09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508

of 69

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Tabte 14-40 — All Demclition, removal or relocation

$1.1 Buildings are relocated to another site and adapted to meet the needs of users.
OR
$1.2 At least 10% of building materials are reused or recycled (measured in cubic metres)

All block and concrete material will be re-used at the Noosa waste Station. All timber and
windows are to be recycled through the contractors yard.

and

$2.1 A Waste Management Plan (see page 2) prepared in accordance with Schedule 9 Demolition
& Construction Waste Management specifies— ~

a) Estimated volumes of waste to be generated;

b) Estimated volumes of recyclables;

¢) Initiatives to minimize waste-by-waste reduction, reuse or recycling;

d) Plans showing the location and details of the waste storage areas; and

e) A description of the type of containers proposed to store the waste.

The contractor’s method is for no storage on site with material being transported directly from
site to destination. No site plans are provided as there is no collection on site. Ail absestos
removal is as per government and legal requirements.

and

$3.1 Infrastructure including, reticulated water, sewerage, storm water, and electricity are protected
from damage and made safe to the standard required by the regulatory authority; ,

Provision for all services has been dealt with. Water will be connected to one site tap only for
the period of construction. Sewerage will be capped at the designated point for reconnection
during construction phase. Electricity will be connected to a new power pole to the side of the
site. Storm water protection is controlled by the site silt management plan attached to the
Hydraulic drawings in the BA. All connections meet regulatory standards.

and

$3.2 Infrastructure is disconnected, capped or sealed including—

a) Electricity meters are removed and electrical wires disconnected; and

b) Telephone lines are disconnected; and

c) High speed data cables and television provider boxes are disconnected and removed;

Electrical contractor will transfer electrical connection and meters to new pole for demolition
and construction phase. All telephone cabling and TV boxes will be removed prior to
commencement.

and

$3.3 A temporary crossing is provided to protect road reserve infrastructure including kerb and
channel. : ,

The existing concrete crossover will be used during the demolition and construction phase as
this is a wide access point which provides a continual concrete drive through to the
demolition and construction area, eliminating extra dirt and site debris from entering the road.
New site access points and reinstatement of the kerb is to be completed as part of the DA at
the last part of construction.

and

 

 

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published].pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.