Planning Report
Attached to the e-mail MCU15/0108 & REC15/0028 Development Application.
Specific Outcomes Probable solutions Proposal
b) 30m for transmission lines between
133kV and 275kV; and
c) 40m for transmission lines greater
than 275kV.
Hot Water Systems S3.1 All hot water systems installed Complies
O3 Hot water systems are installed and are— An appropriate hot water system will be
operated to support the efficient use of a) solar systems; or installed.
natural resources and minimise b) electric heat pump systems; or
consequent pollution such as c) natural gas or LPG systems; or
greenhouse gas emissions. d) any combination of a), b) or c).
Water supply and conservation S4.1 & S5.1 For a Class 1 building Not Applicable
O4 On-site water storage is designed other than a Detached house or The site is included within a reticulated
and operated to support the efficient Multiple Housing Type 1, outside a water area.
use of water; reticulated water service area, a
rainwater tank is to be installed with the
AND following minimum storage capacities—
a) Where no more than 3 bedrooms –
O5 On-site water storage is adequate 45,000 litres; or
for occupants every day use and fire b) Where more than 3 bedrooms –
fighting purposes. 60,000 litres;
AND
c) There is to be on the lot a dam,
swimming pool or water tank accessible
for use by the fire brigade that contains
at least 5,000 litres of water.
Advisory note
The 5,000 litres required can be included
within the water required in S4.2 or S5.1
providing it is accessible for the purpose of
fire fighting at all times and not used for other
domestic purposes.
Erosion and sediment control No solution provided. Complies
O6 Development does not cause erosion Appropriate erosion and sediment
or result in transport of sediments off- Advisory Note control measures will be applied to
site. Persons undertaking development, including ensure the development does not cause
building work, are required under the erosion or result in transport of
Environmental Protection (Water) Policy 1997
(EPP) to ensure that sediment and other
sediments off-site.
material including building waste, sawdust,
concrete, cement or paint are not deposited or
released into a roadside gutter, stormwater
drain or waterway, or into a place where it
could reasonably be expected to move or be
washed into a roadside gutter, stormwater
drain or waterway and are not washed from
the site. Council enforces the EPP and
penalties may apply.
Safety and security S7.1 The building entrance is clearly Complies
O7 For Multiple Housing Types 2, 3 identifiable and visible from the street, The proposed duplexes achieve a clearly
and 4, buildings and outdoor spaces are footpath and driveway; identifiable and visible entrance point
designed to protect the personal security from the street.
and safety of residents by allowing for AND
natural surveillance. S7.2 The internal path network has Complies
clear sightlines to the dwelling entry and Separate entry paths are proposed to
street access points; each unit.
AND
S7.3 Visitors have direct access to the Complies
entrance without passing through Each dwelling unit is provided with
private outdoor living areas. individual entry points/walkways to the
respective dwelling unit. Private open
space areas for each unit are
appropriately screened to reduce
unlawful entry from adjoining dwelling
units. While visitors pass through
private outdoor living areas of the
respective unit in which they may be
visiting, this will not impact on adjoining
dwelling units on the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.