Council archive · source document
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published] · 132008.1128
EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08
BOREHOLE LOG SHEET
32 Hi-Tech Drive
BOW I i ER Kunda Parkaid 4556 ~—‘ | Borehole No. BH7
CEOTECHNIC AL Telephone: 07 5450 1544 SHEET il of 1
Fax: 07 5450 1533
Client: Cardno (Qld) Pty Ltd Job No.: 3381
Project: Blue Care Aged Care Facility Surface RL: = Unknown
Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0°
Position: 56 J 509939 7078590 Contractor: Driller: SS/JC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
RL SAMPLE DCP DESCRIPTION ADDITIONAL
(m) | » AND Blows per 100mm DATA
5 TEST COMMENTS
7 a] 2] 4 DATA
E 2 a 5
~ 2 bLacd
& 9 | bae4
$8s
° BLOF Li 0_10__20__30 40)
0.00 1 SILTY SAND, poorly graded, dark brown,
tL F moist, loose
1 =
1
p sm | pj J LL
2
1
| 06 —
1 SAND, poorly graded, grey, moist, loose
2
& sp L
2 s
2
— 1! —4
3 S. ), poorly graded, very pale grey,
i 2 [- loose to medium dense
S 5 L
i
3] |
-— SP =
2
3 s
i 3 5
4 5
2 ee ees
i * 4 SAND, poorly graded, grey, moist, medium
— fF dense
5
4 i
6 5
5
Po SP Ls
6
be L
7
7
7 -
8
— 3 7 SSS Se Borehole terminated at 3.0m
| 7 5
9
10
aT
ll t
nt
r= F
4.00
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.