Attachment C - SCG Engineers Response

of 2

Page text shows just the words. Original shows the document exactly as it was published.

22 March 2021
SCG Ref: 31026(L1)


By email: nadinemartooconsulting.com


HRS Developments Pty Ltd
c/- Martoo Consulting Pty Ltd




Dear Sir/Madam

           Re: MCU21/0027 & OPW21/0047 ~ Lot 4 RP72986, 30 & 32 James Street, Noosaville


We refer to Noosa Council’s Information Request dated 9 March 2021 and respond to the engineering matters as
follows:-

Issue 3-5 - Stormwater

SCG Consulting Engineers drawing No: 31026-C1.RevA ‘Stormwater Relocation Plan’, provides details of the
works for the proposed relocation of Council’s stormwater infrastructure. We have amended our plans to show a
pipe long-section and a new 4m wide easement (copy attached).

With the survey information provided by Max Watterson & Associates dated July 2016 we can confirm the
proposed stormwater management plan detailed in SCG Drawing No. 31026-SW1.RevA will not cause any
worsening of existing stormwater conditions to the neighbouring properties or increased runoff into the road
reserve.

SCG Consulting Engineers drawing No: 31026-SW1.1 ‘Stormwater Management Plan’ does not make reference
to PVC kerb adaptors. Galvanised (RHS) kerb adaptors have been proposed as per Council requirements.

Issue 6 - Earthworks

The proposed works include filling of the site to satisfy the minimum habitable floor level of RL 2.70 AHD. We
have provided a typical retaining wall/fence detail, please refer to architectural plans for proposed fencing and
heights.
Log in to download the original file

Attachment C - SCG Engineers Response.pdf · 90 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 1 page

Page 2

Issue 8 – Acid Sulphate Soils

As the Civil and Structural Engineers for the project we can confirm a Geotechnical Engineer has been engaged
to conduct acid sulphate soils (ASS) investigation and an ASS Management Plan in the case ASS are
encountered. The current turnaround timeframes are greater than 6 weeks. We kindly ask Noosa Council if this
can be conditioned prior to conducting a pre-start meeting.


Yours faithfully




                                                                       Checked by
TOM HARRINGTON                                                         SEAN RICHARDSON– RPEQ 5835
For and on behalf of                                                   For and on behalf of
SCG CONSULTING ENGINEERS                                               SCG CONSULTING ENGINEERS



Enc SCG Consulting Engineers Drawings – 31026-CS1.1, OW1.1 thru OW7.1, SW1.1 & C1.1A




SCG Consulting Engineers                          Page 2 of 2                               SCG Ref: 31026(L1)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.