Skip to the record
The only place to find full transcripts.

Council archive · source document

09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508

of 69

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

J33

J5.4

ASSESSMENT NO: 2009/ 0919
Result

Will comply if the above design review is satisfied — clarification of the above, where
installed, may need to be certified by a Competent Person accepted by the Certifier.

Time Switch
Design Review

A time switch in accordance with Specification J6 must be provided to control each of the
following:

(a) an air-conditioning system of more than 10kWr;

(b) a ventilation system with an air flow rate of more than 1000L/s;

(c) heating systems of more than 10kw (heating)

Result

Will comply if the above design review is satisfied — clarification of the above, where
installed, may need to be certified by a Competent Person accepted by the Certifier.

Heating and chilling systems
Design Review

(a) Systems that provide heating or cooling for air-conditioning systems must-

(i) have any piping, vessels, heat exchangers or tanks containing heated or
chilled fluid, other than those with insulation levels covered by Minimum
Energy Performance Standards (MEPS), insulated in accordance with
Specification J5.4; and

(ii) where water is circulated by pumping at greater than 2L/s-

(A) _ be designed so that the total of the motor shaft power to the air-
conditioning pump does not exceed-
(aa) 3W/m? for a building of not more than 500m? floor area; and
(bb) 4W/m? for a building of more than 500m? floor area; and
(B) have the pump capable of varying its speed when it is-
(aa) operating for more than 3,500 hours per year; or
(bb) is more than 11 kW of motor shaft power
except where the pump is needed to run at full speed for safe or
efficient operation; and

(iii) if the system contains more than one water heater used for heating a building,

chiller or coil, be capable of stopping the flow of water to those not operating.

(b) A water heater such as a boiler in a heating system for a building, must achieve a
thermal efficiency complying with Table J5.4a when tested in accordance with
BS 7190.

(c) Package air conditioning equipment, including a split unit and a heat pump, must
have an energy efficiency ratio complying with Table J5.4b, when tested in
accordance with AS/NZS 3823.1.2 at test condition T1.

(d) A refrigerant chiller over 125 kWr capacity, must have an energy efficiency ratio
complying with Table J5.4c when determined in accordance with ARI 550/590.

(e) An air cooled condenser fan motor, other than one that is part of package air-
conditioning equipment in (c), must not use more than 15W of motor shaft power for
each kW of heat rejected from the refrigerant when determined in accordance with

ADT 4cn
SUN FUU.

4 Lillypilly Court, Page No. 12 Phone: (07) 5493 2981
KAWANA FOREST.....4551. Fax: (07) 5493 3867

iI

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published].pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.