INTEGRATED PLANNING ACT 1997
. 2.
following characteristics, hawever some applications may involve ane or more at these characteristics - comptete only if applicable)

Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. nver, creek, lake, canal)

 

Name of water body, watercourse or aquifer (known)
1.

 

 

 

 

 

Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994

Lot on plan description for strategic port land Port authority for the lot
1.

 

 

 

Table F Complete if the premises are in tidal water

Name of local government for the tidal area {/f applicable)

 

Name of port authority for the tidal area (if applicable)

 

 

 

1.

 

 

 

3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may inchide land both above and below water)

Total aréa of premises (land on which the development is proposed)
(oly j2rlo|/O ne OD hectares (appicaote unit)

Existing use of the premises

 

 

 

 

 

 

 

 

 

 

 

 

Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

 

Part A, Version 3.1, 3 March 2008
Identity if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of the

 

Rosrdearmar Kose

 

 

Se 5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)
yy Oh

Yes ~ Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
Proposal details

6. Brief description of the proposal: (eg. 6 unit apartment building, 30 tot residential subdivision, a bore, aquaculture etc.)

 

 

Deconnmodamon Tope OF ~ Hraate\

2

 

 

Does the proposal include‘new building work or operational work fiackuding any services) on the premises?
[LINo

Yes - Ensure the nature, fecation and dimensions of the propused works ave included in plans, subraitted with the ‘application

Resource entitlement (applicable) — further information is provided in the advice section at the end of the forin

8. Does the application involve taking or interfering with a State resource and: therefore require a resource entitlement? (eg. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No - Gow Q9 Oo Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable, Evidence of resource allocation or
entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
Nature of State-owned resource

 

 

 

Table G ” [Nature of evidence-required
Ailocation/entitlement na a set . State Government Date of } Date of
reference number Name of authorising officer Position of authorising officer Department issue _| expi
1. :

 

 

 

 

 

 

 

 

 

 

Owner's corisent (7. applicable) - further information is provided in ihe advice section at the end of the form

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and not

within a canal as defined under the Coastal Protection and Management Act 1995; or'work on rail corridor land defined under the
Transpoit Infrastructure Act 199¢ - provide details (or each owner on a separate row, of on an attachment to this form i applicable.
TableH ~

 

Premises Owner's name/s

Details of the premises owned eyf signatur | jDate consent
and postal address (street address or fot on plan description) if : 9 was obtained
1. [TAH R Redneck tot PacKe Poe-

1O% Cacwric vee SEseine Beda {

 

 

 

 

    

iL (0-09

 

 

Tee. Boots

 

 

KR

* Owners signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the [PA website .

Page 2

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published].pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.