“There will be earthworks required to facilitate construction of stormwater treatment
facilities, sanitary drainage and allow for an aesthetically pleasing and functional built
form. There is little opportunity for fill material to be won on site therefore most of
the fill material will need to be imported”.
While the total amount of fill required does not seem to have been identified Figure 6
“illustrates the ‘swampy’ nature of the lower area of the site in the vicinity of the
proposed gabion wall” and states that “a fill wall of approximately 2.0m will be
required”.
I agree with the comment at page 10 of 13 in the Information Request “that the extent
of filling of the site may need to be reduced.”
COMMENT: The imported fill will all have to come in via Sandpiper Lane and on
the access road to the IGA and the other shops. It will therefore, directly and
significantly affect them and the Hardware store. This will involve considerable noise
and disruption from the source of the fill to the development and return. It will also
cause considerable disruption to the roundabout at the village and to the Peregian
Beach Hotel and other premises in that area.
COMMENT: The importation of fill will result in the creek, which seems to have
been ignored in the DA, being diverted to run through the Council Reserve.
5.2 Engineering Services Report – Page 7 in Response 2B
I query why water reticulation is proposed down the pedestrian access lane to the
Peregian Beach Sports Ground (Lot 75 on MCH839108) and a
Unity Water meter is proposed at the Peregian Beach Sports Ground boundary rather
than on the developers property.
I also query why Electricity supply will be provided by “installing underground
infrastructure down the Peregian Sports Reserve access strip” rather than through the
developers property.
I query the contribution the developer will be required to make, if any, to the
rectification of this pedestrian access and the extent of any delay in the lighting and
development of this pedestrian access, which is supposedly underway at present.
6. Traffic
The DA proposes Car parking & Visitor Car parking of 115 spaces in total
67 with the Houses & 37 with the Hotel/Motel
4 in the west of the centre of the ring road
4 on the south side of the ring road behind the IGA
3 outside the security gate of the Motel.
!5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PM Submission Object - Deidre Mooney MCU16/0153 & REC16/0041Related documentApplication case desk ↗
PM Submission Object - Deidre Mooney MCU16/0153 & REC16/0041Related documentApplication case desk ↗
About this file
- File size
- 165 KB (small file)
- File type
No other editions are linked here.