SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 12 APRIL 2022
Environmental Harm Mitigation
Risks
Works impact on the The contractor is responsible for the development and implementation of
environment strategies to minimise impacts such as noise, dust, vibration, sediment, and
erosion. Species management plans are in place and are approved by the
Queensland Government to manage species such as Tusked Frogs,
Cascade Treefrogs, Giant Barred Frogs and Scrub Turpentine.
Tree removal has been brought back to the minimum required. The
superintendent and Council’s project team together with a Council appointed
arborist consultant will closely monitor the construction to ensure all impacts
are minimised.
Scope and Quality Mitigation
Risks
Risk of not meeting To be managed through reviews performed by an experienced Project
project objectives Manager, Superintendent, and other project team members, supported by a
specialist consultant.
Public Disruption Risks Mitigation
Traffic disruption due to See the 'access during construction' section in this report.
total road closure at the
site location
Communication issues Council’s internal experienced Infrastructure Communications and
Consultation Officer is appointed to the project.
Noise from plants and This will be minimised by working during normal working hours where
equipment may be a possible.
cause of disruption to
residents
Vibration during piling and Due to soil investigation outcomes, a bored pile solution with steel liners has
demolition been specified which uses a combination of vibration, oscillation & rotational
method. The vibration produces by the machine is very low in comparison the
usual pile driving.
After contract award, a risk assessment will be performed to determine if
additional vibration monitoring is required. Pricing for this monitoring has
already been locked in with contractor in post-tender close clarifications. The
project budget contingency is sufficient to cover this cost.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Departments/Sections Consulted:
Chief Executive Officer Community Services X Corporate Services
Executive Support Director X Director
Community Development X Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws X Procurement
Waste & Environmental Health Property
Revenue Services
Executive Services Environment & Sustainable Development X Infrastructure Services
Director Director X Director
Community Engagement Building & Plumbing Services X Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture (Work Environmental Services Disaster Management
Health & Safety)
Strategic Land Use Planning X Infrastructure Planning,
Design and Delivery
Page 9 of 40
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.