Council archive · source document
08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published] · 142008.383
INTEGRATED PLANNING ACT 1997
Land owner’s consent {if applicable)
Section 3.2.1{3} of the IPA prescribes that an
application must contain, or be supported by, the
written consent of the land ownerls, if the application
involves:
() a material change of use;
(i) reconfiguration of a lot;
{iti} work on land below high-water mark & not within a
canat as defined under the Coastal Protection and
Management Act 1995;08
iv) work on rail corridor land defined under the
Transport infrastructure Act 1994,
Section 3,8.1(2}(a) of the 1PA provides that
tandowner’s consent is nof required for a mobile or
temporary E
For more information refer to Guide 1.
20.
Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application:
Name
Signature Date
Resource entitlement (if applicable)
Section 3.2.1(5) of the IPA requires evidence of
resource entittement be given for applications that
involve a prescribed State resource.
Section 3.2.1(10)(a}{ii) of the IPA prescribes that an
application cannot be taken to be property made
without evidence of the resource entiftement
Advice for completing Q21 & 22
Refer to schedute 10 of the Integrated Planning
Regulation 1998 that prescribes the nature of evidence
required by the State in sappori of the lodging of this
development application.
21.
22.
Does this application involve a State resource prescribed under a regulation (other than involving
quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
CANO - goto a24 YES - go to Q22
This application is accompanied by evidence: (tick applicable box)
(A (i)_ of the allocation of, or entitlement to, the resource - attach evidence and go to 023(vi)
Ci (ii) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource - go
to Q23
D (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23
Advice for completing Q23 23. Evidence of the resource entitlement:
The information in (i) ~ (v) is mandatory if evid . . . . j: ‘
The format oO) Wis mandatory Hevderce’s | (jy Resource entitlement / authority details (vi) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . applicable)
application invotves any water or riverine quarry {ii) Name of delegated officer
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be (iii) Position of delegated officer
completed if the evidence Is time limited. [
(iv) Signature of delegated officer
(v) Date
(vi) _ date of evidence . =
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
This checklist does not apply if the application requires
the completion of Parts A and B of the Form only. It
must be completed for all other applications.
&] Yes
O NO - the assessment manager may refuse to accept this application on the
grounds that the application has not been properly made
Plans / drawings / reports
An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny ar public
notification to understand Ihe scope of the proposal
and any potential impact.
25.
Plans/drawings/reports accompanying this application:
Plan / Drawing / Report Number Title Date
. - Noosa Main Beach Permanent
{i) Environmental Management Plan Sand Recycling EMP 2008
Definitive Design Manual for
(i) Design Manual Noosa Beach Nourishment | sent. 2007
Permanent Sand Recycle
System
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's)
OATE
FEE (8) _ RECEIVED
RECENING OFFICER’S |
| REFERENCE ~—"
NAMEIS
NUMBERIS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.