Council archive · source document
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published] · 132008.1128
EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08 BOREHOLE LOG SHEET 32 Hi-Tech Drive BOW I i ER Kunda Parkiaid 4556 | Borehole No. BHS Telephone: 07 5450 1544 SHEET 1 of I GEOTECHINICAL Fax: 07 5450 1533 Client: Cardno (Qld) Pty Ltd Job No.: 3381 Project: Blue Care Aged Care Facility Surface RL: = Unknown Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0° Position: 56 J 509902 7078659 Contractor: Driller: SS/JC Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC STRATA DRILLING & TESTING MATERIAL RL SAMPLE DCP DESCRIPTION ADDITIONAL (m) | » AND Blows per 100mm DATA 5 TEST COMMENTS > =| 2 8 DATA € & i 6 a = 2 kaog z 5 | 8 BsEq a 3 | § e584 of Lu O10 20 40} 0.00) SAND, poorly graded, grey, moist, very = [- loose to medium dense Ss ep Es = 09d at Pl Pl TT = SY SAND, poorly graded, dark grey/dark — 1.00 k— brown, moist, medium dense L. 7 lL. Ls 160 er ie a eee eee et ee sae, ae sae ee er eee se SAND, poorly graded, dark brown, moist, & fF medium dense - SP a P L a— 2: Pp — — — SAND, poorly graded, grey/brown, moist, = medium dense — sP — — 3. Borehole terminated at 3.0m . my To j1l \ is r L & be bis -—+— L 4.00
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.