows
Ly a 2 8 Af . % G&G #£ commercial & residential landscapes &oacerceecton
4 a 43 OF | 22S oe | Seuaeesmn
= &taA | : . THE SUALOGNG OWNER.
sof Fy Ba 2A eg .
. ‘ sa iy x SD x 4 Wildflower Street, Sunshine Beach.
a wo 24 2 [email protected]: 54480123 m: 0417700942
Page 26
vo 1. Property descriptia g This section need only be completed if details of street address and property description are applicable. EG. In the case of (standard/generic) ‘ol design/shell manufacture and/or & and carport systems this section jay not be applicable The description must identify all land the subject of the apptication, The lot & plan details (eg. SP / RP) are shown on title documents or a rates notice, If the plan is not registered by title, provide previous tot and plan details, 2. Description of component/s certified Clearly describe the extent of work covered by this certificate. rely] Act 1975 s10 & s50 Building hie delete rr ae 2 arn > OECEIVE 74 FET 7108 liance Certificate states building work complies with the | building assessment provisions. x ing Certifier: To bé Used for all classes of building and structures to Ht rama uli ng Gent method of buildin or building element complies with the BCA or a provision of the QDC. / STRICTION: A building certifier (class B} can only give a compliance certificate about whether ing work complies with the BCA or a provision of the QDC. A building certifier (Class B) can ‘ong give a certificate regarding QDC boundary clearance and site cover provisions. Street address (include no., street, suburb / locality & postcode) 102 Pacific Avenue Sunshine Beach QLD Lot & plan details (attach list if necessary) [ Lot 163 on RP 897370 In which local government area is the land situated? Postcode 4567 | Sunshine Coast Regional Council Emergency and exit lighting system. Fire detection and alarm system. @:... of certification Detail the basis for giving the certificate and the extent to which tests, specifications, rules, Standards, codes of practice and other publications, were relied upon. BCA 2008 Parts E2 and E4 AS2293.1:2005 ‘Emergency evacuation lighting’. AS1670.1:2004 ‘Fire alarm systems’. LOCAL GOVERNMENT USE ONLY Date rocaived Approved form 15 Version 1, 08/06 Roference Numberis
Page 27
way é Form 15 continued 4. Reference documentation ; Clearly identity any relevant documentation, Electrical layout drawings 09-801 F PS $3 and S4. @.g. numbered structurat engineering plans. 5. Building certifier reference number Building certifier reference number | 6. Competent person details Name (in full) A competent person for building work, means a person who is assessed by the building certifier | Robert Pau! Graham for the work as competent to practise in an i i ct of the building and specication design, Company name (if applicable) Contact person © building work because of the individual's | RPG Consulting Engineers Pty Ltd | Robert Graham , experi d qualifications in th - = aspect The competent erson mus ais be Phone no. business hours Mobile no. Fax no. registered or ficensed under a law applying in raised or eensed unde [ 07 5455 4488 ]_ [0411 036 029 | [ 07 5456 3355 mail addres: Ifno relevant law requires the individual to be Ema 4 s , licensed or registered to be able to give the [email protected] | help, the certifier must assess the individual as having appropriate experience, qualifications or Postal address skills to be able to give the help. PO Box 2112 tf the chief executive issues any guidelines for NoosaHeads QLDSO™~=<“Cs~Sst‘“S~™S ee ostoode 4567 ween 7 assessing a competent person, the building certifier must use the guidelines when Licence or registration number (if applicable) assessing the person, RPEQ No. 6673 7, Signature of competent person \ certify that the item/s described above, if installed or carried out under the certificate, including any This certificate must be signed by the individual! referenced documentation, will comply with the Building Act 1975. assessed by the building certifier as competent. Signature Date / Ouahe— 19 October 2009 e x
Page 28
STRUCTURAL, 1
Ree Vm eS Ret alle) iE baal
Compliance Certificate for building DesigADne
Eyles
24 CCT 2303 9
By Noosa Building Certifiersorm 15.doc
Specification
bh”
1. Property Sone address {include no., street, suburb /Iocality & postcode}
This section need onthe chmpléted 5
details of street address an 102 Pacific Avenue,
description are applicable.
In the case of (standard/generic)
design/sheil manufacture and/or
patio and carport systems this section
may not be applicable.
The description must identify all land the
subject of the application.
The lot & plan details (eg. SP / RP) are
shown on title documents or a rates notice.
If the plan is not registered by title, provide
previous lot and plan details.
2. Description of componentis certified]
Clearly describe the extent of work covered. by
this certificate,
mpliance Certificate states building work complies with the building assessment provisions.
ed for all classes of building and structures to certify a material, system, method of
19 bui ling or building element complies with the BCA or a provision of the QDC.
aah FRICTION: A building certifier (class B) can only give a compliance certificate about whether
unt al work complies with the BCA or a provision of the QDC. A building certifier (Class B) can
ot give a certificate regarding QDC boundary clearance and site cover provisions.
Sunshine Beach Qld Postcode 4567
Lot & plan details (attach list if necessary)
L |
In which local government area is the land situated?
Sunshine Coast Regional Council
Proposed — Residence
@:.. of certification
Detail the basis for giving the certificate and the
extent to which tests, specifications, rules,
standards, codes of practice and other
publications, were relied upon.
Design Wind Speed = Wind Classification N3 - AS4055
Durability - Normal Protected
Footings - Report No. 09/0517 by Global Testing.
Floor Live Loads - General Areas: 1.5kPa; Balconies & Stairs: 2.0kPa
AS3600, AS3700, AS/NZS1170.0, AS/NZS1170.1, AS/NZS1170.2, AS/NZS1170.3,
ASI/NZS1170.4, AS4100, AS2870, AS1720, AS1684, AS4055
LOCAL GOVERNMENT USE ONLY
Date received
JApgtoved form 45 Version
Reference Numberis 1, 0904
Page 29
ro Maa Se 4. Reference documentation Clearty identify any relevant documentation, e.g. numbered structural engineering plans. Architectural Drawings — Project #07-011 by Garry Wilbraham Designs. Rienmac Structural Drawings - 29065-S1 to S4, Revision A. 5. Building certifier reference number Building certifier reference number 6. Competent person details A competent person for building work, means a person who is assessed by the building certifier for the work as competent to practise in an - aspect of the building and specification design, of the building work because of the individual's skill, experience and qualifications in the aspect The competent person must also be registered or licensed under a law apptying in the State to practice the aspect. relevant law requires the individual to be tcensed or registered to be able to give the help, the certifier must assess the individual as having appropriate experience, qualifications or skills to be able to give the help. If the chief executive issues any guidelines for assessing a competent persan, the building certifier must use the guidelines when assessing the person. Name (in full) | Peter Rienecker Company name (if applicable) | Rienmac Pty Ltd Phone no. business hours | 07 5478 2500 Email address Mobile no. | | 0404 885 493 Contact person | | Peter Rienecker Fax no. | | 07 5444 1158 | [email protected] Postal address PO Box 149 Mooloolaba Qld Postcode 4557 Licence or registration number (if applicable) | RPEQ-2088 7. Signature of competent person This certificate must ba signed by the individual assessed by the building certifter as competent. | certify that the item/s described above, if installed or carried out under the certificate, including any referenced documentation, will comply with the Building Act 1975. Signature Date P Raed __ 17 September, 2009 LOCAL GOVERNMENT USE ONLY Filename: C:\Rienmacletters\2009\29065 Form 15.doc Date received Reference Numberls Approved form 15 Version 4. oat
Page 30
4. Information to be provided — for Construction or Demolition Works 4.1 The waste management plan for the demolition stage of a development is to contain the following information: Material On-site Destination* Re-use & Recyclin Disposal Type of Material Estimated On-site Off-site Specify Volume specify specify contractor and proposed reuse contractor and landfill site or on-site recycling recycling outlet methods Excavation Create required material levels Garden Organics Bricks 60m3 . Ail Coast , . ‘ demolition ~ Noosa Waste Station recycling Concrete 80m3 All Coast : Demolitions -— Noosa Waste Station recycling _ Timber — please Roof trusses, Salvage Centre Specify flooring, framing 44 Price Street, 6m3. Nambour Plasterboard “8m3 . All Coast : Demolitions - Noosa Waste Station recycling Asbestos - 10m3 . All Coast Roofing Asbestos Removals — Noosa landfill Other — please Windows (10) Salvage centre Specify 44 Price Street, Nambour fir een ’ j
Page 31
Tabte 14-40 — All Demclition, removal or relocation $1.1 Buildings are relocated to another site and adapted to meet the needs of users. OR $1.2 At least 10% of building materials are reused or recycled (measured in cubic metres) All block and concrete material will be re-used at the Noosa waste Station. All timber and windows are to be recycled through the contractors yard. and $2.1 A Waste Management Plan (see page 2) prepared in accordance with Schedule 9 Demolition & Construction Waste Management specifies— ~ a) Estimated volumes of waste to be generated; b) Estimated volumes of recyclables; ¢) Initiatives to minimize waste-by-waste reduction, reuse or recycling; d) Plans showing the location and details of the waste storage areas; and e) A description of the type of containers proposed to store the waste. The contractor’s method is for no storage on site with material being transported directly from site to destination. No site plans are provided as there is no collection on site. Ail absestos removal is as per government and legal requirements. and $3.1 Infrastructure including, reticulated water, sewerage, storm water, and electricity are protected from damage and made safe to the standard required by the regulatory authority; , Provision for all services has been dealt with. Water will be connected to one site tap only for the period of construction. Sewerage will be capped at the designated point for reconnection during construction phase. Electricity will be connected to a new power pole to the side of the site. Storm water protection is controlled by the site silt management plan attached to the Hydraulic drawings in the BA. All connections meet regulatory standards. and $3.2 Infrastructure is disconnected, capped or sealed including— a) Electricity meters are removed and electrical wires disconnected; and b) Telephone lines are disconnected; and c) High speed data cables and television provider boxes are disconnected and removed; Electrical contractor will transfer electrical connection and meters to new pole for demolition and construction phase. All telephone cabling and TV boxes will be removed prior to commencement. and $3.3 A temporary crossing is provided to protect road reserve infrastructure including kerb and channel. : , The existing concrete crossover will be used during the demolition and construction phase as this is a wide access point which provides a continual concrete drive through to the demolition and construction area, eliminating extra dirt and site debris from entering the road. New site access points and reinstatement of the kerb is to be completed as part of the DA at the last part of construction. and
Page 32
$3.4 Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the new site or between the sites is repaired or reinstated to at least pre-existing conditions. As per the DA, all areas will be either new or reinstated as per the approved plans. $4.17 Waste materials are removed from the site; All demolition materials will be removed from site as per the contractors approved trucks in accordance with all guidelines. and $5.1 Erosion and sediment control measures are installed and maintained until soils are stabilized by vegetation or sealed. As detailed in the BA plans, Hydraulic drawings show the Erosion and site sediment plan. and S6.1 If a development permit has not been issued for the future use of the site— a) Hard surfaced areas including concrete slabs are removed or covered with a minimum of 300mm of soil; and b) Disturbed areas are revegetated using. species identified in PSP3 — Landscaping Plants and Guidelines, : Submitted “Waste that cannot be collected by Council's normal collection service is collected by an approved Regulated Waste Transporter. 4.2 An area is to be allocated on the development site for the segregation of construction and demolition materials. Details of the site area to be used for on-site separation, treatment and storage (including weather protection) are to be provided on the plan drawings accompanying the application. During the demolition phase the contractor requires no on site holding or separation areas.
Page 33
9
e
JTS
A:
cit
: 7
oo JRECEIVE]D)
21 CCT 2303
GLOBAL TESTING ===
THE ONLY NAME IN SOILS
-
iA
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville.
JOB NUMBER 09/0517 SITE CLASSIFICATION REPORT
CLIENT W. REDWOOD.
SITE:LOCATION | PROPOSED RESIDENCE,
102 PACIFIC AVENUE, SUNSHINE BEACH.
REPORT DATE _| 27/08/09
INTRODUCTION
The purpose of this report is to classify the subject allotment in accordance with Australian Standard
2870 - 1996 ‘Residential Slabs and Footings’. From this classification a footing system can be
recommended for the structure so as to allow adequate performance of the footings under the soil
conditions determined at the site.
This report relates exclusively to the proposed residence at 102 Pacific Ave, Sunshine Beach. This
document has been prepared for the express purpose stated above. This document does not cover any
other elements related to construction on the site.
SITE DESCRIPTION
The subject site is a residential allotment, which fronts a sealed road. The site has an existing
residence that is to be demolished.
The site is grassed with scattered undergrowth, and has scattered medium to large sized mature trees
present.
The site falls at a slope of approximately 3-4% towards the road.
Surface water will drain towards the road. Surface water from adjoining allotments will not traverse
this site.
The allotment is surrounded by existing residences.
The site has no dams or watercourses.
The site is not a known flood area.
SOIL PROFILE
The borelogs carried out at the site, refer attached Site Plan for localities, indicate that the soil profile
typically consists of a moist, grey, fine to medium grained SAND.
Dynamic Cone Penetrometer testing indicated that the SAND was typically loose to a depth of
1700mm, where the underlying SAND becoming medium-dense.
Rock was not encountered during the site investigation.
Groundwater was not encountered during the site investigation.
Whilst every effort has been made to ensure that the borelogs carried out at the subject
allotment are indicative of the soil profile over the site any discrepancy between the profile
detailed in the borelogs and that observed during construction shall be referred to Global
Testing for immediate attention.
09/0517 Page |
Page 34
4. MATERIALS LABORATORY TEST RESULTS Soil Laboratory testing was not carried out on samples of the soil taken from the site because the clay content of the material was too low for Shrink-Swell movements to be critical in the classification of the soil profile. Determination of the classification for the site in this situation is based upon results from Dynamic Cone Penetrometer testing performed over the site. BOREHOLE n/a DEPTH RANGE OF SAMPLE n/a LIQUID LIMIT n/a PLASTIC LIMIT n/a PLASTIC INDEX na LINEAR SHRINKAGE na INSTABILITY INDEX na SHRINK SWELL INDEX, Iss Wa PREDICTED SURFACE MOVEMENT n/a Please note that the Plasticity Index (PI) determined by the Atterberg Test may be correlated to an Instability Index (Ips)with reference to the results of extensive testing carried out by others, notably, Dr P Mitchell, ‘Footings for Small Scale Domestic Structures, "March 1990. 5 SITE CLASSIFICATION AND TARGET STRATA Based on the findings of the site investigation, the classification of the site is considered to conform to:- CLASS “ P ” (Due to poor bearing capacity) in accordance with Australian Standard 2870 - 1996, ‘Residential Stabs and Footings, Construction’, The target stratum for the foundation of the structure is the SAND, at a depth of 1700mm below existing ground surface. [f any fill is placed over the existing ground, the structure shall be piered through the fill into the existing material. Further note that the placement of reactive material as fill, or cutting of the site area may change the site’s classification. Yours Faithfully, LG MICHAEL PINKNEY (Laboratory Manager) i 09/0517 Page 2
Page 35
LIMITATIONS Recommendations given in this report are based on the information supplied by the client regarding the proposed building construction in conjunction with the findings of the investigation. Any change in construction type, building location or omission in the client supplied information, may require additional testing and/or make the recommendations invalid. The recommendations herein identify a target soil stratum into which the footings are to be founded. The target stratum has been located by the depth in mm of the target stratum’s upper horizon boundary below the existing ground surface level at the time of the site investigation. Any cutting or filling works and any surface erosion or deposits subsequent to the site investigation, will alter the measured location of the stratum relative to the surface. Where required, the author should be notified in such cases to confirm the location of the target stratum. The description of the soil given in the Soil Profile section of this report is intended as a brief overview of the soil’s primary constituents. For a detailed classification of the soil, the reader should refer to the Soil Profile Reports and/or Borehole Reports attached to this report. Every reasonable effort has been made to locate the test sites so that the borehole profiles are representative of the soil conditions within the area investigated. The client should be made aware however, that exploration is limited by time available and economic restraints. In some cases soil conditions can change dramatically over short distances, therefore, even careful exploration programs may not locate all the variations. If soil conditions different from those shown in this report are encountered or are inferred from other sources, then the author must be notified immediately. This report may not be reproduced except in full. The information and drawings provided with this report shall only be used and will only be applicable for the development shown on the client supplied information provided for this site. Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan shall not be used for any building construction or costing calculations. The purpose of the plan is to show approximate location of field tests only. Any changes made to these recommendations by persons unauthorized by the author will legally be interpreted as that person assuming the responsibility for the long-term performance of the footing system. The recommendations contained in this report have not taken into consideration the long term effects of any previous, current or potential subsurface work by mining companies or potential stope instability problems. At the time of writing this report neither our client (nor his agent) nor the local authority had made the author aware that these problems may be affecting this allotment. If a mining subsidence or slope stability assessment is required for this allotment, the recommendations of a suitably qualified geotechnical engineer should be sought. 09/0517 Page 3
Page 36
GLOBAL TESTING THE ONLY NAME IN SOILS SOIL PROFILE REPORT CLIENT: PROJECT: W. Redwood. BY: 102 Pacific Ave, Sunshine Beach. JOB NO: AUTHORIZED DATE TESTED: 26/08/09 09/0517 G. Wilbraham. Drilling Method: Hand Auger 100mm. Borehole No: 1 Depth (mm) Description PENET. (blows per 100mm) 1 2 3 4 Approx. Bearing Capacity (kPa) 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 2500 SAND (SP)-Fine to medium grained, grey, moist, loose. SAND (SP)-Fine to medium grained, grey, moist, medium-dense. Hole Terminated. 30 20 30 30 30 100 09/0517 Page 4
Page 37
GLOBAL TESTING THE ONLY NAME IN SOILS SOIL PROFILE REPORT CLIENT: W. Redwood. AUTHORIZED G. Wilbraham. BY: PROJECT: — 102 Pacific Ave, DATE TESTED: = 26/08/09 Sunshine Beach. JOB NO: 09/0517 a Drilling Method: Hand Auger 100mm. Borehole o No: 2 i Pape PENET. to . Depth Description (blows per 100mm) Approx. J. (mm) : Bearing Capacity (kPa) 1 2 3) 4 0 SAND (SP)-Fine to medium grained, grey, moist, loose. . 100 1 30 200 1 300 ‘yod 400 0.5 20 500 0.5 600 2 700 1 800 1 900 I 1000 1 1100 l 30 I | I 2 1 30 mo 1200 "o 1300 ‘ 1400 1500 fiat o 1600 , 1700 SAND (SP)-Fine to medium grained, : 125 * grey, moist, medium-dense. my 1800 4 ‘ 1900 4 2000 Hole Terminated. 4 2100 at 2200 e 2300 2400 2500 30 09/0517 Page 5
Page 38
ma s% GLOBAL TESTING — THE ONLY NAME IN SOILS 102 Pacific Ave, Sunshine Beach 09/0517 Page 6
Page 39
GLOBAL TESTING
THE ONLY NAME IN SOILS
Test Locality Plan
LEGEND
~~ ~& BH - Borehole Location
N “@ PN - Dynamic Cone Penetrometer Location
-$ PT - Percolation Test
k . . . . °
{* Slope | Existing Residence > Slope
(To be demolished)
CARPORT
> 3m BHD wa
— |
e BHI SPN? Y
PNI a
10m
: 8m
H
Pacifile Avenue
Not to Scale
Note: Any dimensions, contours, slope directions and magnitudes shown on the plan shall not be used for any building
construction or costing calculations. The purpose of the plan is to show the approximate location of the field tests only. All
dimensions in metres UNO .
W. Redwood Job No.09/0517
102 Pacific Ave, Date Tested :26/08/09
Sunshine Beach :
Authorised:-G. Wilbraham
Page 40
4 Lillypilly Court KAWANA FOREST 4551 Phone: (07) 5493 2981 Fax: (07) 5493 3867 Mobile: 0408 713 227 JQECEIVE}D) 8" October, 2009. 21 CCT 2009 By Noosa Building Certifiers Our Ref: 2009/ 0919 Garry J. Wilbraham P. O. Box 6009 MAROOCHYDORE....DC QLD 4558 @: Garry RE: ASSESSMENT REPORT FOR PROPOSED CLASS 3 UNITS SITUATED AT LOT 163 RP: 897370 PACIFIC AVENUE, SUNSHINE BEACH I refer to the above and advise that the Energy Efficiency Assessment Report has been completed in line with the Building Code of Australia — Volume One — 2009 — J1.1 to J1.6, J2.1 to J2.5, J3.1 to J3.6, J4.1 to J4.4, J5.1 to J5.5, J6.1 to 16.3, J7.1 to J7.2, J8.1 to J8.2 and Part 12 — Energy Efficiency. The Assessment Report, a Summary of the Report and a Final Checklist are attached to this letter. Note: Energy Efficiency requirements to be followed are outlined in the attached Assessment Summary and Final Checklist, compiled from the supplied information and BCA requirements. Should you have any questions regarding this report, please do not hesitate to contact me. @vours faithfully DE “Marianne (Mim) Leece Accreditation No. BA 71 4 Lillypilly Court, Page No. | Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 41
% “ ory Property Description: - Lot: 63 FINAL CHECKLIST CLASS 3 RP: 897370 4 Lillypilly Court, KAWANA FOREST 4551 Phone: (07) 5493 2981 Fax: — (07) 5493 3867 Mobile: 0408 713 227 2 By Noosa Building Certifiers DECEIVE |) 4 GCT 2009 Builder: Garry J. Wilbraham Site Address: No. 102 Street: Pacific Avenue Town: Sunshine Beach Postcode: 4567 Type of dwelling ee" floor Floor External covering Internal walls Ceiling Type Type Colour Insulation Type Type Insulation 4 Lillypilly Court, Kawana Forest Single Storey Lowset O QO Enclosed Ground Floor Timber Other First Floor Timber Other AAC(Hebel) Timber/FC Clad Other Light No Oo Oo Brick veneer oO oO O D 0 Medium O Yes O Plasterboard Oo Cavity brick Oo Single skin brick O Concrete block — not lined internally Concrete block — lined internally with battens & plasterboard Plasterboard yw Concrete oO No O Yes 4 Double Storey wi Highset oO Not enclosed, Slab on ground Mw Suspended Slab Cavity brick Oo Concrete block Oo Single skin brick Oo oO Dark O Type ......0.... R. Value Lined 2 sides, O AAC (Hebel) oO Timber lined QO Type See attached Report Phone: Fax: (07) 5493 2981 (07) 5493 3867 1
Page 42
mes ASSESSMENT NO: 2009/0919 Windows Type Single glazed Tinted o Double glazed oO Reflective Oo Other CD hak eececsecececeeeceeeeeuee enone Total U-value of Glass to be installed 7.9 (obtained from manufacturer) Solar Heat Gain Coefficient of glass to be installed 0.81 (obtained from manufacturer) Frame Timber or PVC Oo Aluminium 4 Other Doe eeceteeeeeeseeeeeceeeeenenes Ext.Shading —_ Louvres oO Awning @eorr Type Metal Concrete Tiles oO Colour Light Medium QO Dark Oo Ventilated No Yes O Type o......cccceceeeeeeee es Insulation No O Yes Type Anticon R. Value 2.5 Skylights No M Yes O Type Single glazed clear 0 Single glazed opal O Double glazed clear O Double glazed opal O Ventilated No O Yes O Air Conditioning No O Yes 4 @ Room only w Central i] Power of motor .......... kW To the best of my knowledge the above information is true and correct, in line with the plan (Job No. 07- 011 — sheets 5 to 7, 21, 22 and 34 dated 24/09/09) and the original checklist provided. 8" October, 2009. Marianne (Mim) Leece Accreditation No. BA 71 4 Lillypilly Court, Kawana Forest Phone: (07) 5493 2981 2 Fax: (07) 5493 3867
Page 43
4 Lillypilly Court, KAWANA FOREST 4551 \ MME a PSE: pavavanonanvarays , Phone: (07) 5493 2981 ener pane GY SSeS YAMIES Sas Bly ASSESSMENT REPORT 21 Get 2305 SUMMARY By Noosa Building Certifiers Building Code of Australia 2009 Volume One 3h October, 2009. CLIMATE ZONE - 2 ASSESSMENT NO: 2009/ 0919 SITUATED AT: LOT 163 PACIFIC AVENUE, SUNSHINE BEACH. Jl Building fabric Jl. Application of Part The Deemed-to-satisfy Provisions of this Part apply to building elements forming the envelope of a Class 2 to 9 building other than- (a) a Class 7, 8 or 9b building that does not have a conditioned space; or (b) an atrium or solarium that is not a conditioned space and is separated from the remainder of the building by an envelope. J1.2 Thermal construction general Insulation must be installed as indicated in the attached report. J1.3 Roofs As indicated on the supplied Checklist, Anticon with an R-value of 2.5 is to be installed under the roof of the buildings, which will give a Total R-value in excess of the minimum e 2.2 required - complies. Ji.4 Roof Lights Not applicable. ILS Walls As indicated on the supplied Checklist, the external walls of the buildings are to be constructed of rendered 190mm core filled blockwork, that will have a total R-value of approximately 0.25. As per (a) above, the minimum Total R-value required for an external wall is 1.4, therefore the minimum added R-value required for the rendered 190mm core filled blockwork walls is 1.15. This can be achieved by installing wall battens or furring channels, plasterboard and insulation with an R-value of 1.15 or greater. As per (b) above, the external walls that do not require the added insulation are the external walls that have an overhang of 750mm or greater, i.e. the external walls shaded by the patios. 4 Lillypilly Court, Page No. | Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 44
a ASSESSMENT NO: 2009/0919 IJ3.6 Construction of roofs, walls and floors As an air conditioner is to be installed roofs, external walls, external floors and any opening such as a window, door or the like must be constructed to minimise air leakage as indicated in the attached Report. J3.7 Evaporative Coolers Not applicable. J4.1toJ4.4 Air movement Not applicable to Class 3, 5, 6, 7, 8 and 9 buildings. 35.0 Air-conditioning and Ventilating Systems 35.1 Application of Part — not indicated in BCA J5.2 Air-conditioning and ventilating systems O Air -conditioning must be installed as indicated in the attached report, and clarification may need to be certified by a Competent Person accepted by the Certifier. 35.3 Time Switch Power supply to- (a) an air-conditioning system of more than 10k Wr; or (b) a ventilation system with an air flow rate of more than 1000L/s; or (c) heating systems of more than 10kw (heating) must be controlled by a time switch in accordance with Specification J6. J5.4 Heating and Chilling Systems Not applicable. J5.5 Miscellaneous exhaust systems (a) A miscellaneous exhaust system with an air flow rate of more than 1000 L/s, that is associated with equipment having a variable demand such as a stove in a commercial kitchen hood or a chemical bath in a factory, must- Oo (i) have the means for the operator to- (A) _ reduce the energy used, such as by a variable speed fan, and (B) stop the motor when the system is not needed; and (ii) be designed to minimise the exhausting of conditioned air. (b) The requirements of (a) do not apply- (i) within a sole-occupancy unit of a Class 2 or 3 building, Class 4 part of a building or Class 9c aged care building; or (li) ~~ where additional exhaust ventilation is needed to balance the required outside air for ventilation; or (iii) where air flow must be maintained for safe operation. 4 Lillypilly Court, Page No.3 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 45
~- J6 36.1 J6.2 J6.3 J6.4 36.5 56.6 37.2 O38 ASSESSMENT NO: 2009/ 0919 Artificial Lighting and Power Application of Part The Deemed-to-satisfy Provisions of this Part do not apply within a sole-occupancy unit of a Class 2 building or a Class 4 part of a building. Interior artificial lighting Interior artificial lighting must be installed as indicated in the attached report, and clarification may need to be certified by a Competent Person accepted by the Certifier. Interior artificial lighting and power control Interior artificial lighting and power control must be installed as indicated in the attached report, and clarification may need to be certified by a Competent Person accepted by the Certifier. Interior decorative and display lighting Interior decorative and display lighting must be installed as indicated in the attached report. Artificial Lighting Around the Perimeter of a Building Artificial lighting around the perimeter of a building must be installed as indicated in the attached report, and clarification may need to be certified by a Competent Person accepted by the Certifier. Boiling water and chilled water storage units A boiling water or chilled water storage unit is not indicated, however if installed will need to comply with the attached Report. Hot water supply A hot water supply system for food preparation and sanitary purposes, other than a solar hot water system in climate zones 1, 2 and 3, must be designed and installed in accordance with Section 8 of AS/NZS 3500.4. Access of Maintenance J8.1 Application of Part The Deemed-to-satisfy Provisions of this Part do not apply within a sole-occupancy unit of a Class 2 building or a Class 4 part of a building. 38.2 Access must be provided to all plant, equipment and components that require maintenance in accordance with Part 12 below:- Components of services must be maintained to ensure that they perform to a standard not less than they were originally required to achieve, including- (a) adjustable or motorised shading devices; and (b) time switches and motion detectors; and (c) room temperature thermostats; and (d) plant thermostats such as on boilers or refrigeration units; and (e) outside air dampers; and (f) reflectors, lenses and diffusers of light fittings; and ‘ (g) heat transfer equinment. 4 Lillypilly Court, Page No. 4 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 46
de ASSESSMENT NO: 2009/0919 To the best of my knowledge the above information is true and correct, in line with the plan (Job No. 07- 011 —sheets 5 to 7, 21, 22 and 34 dated 24/09/09) and the original checklist provided. Report by - Checked and certified by - CL ithe eceeneet Marianne (Mim) Leece Building Certifier 4 Lillypilly Court, Page No. 5 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867 ii
Page 47
4 Lillypilly Court, ; JMOL . L, LE KAWANA FOREST 4551 Eergy Giiioney ssesomentSemigg Bo" wh souse Mobile: 0408 713 227 ( RIVE, ASSESSMENT REPORT JQUERY }D) 21 021 230) Building Code of Australia 2009 By Noosa Building Certifiers Volume One Class 3 Energy Efficiency CLIMATE ZONE - 2 ASSESSMENT NO: 2009/ 0919 @ROPOSED CONSTRUCTION: CLASS 3 SITUATED AT: PACIFIC AVENUE, SUNSHINE BEACH LOT: 163 RP: 897370 FOR: TAMOBROJO PTY LTD BUILDER: GARRY J. WILBRAHAM DATE: 8" October, 2009. 4 Lillypilly Court, Page No. | Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 48
ASSESSMENT NO:2009/ 0919 CLASS 2 TO 9 BUILDINGS Deemed-to-satisfy Provisions Where a Building Solution is proposed to comply with the Deemed-to-Satisfy Provisions, Performance Requirement JP1 is satisfied by complying with- Ji for the building fabric, and J2 for external glazing, and J3 for building sealing, and J4 for air movement, and 0 J5 air-conditioning and ventilating systems, and J6 artificial lighting and power, and J7 hot water supply, and J8 access for maintenance. Definitions J1 to J8 The following definitions are used in these Parts: Common wall means a wall that is common to adjoining buildings. Conditioned space means a space within a building where the environment is likely, by the intended use of the space, to be controlled by air-conditioning, but does not include- (a) anon-habitable room in which a heater with a capacity of not more than 1.2kW provides the air-conditioning, or (b) a space in a Class 7, 8 or 9b building where the input power to an air conditioning system is not more that 15 W/m? Envelope for the purpose of Section J, means the parts of a building’s fabric that separate a conditioned space or habitable room from- (a) the exterior of the building: or (b) a non-conditioned space including- (a) the floor of a rooftop plant room, lift machine room or the like; and (ii) the floor above a carpark or warehouse; and (ii) — the common wall with a carpark, warehouse or the like. External wall means an outer wall of a building which is not a common wall. Fabric means the basic building structural elements and components of a building including the roof, ceiling, walls and floors. 4 Lillypilly Court, Page No. 2 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 49
ASSESSMENT NO: 2009/ 0919 Glazing, for the purposes of Section J, means a transparent or translucent element and its supporting frame located in the external fabric of the building, and includes a window other than a roof light. Internal wall excludes a common wall or a party wall. Lamp power density means the total of the maximum power rating of the lamps in a space, other than those that are plugged into general purpose socket outlets, divided by the floor area of the space. Light source efficacy means the luminous flux of a lamp or the total radiant flux in the visible spectrum weighted by the spectral response of the eye, divided by the electric power that will be consumed by the lamp but excluded ballast and control gear power losses. Piping, for the purposes of Section J, means an assembly of pipes, with or without valves or other fittings, connected together for the conveyance of liquids. Reflective insulation means a building membrane with a reflective surface such as a reflective foil laminate, reflective barrier, foil batt or the like capable of reducing radiant heat flow. Roof light, for the purpose of Section J, means a skylight, window or the like installed in a roof — (a) to permit natural light to enter the room below; and (b) at an angle between 0 and 70 degrees measured from the horizontal plane. R-value means the thermal resistance (m?.K/W) of a component calculated by dividing its thickness by its thermal conductivity. Service, for the purpose of Part 12 and Section J, means a mechanical or electrical system that uses energy to provide air-conditioning, mechanical ventilation, hot water supply, artificial lighting, vertical transport and the like within a building, but which does not include- (a) systems used solely for emergency purposes; and (b) cooking facilities; and (c) portable appliances; and Sole~occupancy unit means a room or other part of a building for occupation by one or joint owner, lessee, tenant, or other occupier to the exclusion of any other owner, lessee, tenant or other occupier and includes- (a) a dwelling; or (b) a room or suite of rooms in a Class 3 building which includes sleeping facilities; or (c) a room or suite of associated rooms in a Class 5, 6, 7, 8 or 9 building; or (d) a room or suite of associated rooms in a Class 9c aged care building, which includes sleeping facilities and any area for the exclusive use of a resident. Total R-Value means the sum of the R-values of the individual component layers in a composite element including the air space and associated surface resistances. Ventilation opening, for the purpose of Section J, means an opening in the external wall, floor or roof of a building designed to allow air movement into or out of the building by natural means including a permanent opening, an openable part of a window, a door or other device which can be held open. 4 Lillypilly Court, Page No.3 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 50
ASSESSMENT NO:2009/ 0919 J1.0 Building Fabric Sl Application of Part The Deemed-to-satisfy Provisions of this Part apply to building elements forming the envelope of a Class 2 to 9 building other than- (a) a Class 7, 8 or 9b building that does not have a conditioned space; or (b) an atrium or solarium that is not a conditioned space and is separated from the remainder of the building by an envelope. J1.2 Thermal construction general (a) Where required, insulation must comply with AS/NZS 4859.1 and be installed so that it- (i) abuts or overlaps adjoining insulation; and e : (ii) forms a continuous barrier with ceilings, walls, bulkheads, floors or the like that inherently contribute to the thermal barrier, and (iii) does not affect the safe or effective operation of domestic services or fitting. (b) Where required, reflective insulation must be installed with — (i) The necessary airspace to achieve the required R-value between a reflective side of the reflective insulation and a building lining or cladding: and (ii) the reflective insulation closely fitted against any penetration, door or window opening; and (iii) the reflective insulation adequately supported by framing members; and (iv) each adjoining sheet of roll membrane being- (A) _ overlapped not less than 50mm; or (B) taped together. (c) Where required, bulk insulation must be installed so that - (i) it maintains its position and thickness, other than where it crosses roof e@ battens, water pipes, electrical cabling or the like; and. (ii) in ceilings where there is no bulk insulation or reflective insulation in the wall, so that it overlaps the wall member by not less than 50mm; (d) Roof, ceiling, wall and floor materials and associated surfaces are deemed to have the thermal properties listed in Specification J1.2. 4 Lillypilly Court, Page No. 4 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 51
J1.3 J1.4 J1.5 ASSESSMENT NO: 2009/ 0919 Roof and ceiling construction Design Review As indicated on the supplied Checklist, Anticon with an R-value of 2.5 is to be installed under the roof of the buildings, which will give a Total R-value in excess of the minimum 2.2 required. Result Complies. Roof Lights Design Review Roof lights are not indicated. Result Not applicable. Walls Options for each part of an external wall of a Class 2 or 3 building, Class 4 part of a building or Class 9c aged care building. Climate Zone 1, 2 and 3 (a) ‘Achieve a minimum Total R-value of 1.4. (b) Shade the external wall of the storey with a verandah, balcony, eaves, overhang, carport or the like which projects at a minimum angle of 15 degrees in accordance with Figure J1.5. Design Review As indicated on the supplied Checklist, the external walls of the buildings are to be constructed of rendered 190mm core filled blockwork, that will have a total R-value of approximately 0.25. As per (a) above, the minimum Total R-value required for an external wall is 1.4, therefore the minimum added R-value required for the rendered 190mm core filled blockwork walls is 1.15. This can be achieved by installing wall battens or furring channels, plasterboard and insulation with an R-value of 1.15 or greater. As per (b) above, the external wails that do not require the added insulation are the external walls that have an overhang of 750mm or greater, i.e. the external walls shaded by the patios. Result Will comply if the above design review is satisfied. 4 Lillypilly Court, Page No. 5 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 52
J1.6 J2.0 J2.1 32.2 32.3 32.4 ASSESSMENT NO:2009/ 0919 Floors Design Review The floors are concrete slab and suspended slab construction. Result Not applicable. External Glazing Application of Part The Deemed-to-satisfy Provisions of this Part apply to elements forming the envelope of a building other than- (a) a Class 7, 8 or 9b building that does not have a conditioned space; or (b) an atrium or solarium that is not a conditioned space and is separated from the remainder of the building by an envelope. Applicable glazing provisions Glazing of a building must be designed and installed, as appropriate, in accordance with — (a) J2.3 for a Class 2, 3 or 9c aged care building or Class 4 part; and (b) J2.3 or J2.4 for a Class 6 building with a total floor area of not more than 500m?; and (c) J2.4 for - (i) a Class 6 building with a total floor area of more than 500m?; and (ii) a Class 5, 7, 8, 9a and 9b building. Glazing - Method 1 Design Review The Glazing Calculator results for the Building Envelopes are attached to this report. Result Complies. Glazing - Method 2 Design Review Applicable to a Class 6 building with a total floor area in excess of 500m? and Class 5, 7, 8, 9a and 9b buildings only. Result Not applicable. 4 Lillypilly Court, Page No. 6 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: ‘ (07) 5493 3867
Page 53
J2.5 33.0 J3.4 J3.2 ASSESSMENT NO:2009/ 0919 Shading Design Review No additional shading is required to satisfy J2.3 of BCA 2009. Result Complies. Building Sealing Application of Part The Deemed-to-satisfy Provisions of this Part apply to elements forming the envelope of a Class 2 to 9 building, other than- (a) a building in climate zones 1, 2, 3 and 5 where the only means of air-conditioning is by using an evaporative cooler; or (b) a permanent building ventilation opening, in a space where a gas appliance is located, that is necessary for the safe operation of a gas appliance; or (c) a Class 6, 7, 8 and 9b building that does not have a conditioned space; or (d) a building or space where the mechanical ventilation required by Part F4 provides sufficient pressurisation to prevent infiltration; or (e) an atrium or solarium that is not a conditioned space and is separated from the remainder of the building by an envelope. Chimneys and flues Design Review The chimney or flue of an open solid-fuel burning appliance must be provided with a damper or flap that can be closed to seal the chimney or flue. Result A chimney or flue is not indicated - not applicable. J3.3 Roof lights Design Review (a) A roof light must be sealed, or capable of being sealed when serving ~ (i) a conditioned space; or (ii) a habitable room in climate zones 4, 6, 7 and 8. (b) A roof light required by (a) must be constructed with — (i) an imperforate ceiling diffuser or the like installed at the ceiling or internal lining level; or (ii) a weatherproof seal if it is a roof window; or (iii) a shutter system readily operated either manually, mechanically or electronically by the occupant. Result Roof lights are not indicated - not applicable. 4 Lillypilly Court, Page No.7 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867 ii
Page 54
J3.4 J3.5 ASSESSMENT NO:2009/ 0919 Windows and doors Design Review (a) As air conditioning is to be installed, seals to restrict air infiltration must be fitted to each edge of an external door, openable external window or the like forming part of G) the envelope of a conditioned space; or (ii) the external fabric of a habitable room or public area in climate zones 4, 6, 7 and 8. (b) The requirements of (a) do not apply to — Gi) A window complying with AS 2047; or (ii) a louvre door, louvre window or other such opening; or (iii) —_a fire door, or smoke door; or (iv) roller shutter door, roller shutter grille or other security door or device installed only for out of hours security. (c) A seal required by (a) may be a foam or rubber compressible strip, fibrous seal or the like. (d) A main entrance to a building, if leading to a conditioned space, must have an airlock, self-closing door, revolving door or the like, other than — (i) where the conditioned space has a floor area of not more than 50m? or (ii) where a café, restaurant, open front shop or the like has- (A) a3m deep un-conditioned zone between the main entrance, including an open front and the conditioned space; and (B) all other entrances to the café, restaurant, open front shop or the like have self-closing doors. Result Will comply if the above design review is satisfied. Exhaust fans Design Review A miscellaneous exhaust fan, such as a bathroom or domestic kitchen exhaust fan, must be fitted with a sealing device such as a self-closing damper or the like when serving — (a) a conditioned space; or (b) a habitable room in climate zones 4, 6, 7 and 8. Result As air conditioning is to be installed, any exhaust fan must be fitted with a sealing device such as a self-closing damper, filter or the like. 4 Lillypilly Court, Page No. 8 Phone: (07) 493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867 |
Page 55
J3.6 33.7 J4 J4.1 J4.2 ASSESSMENT NO: 2009/ 0919 Construction of roofs, walls and floors Design Review (a) Roofs, external walls, floors and any opening such as a window, door or the like must be constructed to minimise air leakage in accordance with (b) when forming part of — (i) the envelope of a conditioned space; or (ii) the external fabric of a habitable room or a public area in climate zones 4, 6, 7 and 8. (d) Construction required by (a) must be- : (i) enclosed by internal lining systems that are close fitting at ceiling, wall and floor junctions; or (ii) sealed by caulking, skirting, architraves, cornices or the like. (c) The requirements of (a) do not apply to openings, grilles and the like required for smoke hazard management. Result As an air conditioner is to be installed roofs, external walls, external floors and any opening such as a window, door or the like must be constructed to minimise air leakage as indicated above. Evaporative Coolers An evaporative cooler must be fitted with a self-closing damper or the like when serving- (a) a heated space; or (b) — ahabitable room or a public area of a building in climate zones, 4, 6, 7 and 8. Design Review An evaporative cooler is not indicated. Result Not applicable. Air Movement Application of Part The Deemed-to-satisfy Provisions of this Part apply to a habitable room in a sole-occupancy unit of a Class 2 building or a Class 4 part of a building. Part J4 is not applicable to Class 3, 5, 6, 7, 8 and 9 buildings. Air movement Design Review Result Not applicable. 4 Lillypilly Court, Page No.9 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 56
ASSESSMENT NO:2009/ 0919 J43 Ventilation openings Design Review Result Not applicable. 34.4 Ceiling fans and evaporative coolers Design Review Result Not applicable. O%-0 Air-conditioning and Ventilating Systems J5.1 Application of Part I5.2 Air-conditioning and ventilating systems Design Review (a) 4 Lillypilly Court, KAWANA FOREST..... An air-conditioning unit or system must- (i) (ii) (iii) (iv) (vy) 4551. be capable of (A) _ being inactivated when the sole-occupancy unit, building or part of the building served is not occupied; and (B) where the air-conditioning unit or system has motorised outside air and return dampers, close the dampers when the air-conditioning unit or system is inactivated. Have any supply and return ductwork insulated and sealed in accordance with Specification J5.2; and when serving more than one sole-occupancy unit, zone or area with a unique thermal] characteristic- (A) _ thermostatically control the temperature of each sole-occupancy unit, zone or area; and (B) not control the temperature by mixing actively heated air and actively cooled air; and (C) limit reheating to not more than 7.5K rise in temperature at the supply air rate for the space served and may be increased or decreased at the same rate that the supply air rate is respectively decreased or increased; and in other than Class 6 restaurant, bar or café or Class 9b building, have an outdoor air economy cycle- (A) _ inclimate zone 3, when the system capacity is over 65kWr; and (B) _inclimate zones 4, 5, 6, 7 and 8 when the system capacity is over 65kWr, have an outside air cycle; and in a Class 3 building be capable of controlling the temperature of a sole- occupancy unit at a different temperature during sleeping periods than during other periods; and Page No. 10 Phone: (07) 5493 2981 Fax: (07) 5493 3867
Page 57
(b) (c) 4 Lillypilly Court, KAWANA FOREST (vi) (vii) ASSESSMENT NO: 2009/ 0919 when the air flow rate is greater than 1000L/s, have a fan motor shaft power to air flow rate ratio, or fan motor input power to air flow rate ratio, in accordance with Table J5.2; and the requirements of (vi) do not apply to- (A) fans in a package air-conditioning plant complying with J5.4(c), and (B) __ the input power for an energy reclaiming system that preconditions outdoor air; and (C) _ the input power for process related components such as high efficiency particulate air filters. A mechanical ventilation system must- @ (ii) (iii) (iv) be capable of being inactivated when the building or part of the building served is not occupied; and when serving a conditioned space, not provide mechanical ventilation in excess of the minimum quantity required by Part F4 by more than 50% other than where there is- (A) additional unconditioned outside air supplied- (aa) _ to provide free cooling; and (bb) to balance required exhaust ventilation such as toilet exhaust; ‘and (cc) to balance process exhaust such as from a health-care building or laboratory; or (B) additional exhaust ventilation needed to balance the required mechanical ventilation; or (C) anenergy reclaiming system that preconditions outside air; and when the air flow rate is more than 1000L/s, (A) | have a fan motor shaft power to air flow rate ratio, or fan motor input power to air flow rate ratio, in accordance with Table J5.2; and (B) _ in other than climate zone 2, when serving a conditioned space in a Class 9b building where the number of square metres per person is 1 or less as specified in D1.13 have- (aa) an energy reclaiming system that preconditions outside air; or (bb) _ the ability to automatically modulate the mechanical ventilation required by Part F4 in proportion to the number of occupants. when serving over 40 vehicles in a carpark- (A) _ be controlled by an atmospheric contaminant monitoring system in accordance with AS 1668.2; and (B) —_— maintain an average nimumum air-change rate of 0.5 air changes per hour other than when the carpark is not occupied for a period of more than 2 hours. The requirements of (a) and (b) must not inhibit- (i) Gi) wee 4551, the smoke hazard management operation of air-conditioning and mechanical ventilation systems; and essential ventilation such as for a garbage room, lift motor room, gas meter enclosure or gas regulator enclosure or the like. Page No. \\ Phone: (07) 5493 2981 Fax: (07) 5493 3867
Page 58
J33 J5.4 ASSESSMENT NO: 2009/ 0919 Result Will comply if the above design review is satisfied — clarification of the above, where installed, may need to be certified by a Competent Person accepted by the Certifier. Time Switch Design Review A time switch in accordance with Specification J6 must be provided to control each of the following: (a) an air-conditioning system of more than 10kWr; (b) a ventilation system with an air flow rate of more than 1000L/s; (c) heating systems of more than 10kw (heating) Result Will comply if the above design review is satisfied — clarification of the above, where installed, may need to be certified by a Competent Person accepted by the Certifier. Heating and chilling systems Design Review (a) Systems that provide heating or cooling for air-conditioning systems must- (i) have any piping, vessels, heat exchangers or tanks containing heated or chilled fluid, other than those with insulation levels covered by Minimum Energy Performance Standards (MEPS), insulated in accordance with Specification J5.4; and (ii) where water is circulated by pumping at greater than 2L/s- (A) _ be designed so that the total of the motor shaft power to the air- conditioning pump does not exceed- (aa) 3W/m? for a building of not more than 500m? floor area; and (bb) 4W/m? for a building of more than 500m? floor area; and (B) have the pump capable of varying its speed when it is- (aa) operating for more than 3,500 hours per year; or (bb) is more than 11 kW of motor shaft power except where the pump is needed to run at full speed for safe or efficient operation; and (iii) if the system contains more than one water heater used for heating a building, chiller or coil, be capable of stopping the flow of water to those not operating. (b) A water heater such as a boiler in a heating system for a building, must achieve a thermal efficiency complying with Table J5.4a when tested in accordance with BS 7190. (c) Package air conditioning equipment, including a split unit and a heat pump, must have an energy efficiency ratio complying with Table J5.4b, when tested in accordance with AS/NZS 3823.1.2 at test condition T1. (d) A refrigerant chiller over 125 kWr capacity, must have an energy efficiency ratio complying with Table J5.4c when determined in accordance with ARI 550/590. (e) An air cooled condenser fan motor, other than one that is part of package air- conditioning equipment in (c), must not use more than 15W of motor shaft power for each kW of heat rejected from the refrigerant when determined in accordance with ADT 4cn SUN FUU. 4 Lillypilly Court, Page No. 12 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867 iI
Page 59
(f) (g) (h) @) Result ASSESSMENT NO: 2009/ 0919 The fan of a cooling tower must not use more than- GQ) if a propeller or axial fan, 310W of motor shaft power for each L/s of cooling water circulated; and (ii) if a centrifugal fan, 590 W of motor shaft power for each L/s of cooled fluid circulated. The fan of a closed circuit cooler must not use more than- (i) If a propeller or axial fan, 500W of motor shaft power for each L/s of cooled fluid circulated; and (ii) ‘Ifa centrifugal fan, 670 W of motor shaft power for each L/s of cooled fluid circulated. The fan of an evaporative condenser must not use more than- (i) if a propeller or axial fan, 18W of motor shaft power for each kW of heat rejected; and (ii) if a centrifugal fan, 22W of motor shaft power for each kW of heat rejected. The spray water pump of a closed circuit cooler or evaporative condenser must not use more than 150 W of pump motor shaft power for each L/s of spray water circulated. Will comply if the above design review is satisfied — clarification of the above, where installed, may need to be certified by a Competent Person accepted by the Certifier. J5.5 Miscellaneous exhaust systems Design Review (a) (b) Result A miscellaneous exhaust system with an air flow rate of more than 1000 L/s, that is associated with equipment having a variable demand such as a stove in a commercial kitchen hood or a chemical bath in a factory, must- (i) have the means for the operator to- (A) _ reduce the energy used, such as by a variable speed fan, and (B) _ stop the motor when the system is not needed; and (i) be designed to minimise the exhausting of conditioned air. The requirements.of (a) do not apply- @ within a sole-occupancy unit of a Class 2 or 3 building, Class 4 part of a building or Class 9c aged care building; or (ii) where additional exhaust ventilation is needed to balance the required outside air for ventilation; or (iii) where air flow must be maintained for safe operation. J5.5 does not apply within a sole occupancy unit of a Class 2 or 3 building, Class 4 part of a building or Class 9c aged care building — not applicable. 4 Lillypilly Court, Page No. 13 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 60
we 36 J6.1 J6.2 36.3 ASSESSMENT NO: 2009/ 0919 Artificial Lighting and Power Application of Part The Deemed-to-satisfy Provisions of this Part do not apply within a sole-occupancy unit of a Class 2 building or a Class 4 part of a building. Interior artificial lighting Design Review (a) In a Class 2, 3 or Class 9c aged care building- (i) Artificial lighting must not exceed the maximum lamp power density in Table 6.2a, except that in a bathroom, dressing room or the like, an average artificial light source efficacy of not less than 40 Lumens/W may be used; and (ii) The maximum lamp power density in Table J6.2a may be increased by — (A) 30% for areas of less than 20m? floor area; and (B) for other than a sole-occupancy unit in a Class 3 building, 40% where artificial lighting is switched by a motion detector or a lighting timer in accordance with Specification J6; and (C) 15% where artificial lighting is switched, in response to varying natural lighting levels, by a daylight sensor and dynamic lighting control device in accordance with Specification J6. (b) Applicable to Class 5, 6, 7, 8, 9a and 9b building only. Result Will comply if the above design review is satisfied — clarification of the above, where installed, may need to be certified by a Competent Person accepted by the Certifier. Interior artificial lighting and power control Design Review (a) Artificial lighting of a room or space in a Class 3 building must be individually operated by a switch or other control device. (b) An occupant activated device, such as a room security device, motion detector in accordance with Specification J6, or the like, must be provided in the sole-occupancy unit of a Class 3 building, other than where providing accommodation for the aged, to cut power to the artificial lighting, air-conditioner, local exhaust fans and bathroom heater when the sole-occupancy unit is unoccupied. (c) An artificial lighting switch must- (i) be located in a visible position- (A) _ inthe room or space being switched; or (B) in an adjacent room or space from where the lighting being switched is visible; and Gi) _ not operate lighting within a area of more than- (A) 250 m? for a space of not more than 2000 m? floor area; or (B) 1000 m? for a space of more than 2000 m? floor area; 4 Lillypilly Court, Page No. 14 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 61
ASSESSMENT NO: 2009/ 0919 (d) Artificial lighting in a building or storey of a building, of more than 250 m? in floor area must be controlled by- (i) a time switch in accordance with Specification J6; or (ai) the occupant sensing device such as- (A) asecurity key card reader; or (B) a motion detector in accordance with Specification J6. (e) Artificial lighting adjacent windows in a storey of a Class 5, 6 or 8 building, of more than 250m? in floor area must be switched separately from artificial lighting not adjacent windows. (f) The requirements of (a), (b), (c), (d) and (e) do not apply to the following: (i) Emergency lighting in accordance with Part E4 (ii) Where artificial lighting is needed for 24-hour occupancy such as for a manufacturing process, an airport control tower or within a detention centre. (g) The requirements of (d) do not apply to artificial lighting in a patient care area. @ Result Will comply if the above design review is satisfied — clarification of the above, where installed, may need to be certified by a Competent Person accepted by the Certifier. J6.4 Interior decorative and display lighting Design Review (a) Interior decorative and display lighting, such as for a foyer mural or art display must be controlled- qi) separately from other artificial lighting; and (ii) by a manual switch for each area other than when the operating times of the displays are the same in a number of areas such as in a museum, art gallery or the like, in which case they may be combined; and (iii) by a time switch in accordance with Specification J6 where the display lighting exceeds 7 kW. @ (b) Window display lighting must be controlled separately from other display lighting. Result If installed will comply if the above design review is satisfied. 4 Lillypilly Court, Page No. \5 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 62
a J6.4 56.6 ASSESSMENT NO: 2009/ 0919 Artificial lighting around the perimeter of a building (a) Artificial lighting around the perimeter of a building must- (i) be controlled by either a daylight sensor or a time switch in accordance with Specification J6; and (ii) when the total perimeter lighting load exceeds 100 W- (A) _ have an average light source efficacy of not less than 60 lumens/W; or (B) be controlled by a motion detector in accordance with Specification J6; and (b) The requirements of (a)(ii) do not apply to the following: (i) | Emergency lighting in accordance with Part E4. (ii) lighting around a detention centre. Result Will comply if the above design review is satisfied — clarification of the above, where installed, may need to be certified by a Competent Person accepted by the Certifier. Boiling water and chilled water storage units Design Review Power supply to a boiling water or chilled water storage unit must be controlled by a time switch in accordance with Specification J6. Result A boiling water or chilled water storage unit is not indicated, however if installed will need to comply with the above design review. Hot Water Supply Hot water supply Design Review A hot water supply system for food preparation and sanitary purposes, other than a solar hot water supply system in climate zones 1, 2 and 3, must be designed and installed in accordance with Section 8 of AS/NZS 3500.4. Result Will comply if the above design review is satisfied — clarification of the above, where installed, will need to be certified by a Competent Person accepted by the Certifier. 4 Lillypilly Court, Page No. 16 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 63
J8 38.1 J8.1 38.2 ASSESSMENT NO: 2009/ 0919 Access for Maintenance Application of Part Application of Part The Deemed-to-satisfy Provisions of this Part do not apply within a sole-occupancy unit of a Class 2 building or a Class 4 part of a building. Access must be provided to all plant, equipment and components that require maintenance in accordance with Part I2 below:- Components of services must be maintained to ensure that they perform to a standard not less than they were originally required to achieve, including- (a) adjustable or motorised shading devices; and (b) time switches and motion detectors; and (c) room temperature thermostats; and (d) __ plant thermostats such as on boilers or refrigeration units; and (e) outside air dampers; and ( reflectors, lenses and diffusers of light fittings; and (g) heat transfer equipment. Result Will comply if the above design review is satisfied. CONCLUSION This building will comply with the Building Code of Australia (BCA) — Volume One ~ J1.1 to J1.6, J2.1 to J2.5, J3.1 to J3.7, J4.1 to J4.4, J5.1 to J5.5, J6.1 TO J6.6, J7.1 to J7.2, J8.1 to J8.2 and Part 2 — Energy Efficiency, provided the Design Reviews, where indicated, are satisfied. To the best of my knowledge the above information is true and correct, in line with the plan (Job No. 07- Oi: — sheets 5 to 7, 21, 22 and 34 dated 24/09/09) and the original checklist provided. Report by — Marianne (Mim) Leece BERS Assessor Checked and Certified by — Building Certifier 4 Lillypilly Court, Page No. 17 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
Page 64
Report from 2009-0918-WILBRAHAM01-Glazing - Dorm. 4
printed 10/10/2009
GLAZING CALCULATOR FOR USE WITH CLAUSE J2.3, BCA VOLUME ONE (METHOD 1)
Unit no. Storey} Ground
| Dorms 1to4 | Area of floor 94.3m? |
Glazmg area 25.700? ...
Nuinber of rows preferred in table below
Climate zone Building name/description
nt 1 3 Pacific A\ Avenue, ‘Sunshine £ Bea
.. (27% of area of floor - Storey: Ground)
15 (as curently displayed)
8 [Dorm 4 - 004
9 |Bathroom-Wo2 |
Y10 [Hall - DOS
41 |Bathroom - W03
12 |Bathroom - W04
| _.13 |Dorm 1 - DOS
4.80 [Lamiadh 7-4 A eT I eke)
“|. 3:57 Hd
1:12: SRY ee uae eas
|__14 |Dorm 1 ‘wos
| 45 [Dorm 2 - W06
IMPORTANT NOTICE AND DISCLAIMER IN RESPECT OF THE GLAZING CALCULATOR
The Glazing Calculator has been developed by the ABCB to assist in developing a better understanding of glazing energy efficiency parameters.
While the ABCB believes that the Glazing Calculator, If used correctty, will produce accurate results, il is provided “as is" and without any representation or warranty of
any kind, including that it is fil for any purpose or of merchantable quality, or functions as Intended or at all.
Your use of the Glazing Calculator is entirety at your own risk and the ABCB accepts no liability of any kind.
Copyright © 2006 — Austratian Goverment, State and Territory Govermments of Australia. All Rights Reserved
0.82:{{- keen EE
CONSTANTS and ALLOWANCES (per storey)
Ground | _ tet ged
Cy! Cgnoc 2.510.158
Cy x Area 235.8
Csnoc x Area 14.1
[of
a
eras used
—_
I POON RUEo Pea
Skee Goer a
4.79 Ae Al Renews
1.44 Fumie it 6mm ew it.
"3.30 Pe = Peano
"0.63. Kae era RIE eb ia
Pra eee
TAC
= of CEE lt
ari Pare
aes...
SARE
ARs)
fim 6.5 [3% of 84% my Po ae 4
if inputs are valid}
page 1 of 1
Page 65
Report from 2009-09 18-WILBRAHAMO01-Glazing - Dorm 8 printed 10/10/2009
GLAZING CALCULATOR FOR USE WITH CLAUSE J2.3, BCA VOLUME ONE (METHOD 1)
Climate zone Building name/description ee
2 _. | [Budget A Accomodation, Lot. 163 | Pacific A\ Avenue, Sunshine Beach.. CONSTANTS and ALLOWANCES (per storey)
Upper notused
Unit no. Storey] Upper| | Cy/ Csuec 2.5/0.15
| Dorms Sto 8 | Area of floor] 94.3m? __ Cy x Area 235.8
Glazing area 187m? ........... (20% of area of fluor - Storey: Upper) Concc x Area 14.1
Number of rows preferred in table below 12 {as currently displayed)
ee reer aa
GLAZING ELEMENTS, ORIENTATION, SIZE and PERFORMANCE CHARACTERISTICS [SMOG CALCULATIC “CALCULATION DATA (aie Taare ‘i
Sectorfaced | __—Skzo_———|—Performance | P&H or devico|'--Expostire |
ETE
' Total
U-Value | SHGC
(NFRC) | (NFRC)
and
PRL CP
JEL
IMFORTANT NOTICE AND DISCLAIMER IN RESPECT OF THE GLAZING CALCULATOR if inputs are valid FE
The Glazing Calculator has been developed by the ABCB to assist in developing a better understanding of glazing energy efficiency parameters. /
While the ABCB believes that the Glazing Calculator, if used correctly, will produce accurate results, it is provided “as is" and without any Tepresentation or warranty of
any kind, including that it is fit for any purpose or of merchantable quality, or functions as intended or at all.
Your use of the Glazing Calculator is entirely at your own risk and the ABCB accepts no liability of any kind.
Copyright © 2006 - Australian Government, State and Territory Governments of Australia. All Rights Reserved
page 1 of 7
.
vo
Page 66
Report from 2009-09 18-WILBRAHAMO1-Glazing - Recregiemg etc printed 10/10/2009
7 GLAZING CALCULATOR FOR USE WITH CLAUSE J2.3, BCA VOLUME ONE (METHOD 1)
Climate zone
pe CONSTANTS and ALLOWANCES (per storey)
Ground wot uscd
Unit no. Storey|Ground Cy! Cone 2.510.158
[Recreation etc] Areacffloor| 194m? |__| Cy x Area 485.0
Glazing area 43.2m? ........... (22% of area of fluor - Storey: Ground) Csuge x Area 29.1
Number of rows preferred in table | below 16 (as currenily dispiayed!
Total
Storey: |251 x U-Value | SHGC
Ground {NFRC) | (NFRC)
Laundry - W16 a F ; ‘ :
{Manager - W17 : . - R . -20|:0: =f ¥
Manager - Do8 : . : : . : . 051 0. i See
Bathroom - W18 : | 0. . : . ; Az 1 0 0.49) ERIae
Reading-W19___ ewes 12[ 2. : . 10] 0.731 REC ree ea Pee ere
5 (Dining-W20 aes . . . . i 2.00" 2.02 ; LARA IE %'
Kitchen - W21 Ee : . : . i 2.00 | |. 1:88"
Bathroom -W22__ : : . : . “0. 60|-1:33.|.0: 73 ok 3 (aed
Bathroom -W23___ |_0. : . : . : 3.0% alee {CRA EG a
10 |Sitting-W24 | . . _| 7: . . - : re d
Reception - W01__ ‘ : . . . . .70| 0:33 |. Loren eC eS a
Foyer - D014 . By 2. . : . . 70} 0.33-|- 0.66: Leos OSCE eens eat? Tt
Bar Area - DO02 S| 2. . . . . .70| 0:33 [0:66 | ciao ora IE iE
Dining DO3 ee : . | 7. . : 70] 0.33 [066 -
Recreation W14 . . . i . 70} 0: , 44 050 ; ems 0 oe
Laundry - DO7 x .70f 6.3331
IMPORTANT NOTICE AND DISCLAIMER IN RESPECT OF THE GLAZING CALCULATOR
The Glazing Calculator has been developed by the ABCB to assist in developing a better understanding of glazing energy efficiency parameters.
While the ABCB believes that the Glazing Calculator, if used correctly, will produce accurate results, it is provided “as is" and without any representation or warranty of
any kind, including that it is fit for any purpose or of merchantable quality, or functions as intended or at all.
Your use of the Glazing Calculator is entirely at your own risk and the ABCB accepts no liability of any kind.
Copyright © 2006 — Australian Government, State and Territory Governments of Australia. All Rights Reserved
page 1 of 1
Page 67
Report from 2009-09 18-WiL BRAHAMO1-Glazing - Dorm 14 printed 10/10/2009
GLAZING CALCULATOR FOR USE WITH CLAUSE J2.3, BCA VOLUME ONE (METHOD 1)
Climate zone Building name/description
a “| {Budget Accomodation, Lot 163 Pacific Avenue, Sunshine Beach....4567. _ | GONSTANTS and ALLOWANCES (per storey)
— —Ypper tion
Unit no. Storey! Upper Cy! Cenc 2.510.15
[Dorms 9 to 14] Areaoffioor| 194m?7{ Cy x Area 485.0
Glazng area 34.217 .. (18% of area of floor - Storey: Upper Csuge x Area 29.1
Nu nber of rows preferred in table below 22 {as currenily displayed)
eee Nese Led Erie oh...
Ree cues ase Cena wD galn - aco
[SHADING | CALCULATION B DATA:
Eero Ss Reo
Total
U-Value of %of, j GRA ‘of
| rene are)
(NFRC)
ft
"28 fr ake Wie |
20.61: soe 3% of 50% i
0.90 (Fa aCe
0:37: (CPEB ICRA
03 3 rad
9 A Ree.
7 kaa Pees
0:47 [RD is of i Tee of 50% Taman:
0. oe) ~-0.99-4 YS Re
+2.00 {'0-24:[; 3. aie AG eras —I—Ped RY ee
0.171 6:79 |: 0.73 Le EA les ee PA
O47 10.79] | “0.56 __ ia
“0.53 | 0.59] « 0.61: | ae eo
Dorm 9 - W37
2_ {WC -W38
3__ {Bathroom - W339
wc -Ww40
Dorm 11 - W41
Bathroom - W42
Bathroom - W43
Bathroom - W44
Bathroom - W45
10 [Dorm 12 - W46
41 |Bathroom - W47
12 |WC - W48
13 |Bathroom - W49
14 [Bathroom - W50 2.00] 0.22) a6] Nae 4 8 12% of sa ia
15 (Dorm 14 - W25 2.00 3-83 (Roe u Pxeieca aed
‘ 6 | Pen kkkorenee aa
6.|* 3.60 Lye acon 360. a FEL
‘53: aa eee eee
"54" I Pee ea)
[Dorm 10 - D30 383 PENG amen] Rome
Dorm 9 - 034 : : 5.59 5 EP ER
IMPORTANT NOTICE AND DISCLAIMER IN RESPECT OF THE GLAZING CALCULATOR if inputs are valid EL
| 16 {Dorm 14 - D27
17 |Dorm 13 - 028
‘18 |Bathroom - W26
|__19 |Hail - D29
Bathroom - W27
page 1 of 2
Page 68
Report from 2009-0918-WiLBRAHAMO1-Glazing - pomse$ 14 O printed 1010/2009
GLAZING CALCULATOR FOR USE WITH CLAUSE J2.3, BCA VOLUME ONE (METHOD 1)
Climate zone . Building name/description
| CONSTANTS and ALLOWANCES (per storey)
Upper re i
Unit no. storey! Upper Cu! Conge 25/015
Dorms 9 to 14| Area of floor] 194m?
Cy x Area 485.0
Glazing ares 34.2m? 0... (18% of area of floor - Storey: Upper) Csnoc x Area 29.1
Number of rows preferred i in table below
22 {as currently dispiayed)
GLAZING ELEMENTS, ORIENTATION, SIZE and PERFORMANCE CHARACTERISTICS
Glazing element
ULATED Miele els if hl Tera aan
re": sie
[ SHADING | CALCULATION DATA Ik _ie Lise
Sectortaced | __——Se | Performance _| P&H or device |,
Height | Width Area SHGC
é a 'P
(m) cu) (m’) (NFRC)
The Glazing Calculator has been developed by the ABCB to assist in developing a better understanding of glazing energy “= ficiency parameters.
While the ABCB believes that the Glazing Calculator, if used correctly, will produce accurate results, it is provided “as is" and without any representation or warranty of
any kind, including that it is fit for any purpose or of merchantable quality, or functions as intended or at all.
Your use of the Glazing Calculator is entirely at your own risk and the ABCB accepts na liability of any kind.
ID Description (optional)
Copyright © 2006 — Australian Government, State and Territory Governments of Australia. All Rights Reserved
page 2 of 2
ope
Page 69
DEVEL
(Cashier:
Sunshine Coast
| Reg ional Council
ENT FEES & CONTRIBUTIONS @_
lease Retum to Admin Officer, Development) :
Application Fess
Payee Name:
Read / Drainage Plan Exam
Address:
Road / Drainage Field Inspection
Leal Document Examination
Sealing Fee - Survey Plans, Legal Documents
Sae of Documents, Policy Lists, Misc
(CALCULATIONS. =
Bonding Admin Fee (Contributions, uncompleted works)
Lot Calculation
Ciesed Circuit TV Inspection
| Pre-lodgement Meeting Fee
{ CONTRIBUTIONS _ a
| Developer Contribution — ~Landscaping.
Developer Contribution - Road Other than PSP 553
Developer Contribution - Drainage Other than PSP 554
Developer Contribution — Pathway Other than PSP 685 Inspection Calculation
Developer Contrib. — in Lieu Off St Parking (PSP13 Car parking) 556 ,
Developer Contribution - Other Parks and Community 580 ROADWORKS CONTRIBUTIONS: vaste bette al
ICS.— Community Land (Not currently active) 560 Catchment: |
ICS; — Public Transport 564
ICS — Sewerage (PSP Rural) “557 Road/Section:
ICS — Sewerage (PSP Coastal} 613
ICS — Sewerage — South Peregian (PSP Maroochy) 681 DETAILS tte eg cnn.
Ics ~ Water Supply (PSP) 614 Payee Name: Le. Sf ch Kk. e Me Woo mm - a,
ICS — Sport and Recreation Land (PSP Parks) 559 _| Address: .
ICS - Drainage (PSP Noosaville Master & Ward Street) 581 ° 4 AA Mf /ower Street
| ICS — Road (CMRNICP) If BA not entered then use 594
ICS — Pathway (PSP)
38S . panshine beach ASEF
Development Location:
Total of Fees Paid (Excluding Bonds) $ 22%g0— 102 Pacifhe Srenve JSirshine Bea. usta
CPI Date: _ ee =| AMOUNT: .| RECEIPT, FYPE|| File Numbers or Reference:
Secunty DeposisPeromenostaienarel ncompced Works Bond 51 (Cat 9) [email protected]%. 15% OF ./
Total of Fees Paid (Including Bonds) $ Z220— Date application properly made:
Receipt No:
QC) [Recsint ate STO
I
P:JLand Deve opmenFEES & CONTRIBUTIONS/DEVELOPMENT FEES. doc
Used in these records
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
The download may take up to a minute.