Skip to the record
Search everything, all in one place.

Council archive · source document

08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published] · 142008.383

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

o

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

Form 1 Development Application

 

Common details

 

 

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed [DAS Assessment Checklist if
required, and by one (1) or more ather completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.qov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of land 1. Street address: fnctuding house number, street name, suburb/ocality name & postcode) (if applicable)
All land the subject of the application, must be .
identified. However, a description of the land is not | P.O. Box 141 Tewantin, Queensland, 4565 |
required in relation to a mobile or temporary wae . . 7 .
Environmentally Relevant Activity (ERA). 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - Q2 applies if | ]
development is proposed within a water body or = = -
walecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be "
identified by a lot on plan description. These details [ Lot 115 MCH 839107 - Noosa Spit |
can be obtained from tile d ts of through thi Peenas
localgoennent 14, The above description is for: (tick applicable box)
However, if the land on which the development is - (i) the land on which the development is proposed; or
ed d have a tot on plan description (i.e. o a a : :
Ee etapa C1 (ii) the tand adjoining the water body or watercourse, within which the development is
watercourse) provide - proposed; or
{i) the tot on pian description for the oO on
agjoiningfadjacent tand; or (iii) the water body or watercourse.
{ii) GPS coordinates where there is no
adjoiningladjacent tand (eg. in Moreton Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
development is within a water body of watercourse. | NA | NA | NA
Advice for com - Q8 applies if i] i, ie ci . y ”
development is within a local government area 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
rng | (Noosa Counel |
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice fi leting Q3 - Q9 applies if p
Advice for completing Q9 - Q9 appties i i . i ‘tte) [i ,
developments on strategic portland ora strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) {if applicable)
port land tidal area, For more details refer to Guide 11 | NA ‘|
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
rw lncetcon ara ceniemayte | [State Land, Noosa Council as Trustee
11. Proposed use of the land: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for aquaculture in
ig
ponds with a total area of 7 ha for which wastes are released into waters etc).
| Construction of a Permanent Sandshifting Facility
Other applicable parts of Form 4 42. Other parts of Form 1 completed as part of this application: (eg. Part D, Part I, etc)
Part A must always be accompanied by ather | Part M
completed parts of Form 1. For information about
when a part of Form 1 may apply refer to Guide 1,
Applicant details 13. Applicant's name: 15. Contact person:
Clearly identify who is making the application. The | Noosa Council | | Doug Reynolds
applicant need not be the owner of the land. g y
When siqning and lodging this application 14. Contact number: 16. Facsimile number/e-mail address:
The applicant is responsible for ensuring the
information provided is correct. The assessment [ 07 5449 5255 | 07 5447 1062 |
manager, any referral agency & the Chief Executive
(where applicable) will rely on this information when | 17. Postal address:
id deciding the application. .
hike ang and deciding ine appicalion. [ P.O. Box 141 Tewantin, Queensland, 4565 |
e applicant is a company - a contact person
must be shown. 18. Signature: _ 19, Date:
25

 

 

 

 

 

 

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.