Setback
3. The setback to the rear boundary must be a minimum of 6.0m to the building wall.
4. Only cantilevered building elements may be built within the reduced rear setback
area in accordance with amendments by Council shown on the approved plans.
Building Height
5. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground surface.
6. Certification must be submitted to Council from a Licensed Surveyor prior to issue of
a certificate of classification which certifies that the building does not exceed the
maximum height requirement of this Decision Notice.
7. No part of the Class 10a storeroom on the southern boundary of the site is to exceed
3.5 metres above natural ground level within the 1.5m side boundary setback area.
Currency Period
8. The Currency Period for this development approval lapses if the development has not
commenced and all conditions have not been complied with within 4 years of the
commencement of the approval, unless an application to extend the currency period
is approved by Council.
Performance Bond
9. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000.00 must be submitted to Council prior to the issue of a Development Permit
for Building Works to secure performance of all conditions of this approval. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Landscaping
10. A minimum of 20% of the site must be retained as soft landscaping.
11. A minimum 5 metre wide soft landscape buffer must be provided along the eastern
site boundary with no more than 5m2 of paved or impervious area located in the 5
metre setback as annotated by Council on the approved plans.
12. Native trees and shrubs selected from the preferred plant species list for Coastal
Beachfront Areas in Planning Scheme Policy PSP03 Landscaping Plants and
Guidelines are to be planted in the 5 metre landscape buffer. Vegetation must be
planted to cover at least 50% of the 5 metre setback area between the proposed
detached house and the eastern boundary of the site in accordance with Council’s
Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. The remaining
50% may be planted turf species capable of withstanding coastal environment
otherwise must be planted out with native trees and shrubs. The planted vegetation
must have a minimum pot size of 140 mm and consist of native, endemic species
with a mature over-storey height of not less than 1.5 metres and a maximum spacing
of 3.0 metre centres.
13. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Site Access and Driveways
14. A sealed access driveway must be provided from Lorikeet Dr to the proposed garage
of the development. The works must be undertaken generally in accordance with the
approved plans and must be undertaken under a Road Reserve permit.
Page 5 of 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.