GENERAL COMMITTEE MEETING AGENDA 17 FEBRUARY 2020
Stormwater Drainage
15. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property. The works must be
undertaken in accordance with a site specific Stormwater Management Plan
(SWMP), prepared by a suitably qualified person. The SWMP must include an onsite
infiltration system without the need for pumps.
16. The site specific SWMP must be approved as part of the subsequent Building Permit.
Easements
17. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
18. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
19. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
20. All works must be carried out in accordance with a Geotechnical Report (or part
thereof) prepared by a qualified person* and endorsed through the Building Permit.
*(Refer to Advisory Notes)
Earthworks and Retaining Walls
21. All earthworks must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
22. Where the development involves excavation or filling over, or adjacent to, drainage,
water supply or sewerage infrastructure, all access chamber surface levels must be
adjusted to provide a freeboard of 100mm above the finished ground surface level.
23. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
24. All earthworks must be undertaken in accordance with the recommendations of
report: “Site Investigation Data and Indicative Potential Acid Sulfate Soil Report”,
prepared by CSI Soil Testing Pty Ltd, dated 29/01/2020
Coastal Protection
25. Gates must not be installed along the eastern property boundary to gain direct
access to the beachfront.
26. External colours and finishes of the building must comprise of muted/environmental
tones that blend with the natural environment.
B. Find the following matters relevant to the assessment and sufficient reason to approve the
application:
1. The cantilevered design of the building results in no significant impact to the natural
coastal processes of the dunal system.
Page 6 of 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.