Council archive · source document
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published] · 132008.1128
EXCAVATION LOG _GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08 BOREHOLE LOG SHEET 32 Hi-Tech Drive BOW L ER Kunda Parwaid 4556 —‘| Borehole No. BH4 CGEOTECHNI CAL Telephone: 07 5450 1544 SHEET 1 of 1 Fax: 07 5450 1533 Client: Cardno (Qld) Pty Ltd Job No.: 3381 Project: Blue Care Aged Care Facility Surface RL: Unknown Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0° Position: 56 J 509839 7078656 Contractor: Driller: SS/JC Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC STRATA DRILLING & TESTING MATERIAL RL SAMPLE DCP DESCRIPTION ADDITIONAL (m) | oo AND Blows per 100mm DATA Bl wo TEST COMMENTS > 2] sis DATA & $ | 21 8oe 4 2) 2 heey S 2| 8 B34 a D| ois 8q i 010 20 30 40) 6.00 0 SILTY SAND, poorly graded, brown, moist, = Fue - loose to medium dense 4 bs : - et & - 4 1 f 2 | ao bas a 0.60 3 a . 4 3 SAND, poorly graded, very pale grey, moist, Zz - medium dense 4 3 a - 4 2 4 3 r— 1.00 — = SP 2 3 = 3 s 4 i— LS 1.4 Sf 4 SAND, poorly graded, brown/grey, moist, ig a - medium dense a r se | : i 7 i | | 7 2200 - _ 9 SAND, poorly graded, very pale grey, moist, ie - medium dense to dense 4 sP 1 23 Ht A | eee ee 4 24 oy SAND, poorly graded, very pale grey, wet, Water Observed it SP - dense 4 p50 _ Borehole terminated at 2.5m due to ES —— § tip refusal 4 -— 3.00 = — = 4,00
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.