Council archive · source document
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508
4. Information to be provided — for Construction or Demolition Works 4.1 The waste management plan for the demolition stage of a development is to contain the following information: Material On-site Destination* Re-use & Recyclin Disposal Type of Material Estimated On-site Off-site Specify Volume specify specify contractor and proposed reuse contractor and landfill site or on-site recycling recycling outlet methods Excavation Create required material levels Garden Organics Bricks 60m3 . Ail Coast , . ‘ demolition ~ Noosa Waste Station recycling Concrete 80m3 All Coast : Demolitions -— Noosa Waste Station recycling _ Timber — please Roof trusses, Salvage Centre Specify flooring, framing 44 Price Street, 6m3. Nambour Plasterboard “8m3 . All Coast : Demolitions - Noosa Waste Station recycling Asbestos - 10m3 . All Coast Roofing Asbestos Removals — Noosa landfill Other — please Windows (10) Salvage centre Specify 44 Price Street, Nambour fir een ’ j
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.