Council archive · source document
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published] · 132008.1128
EXCAVATION LOG _GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08 BOREHOLE LOG SHEET 32 Hi-Tech Drive BOW I IER Kunda ParkQid 4556 | Borehole No. BH6 CEOTECHNICAL Telephone: 07 5450 1544 SHEET 1 of 1 Fax: 07 5450 1533 Client: Cardno (Qld) Pty Ltd Job No.: 3381 Project: Blue Care Aged Care Facility Surface RL: = Unknown Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0° Position: 56 J 509959 7078637 Contractor: Driller: SS/JC Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC STRATA DRILLING & TESTING MATERIAL RL SAMPLE ; DCP DESCRIPTION ADDITIONAL (m) | » AND Blows per 100mm DATA Els TEST COMMENTS = =| 214 DATA & S12 Lo é 5 | 2 Bae 8 3) & eeeq Lu 0102030) 40) 0.00 1 SAND, poorly graded, grey, moist, loose L 11] 4 2 a SP —|_ L 2| 3 | 0.60 om 21 SILTY SAND, poorly graded, brown, moist, i 3 | - loose to medium dense i a 9 8 r— 1.00 4 = 11 13 1.30 9| 8 | SAND, poorly graded, grey, moist, medium - sP —— + dense ae 8 eke ph aminteveenin anti maser 7 SAND, poorly graded, very pale grey, moist, — + medium dense 6 6 7 7 r— 2.00 SP — 6 6 = 5 & 6 Po 2.5 6 Fe eee se a: seme sin pe ee ee neo 5 SAND, poorly graded, grey/pale brown, — 6 + moist, medium dense i sP Ti I 6: 7 — 3 7 : Borehole terminated at 3.0m _ p—it__| 5 _ 7. L 7 7 7 6 6 7 — 7 & 4,00
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.