Monday, 3 April 2023

Our Ref: 22544
Your Ref: MCU22/0271


       NOOSA COUNCIL
       PO BOX 141
       TEWANTIN QLD 4565

       ATTENTION: Lisa Pienaar

Dear Lisa


GENERALLY IN ACCORDANCE REQUEST
DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE (COMMERICAL BUSINESS
TYPE 1 OFFICE, TYPE 2 MEDICAL & ANCILLARY DWELLING UNIT) AND
RECONFIGURATION OF A LOT

36 - 40 HOFMANN DRIVE, NOOSAVILLE
LOT 6 ON SP319209


Further to Councils minor change approval of 21 February 2023, more detailed building and
operational works design has been undertaken and which has required some adjustments to
plans. These adjustments have been necessary to provide for necessary site services and to
improve the functionality of the carpark layout. The carpark layout review has ensured compliance
with condition 25 which specifies the minimum parking spaces and design criteria. The carpark
layout review has enabled reduction in the number of tandem carparks and which is seen as a
beneficial outcome.

In this regard the updated plans are submitted for Councils generally in accordance review.

A summary of the generally in accordance changes are as follows:

Ground floor

Southern frontage landscape
• Electrical PMT has been relocated to Southern end of the site closer to the existing service
   connection.
• Footpath has been reconfigured and replaced with landscape.
• Carparking has been reconfigured to allow for access to PMT and provide additional car bays
   to front of site.

Northern frontage landscape
• Mobile generator pad has been removed and replaced with landscaping
• Original electrical PMT location and paths have been replaced with landscaping.
Log in to download the original file

22544_GIA Request.pdf · 429 KB (small file)

Full text of the other 1 page

Page 2

Internal Tenancy and Service areas
• Tenancy areas have been reviewed to better reflect tenant requirements. Some area
    adjustments have been undertaken while ensuring overall tenancy area remains same as
    current approval
• Service and mechanical plant areas have been reviewed.                  As a result of Health
    recommendations associated with the radiation bunker emissions, the service areas and bike
    store shown in the approved plan below the bunker have been relocated. The original waste
    loading dock area has been rationalised, with the services relocated to this area. In support of
    the design rationalisation an updated waste management plan is attached. This waste
    management plan confirms that the reconfigured bin store area is sufficient to accommodate
    the proposed use.

Driveway entrance
• Driveway entrance has been reconfigured to remove ramping.
• Driveway entrance has been reconfigured for to allow provisions for external service vehicle
    loading area.
• The designated loading bay is positioned adjacent to the bin store to facilitate waste collection.
    Waste collection vehicle manoeuvring is still achieved within the site.
• The car parking area off the driveway has been reconfigured to improve legibility The plans
    show swept paths for the blind aisle turning areas

Level 1

•   Open walkway connecting buildings has been moved further back into the site. A new
    landscape planter has been added to front of walkway.
•   Plans show proposed tenancy breakup.
•   The eastern row of tandem carparks have been removed and reconfigured as standard
    carparks at ground level and which allows windows to external walls of tenancy providing
    natural light.
•   Additional planting / planter beds added to L1 Carpark
•   Southern plant deck has been relocated within the existing roof providing better opportunities
    for screening.
•   Additional landscape planters created along walkway between buildings

The plans and development outcome remains consistent with the current approval and condition 2
for the development to generally comply with the approved plans.

Should you have any questions with respect to the above, please do not hesitate to contact me
direct.

Yours faithfully
PROJECT URBAN




Scott Sobey
DIRECTOR
Email: [email protected]

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.