Original source · versioned page text
2016-04-19 P&E Committee - Item 4, Attachment 1 - Draft Koala Conservation Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnReference Action Success Indicator Responsibility Time frame Resources Status
5.6 Monitor the Monitoring is Environment Ongoing Officer time Started
effectiveness of new undertaken Services
technology trials
such as road
reflectors to
discourage koalas
and other wildlife
from crossing roads,
koala alert signs at
crossing points and
improved lighting
Objective 6. Conduct targeted pest control
6.1 Partner with Council Campaign is run Environment One campaign Officer time Not started
Regulatory Services Spring each year Services and per year
to promote Regulatory Fact sheets
responsible dog Services
ownership
6.2 Targeted wild dog Targeted wild dog Environment Twice per year Officer time Ongoing
control in key Koala control undertaken services
Habitat Areas as twice per year Current Wild Dog
identified in Koala Pest Management program budget
Threat Map
6.3 Investigate research Research project is Environment 2017/2018 Officer time Not started
opportunities to undertaken Services
assess the impact of Research grant
wild dogs on koala
29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.