Negotiated Decision Notice - RAL26 0011 (As Published)
Currency Period
2. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 22 July 2030, unless
an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
24-0565P-01 A Plan of Reconfiguration, prepared by therefor Group 03/12/2025
4. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Boundary Encroachments
5. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the site
complies with the relevant provisions of the planning scheme and the Building Act
1975, unless varied by this Decision Notice;
b. all utility services and connections (e.g., electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement;
c. all existing and proposed effluent disposal areas are wholly located within the lot they
serve and comply with the boundary setback requirements of the Plumbing and
Drainage Act 2002 and associated codes and requirements;
d. all dams (including ponded water, dam walls and associated spillway structures) are
wholly located within the boundaries of a single lot; and
e. all retaining walls and structures are fully contained within the lot they retain.
Services
6. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with an approval for Operational Works and the standards and requirements of
the relevant service provider.
7. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
8. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easement
9. The plan of subdivision submitted to Council for endorsement must include a table which
allocates the benefit of the existing access and services easement (Easement C in Lot 1 on
SP199340) to proposed Lots 1 and 2, as identified on the approved plans in accordance with
Section 22.6.3 of the Registrar of Titles Directions for the Preparation of Plans 2025.
10. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
Page 2 of 14
Document Set ID: 25097855
Version: 3, Version Date: 26/08/2026