2016-04-19 P&E Committee - Item 4, Attachment 1 - Draft Koala Conservation Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnReference Action Success Indicator Responsibility Time frame Resources Status
5.2 Upload koala Intranet webpage is Environment June 2016 Officer time TMR technical
sensitive design developed Services guidelines for
guidelines on roads are
Intranet IT available online
5.3 Conduct audit of Audit and feasibility Environment February 2017 Officer time Not started
current koala report on Services
infrastructure development and Tablet for mobile Apply through IT
including land maintenance of koala data collection budget
bridges, culverts, friendly infrastructure $4000
pipes, culverts, road is completed
Current GIS
signs, climbing bridge asset layer
ladders, directional
and exclusion
fencing.
5.4 Deliver koala hard Koala infrastructure is Civil operations 2017-2022 Officer time
infrastructure during delivered
renewals at key Cost of assets
mitigation zones TBA
5.5 Consult with Qld Meet with State Environment April 2016 Officer time Not started
Department of Government officers Services
Transport and Main
Roads on koala
infrastructure
requirements for
State Roads
28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.