Planning Report

Attached to the e-mail MCU15/0108 & REC15/0028 Development Application.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Specific Outcomes                         Probable Solutions                            Proposal
supporting the proposed development;      water;
AND                                       AND

                                          S16.3 Street lighting is provided in          Not Applicable
                                          accordance with Section 3.19 of PSP5          The proposal is        for   a   boundary
                                          Engineering Design Standards – Roads,         realignment only.
                                          Drainage and Earthworks;
                                          AND

                                          S16.4 For lots not within a sewerage          Not Applicable
                                          service area—the lot has sufficient area      The site can be connected to reticulated
                                          and other attributes to ensure                sewerage.
                                          sustainable on-site sewerage disposal;

                                          Advisory note
                                          PSP24 – Effluent Disposal details
                                          requirements for the design and siting of
                                          effluent disposal systems where located
                                          outside a sewerage service area.
                                          Compliance with PSP24 will be
                                          considered as part of Council’s
                                          assessment of the plumbing and
                                          drainage application.

O17 Essential public utilities are        S17.1 Components of the infrastructure        Complies
available and maintain their function     that are likely to fail or may result in      The site is connected to all essential
during flood events up to a 1% AEP        contamination are—                            services.
(1:100 year ARI) flood event.             a) located above the level of a 1% AEP
                                          (1:100 year ARI) flood event; or
                                          b) designed and constructed to exclude
                                          water inundation or infiltration and resist
                                          hydrostatic and hydrodynamic forces as
                                          a result of inundation.
Electricity supply infrastructure         S18.1 Building footprints are situated        Complies
O18 Uses and works maintain a safe        clear of any power easements on-site;         No power easements located on site.
distance from electrical infrastructure   AND
including substations, overhead power
lines, power poles and transformers.      S18.2 Building footprints are not less        Complies
                                          than 50m from an existing fenced              No electricity substation within 50m.
                                          electricity substation.
14.190 Earthworks and stormwater management
O19 Stormwater run-off is managed so      No solution provided                          Not Applicable
as not to cause any adverse impacts on                                                  No additional lots are proposed with the
the built or natural environment                                                        boundary realignment.
including changes in quality, quantity
or location of stormwater discharges.
O20 Filling or excavation only occurs     No prescribed solution.                       Not Applicable
where it does not adversely impact on—                                                  No filling or excavation is proposed as
a) watercourses, drainage lines and                                                     part of the reconfiguration.
wetlands; or
b) vegetation on land identified on
Biodiversity Overlay Maps OM1.1-OM9.1;
or
c) water levels on properties elsewhere.
14.191 Landscaping and visual amenity
O21 Land development responds to the      S21.1 The natural landform and                Complies
distinctive landscape character of the    landscape are not modified to                 No landform modification is proposed as
site by utilising the natural features of accommodate the development.                  part of the reconfiguration.
the site, which include—
a) watercourses and drainage lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and
e) views.
O22 Native vegetation, including          S22.1 Buffers of existing native              Not Applicable
individual mature trees are retained,     vegetation around site boundaries and         No native vegetation or environmentally
protected, maintained and                 environmentally sensitive areas are           sensitive areas exist on the site.
Log in to download the original file

Planning Report.pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.