Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508

of 69

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

a

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

Attachments and supporting information (Complete Table |- Use a separate row for each ype of attachment or information, including information required under
this Parl) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form.

 

 

Table | Description of attachment or information Title @ appticabie) Method of delivery to
Ce a COLI ee ae Taine oat” _| (eg. Generet Authoriy, James Steet Trafic Repon} Date assessment manager
1. Faas S- Plows Shaminey
CORON ILE |

 

 

 

 

 

 

 

Portable Long Service Leave (PLSL) levy (Appticable for certain building and construction work valued over $80,000 only)

10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (~ bax if applicable)
(J the application seeks a preliminary approval only; :

(7 the application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave)
Act 1991, section 3AA (e.g. the application is anly for a change af use. or for the following types of work carried out solely for farming purposes:
land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or
controlling weeds or pests};

all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
@ LD the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if ovmer-buiider permit number stated). The roceipted form must be sighted by the
assessinent manager before a develgoment permit can be given. .
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)
LI No - End of Pat A Yes - Answer Q12 below :

12, Has the PLSL levy been paid?

i] No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the
Assessment Manager before a development permit may be given for this application, To pay the levy you will need to complete and submit a Notification

and Payment Form to Qleave.) .
J Yes - Complete Table L and submit, with the application, the “yellow” (Local Government's (Council) / Private Certiier’s) copy of the receypted QLeave Farm.

 

 

 

 

 

 

 

 

Table Amount paid Date paid (6 Gite wang ABE or Pp)
1. | $1700-00 | 1+ -B-0% COACALS

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)

: . Receiving . Reference ©
@ Fee (8) Date received officer's name numbers

 

 

 

 

 

 

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

To: Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

 

 

Date of engagement Name BSA Certification license number Building Gassification’s

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

‘Amount paid Oate receipted form
Oéseription of the work QLeave Project Number 8) Ri Date paid sighted by Name of officer who sighted the form.
assessment manager

 

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.

_| Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992} or
as required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.

 

 

 

. Page 3

i

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published].pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.