Negotiated Decision Notice - RAL26 0011 (As Published)

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                      Currency Period
               2.     This development approval lapses if the requirements of the conditions have not been
                      completed and an application for plan seal is not lodged with Council by 22 July 2030, unless
                      an application to extend the currency period is approved by Council.
                      Approved Plans
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                        Plan No.          Rev.    Plan/Document Name                                        Date

                        24-0565P-01       A       Plan of Reconfiguration, prepared by therefor Group 03/12/2025

               4.     All lot numbering on the subdivision plan to be submitted to Council for compliance
                      assessment must remain as shown on the Approved Plans.
                      Boundary Encroachments
               5.     Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
                      certifies that:
                      a.      the setback/s to any new boundaries for any existing buildings remaining on the site
                              complies with the relevant provisions of the planning scheme and the Building Act
                              1975, unless varied by this Decision Notice;
                      b.      all utility services and connections (e.g., electricity, telecommunications, water,
                              sewerage) are wholly located within the lot they serve or alternatively included within
                              an easement;
                      c.      all existing and proposed effluent disposal areas are wholly located within the lot they
                              serve and comply with the boundary setback requirements of the Plumbing and
                              Drainage Act 2002 and associated codes and requirements;
                      d.      all dams (including ponded water, dam walls and associated spillway structures) are
                              wholly located within the boundaries of a single lot; and
                      e.      all retaining walls and structures are fully contained within the lot they retain.
                      Services
               6.     Reticulated electricity and telecommunication services must be provided to each lot in
                      accordance with an approval for Operational Works and the standards and requirements of
                      the relevant service provider.
               7.     Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               8.     Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easement
               9.     The plan of subdivision submitted to Council for endorsement must include a table which
                      allocates the benefit of the existing access and services easement (Easement C in Lot 1 on
                      SP199340) to proposed Lots 1 and 2, as identified on the approved plans in accordance with
                      Section 22.6.3 of the Registrar of Titles Directions for the Preparation of Plans 2025.
               10.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.




                                                                                                           Page 2 of 14
Document Set ID: 25097855
Version: 3, Version Date: 26/08/2026
Log in to download the original file

Negotiated Decision Notice - RAL26 0011 (As Published).pdf · 622 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.