Council archive · source document
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508
9
e
JTS
A:
cit
: 7
oo JRECEIVE]D)
21 CCT 2303
GLOBAL TESTING ===
THE ONLY NAME IN SOILS
-
iA
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville.
JOB NUMBER 09/0517 SITE CLASSIFICATION REPORT
CLIENT W. REDWOOD.
SITE:LOCATION | PROPOSED RESIDENCE,
102 PACIFIC AVENUE, SUNSHINE BEACH.
REPORT DATE _| 27/08/09
INTRODUCTION
The purpose of this report is to classify the subject allotment in accordance with Australian Standard
2870 - 1996 ‘Residential Slabs and Footings’. From this classification a footing system can be
recommended for the structure so as to allow adequate performance of the footings under the soil
conditions determined at the site.
This report relates exclusively to the proposed residence at 102 Pacific Ave, Sunshine Beach. This
document has been prepared for the express purpose stated above. This document does not cover any
other elements related to construction on the site.
SITE DESCRIPTION
The subject site is a residential allotment, which fronts a sealed road. The site has an existing
residence that is to be demolished.
The site is grassed with scattered undergrowth, and has scattered medium to large sized mature trees
present.
The site falls at a slope of approximately 3-4% towards the road.
Surface water will drain towards the road. Surface water from adjoining allotments will not traverse
this site.
The allotment is surrounded by existing residences.
The site has no dams or watercourses.
The site is not a known flood area.
SOIL PROFILE
The borelogs carried out at the site, refer attached Site Plan for localities, indicate that the soil profile
typically consists of a moist, grey, fine to medium grained SAND.
Dynamic Cone Penetrometer testing indicated that the SAND was typically loose to a depth of
1700mm, where the underlying SAND becoming medium-dense.
Rock was not encountered during the site investigation.
Groundwater was not encountered during the site investigation.
Whilst every effort has been made to ensure that the borelogs carried out at the subject
allotment are indicative of the soil profile over the site any discrepancy between the profile
detailed in the borelogs and that observed during construction shall be referred to Global
Testing for immediate attention.
09/0517 Page |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.