Skip to the record
For the highest quality transcripts.

Council archive · source document

08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published] · 142008.383

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Land owner’s consent {if applicable)

Section 3.2.1{3} of the IPA prescribes that an
application must contain, or be supported by, the
written consent of the land ownerls, if the application
involves:

() a material change of use;

(i) reconfiguration of a lot;

{iti} work on land below high-water mark & not within a
canat as defined under the Coastal Protection and
Management Act 1995;08

iv) work on rail corridor land defined under the
Transport infrastructure Act 1994,

Section 3,8.1(2}(a) of the 1PA provides that

tandowner’s consent is nof required for a mobile or

temporary E

For more information refer to Guide 1.

 

20.

Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application:
Name

 

Signature Date

 

  

 

 

 

 

 

 

 

 

Resource entitlement (if applicable)
Section 3.2.1(5) of the IPA requires evidence of
resource entittement be given for applications that
involve a prescribed State resource.

Section 3.2.1(10)(a}{ii) of the IPA prescribes that an
application cannot be taken to be property made
without evidence of the resource entiftement
Advice for completing Q21 & 22

Refer to schedute 10 of the Integrated Planning
Regulation 1998 that prescribes the nature of evidence
required by the State in sappori of the lodging of this
development application.

21.

22.

Does this application involve a State resource prescribed under a regulation (other than involving
quarry material on State coastal land under the Coastal Protection and Management Act 1995)?

CANO - goto a24 YES - go to Q22

This application is accompanied by evidence: (tick applicable box)
(A (i)_ of the allocation of, or entitlement to, the resource - attach evidence and go to 023(vi)

Ci (ii) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource - go
to Q23

D (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23

 

 

 

 

 

 

 

 

 

Advice for completing Q23 23. Evidence of the resource entitlement:
The information in (i) ~ (v) is mandatory if evid . . . . j: ‘
The format oO) Wis mandatory Hevderce’s | (jy Resource entitlement / authority details (vi) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . applicable)
application invotves any water or riverine quarry {ii) Name of delegated officer
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be (iii) Position of delegated officer
completed if the evidence Is time limited. [
(iv) Signature of delegated officer
(v) Date
(vi) _ date of evidence . =
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?

This checklist does not apply if the application requires
the completion of Parts A and B of the Form only. It
must be completed for all other applications.

&] Yes

O NO - the assessment manager may refuse to accept this application on the
grounds that the application has not been properly made

 

Plans / drawings / reports

An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny ar public
notification to understand Ihe scope of the proposal
and any potential impact.

 

25.

Plans/drawings/reports accompanying this application:

 

 

Plan / Drawing / Report Number Title Date
. - Noosa Main Beach Permanent
{i) Environmental Management Plan Sand Recycling EMP 2008
Definitive Design Manual for
(i) Design Manual Noosa Beach Nourishment | sent. 2007

Permanent Sand Recycle
System

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (applicable to assessment manager's)

OATE

FEE (8) _ RECEIVED

RECENING OFFICER’S |

| REFERENCE ~—"
NAMEIS

NUMBERIS

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.