                                             Advisory note

                                             PSP24 – Effluent Disposal details
                                             requirements for the design and siting of
                                             effluent disposal systems where located
                                             outside a sewerage service area. Compliance
                                             with PSP24 will be considered as part of
                                             Council’s assessment of the plumbing and
                                             drainage application.


                                           S17.1 Components of the essential network
                                           infrastructure that are likely to fail or may result
                                           in contamination when inundated by flood
                                           water –
                                          a) comply with Table 13.12; or
                                          b) are designed and constructed to exclude water
O17 Essential network infrastructure      inundation or infiltration and resist hydrostatic and
(e.g. electricity, water supply,          hydrodynamic forces as a result of inundation.
sewerage and telecommunications)
maintains effective function during
and immediately after flood events.
Electricity supply infrastructure                                                                 Complies.

O18 Uses and works maintain a safe         S18.1 Building footprints are situated clear of        The proposed development allows for the safe
distance from electrical infrastructure    any power easements on-site;                           placement of building footprints with regard to
including substations, overhead
                                           AND                                                    electricity supply infrastructure. There are no existing
power lines, power poles and
                                                                                                  fenced electricity substations within 50m of the subject
transformers.                              S18.2 Building footprints are not less than 50m        site.
                                           from an existing fenced electricity substation.
14.190 Earthworks and stormwater management40
O19 Stormwater run-off is managed          No solution provided                                   Complies.
so as not to cause any adverse
impacts on the built or natural                                                                   The proposed development will incorporate stormwater
environment including changes in                                                                  run-off measures that do not cause adverse impacts on
quality, quantity or location of                                                                  the built of natural environment.
stormwater discharges.
Log in to download the original file

Planning Report 60669.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.