Original source · versioned page text
Cover Letter
revision A prepared by SCG Consulting Engineers dated 30 November 2022. Condition 30 is imposed pursuant to s145 of the Planning Act 2016 lbeing non-trunk infrastructure. Applicable Works Codes These codes largely relate to the provision of services and infrastructure associated with the proposed development of the subject site. The site currently has access to an appropriate level of infrastructure. Driveways and Parking Code The purpose of the Driveways and parking code is to ensure driveways and parking are adequate to serve the access and parking needs of development are designed to protect the safety of pedestrians and cyclists. The proposed development meets the following overall outcomes sought for the Driveways and Parking Code: a) Car parking spaces and associated manoeuvring areas are designed to be safe and functional and meet the reasonable requirements of the particular land use. f) Driveways and parking areas provide safe and efficient pedestrian and cycle access. g) Access, parking, servicing and associated manoeuvring areas do not detract from the streetscape character and are designed to discourage crime and antisocial behaviour. h) Driveways and parking areas avoid adverse impacts on the environment and the amenity of the locality. The proposed vehicle access has been located and designed in accordance with the current Australian standards for parking facilities, including one footpath crossing. Furthermore, the proposal complies with the minimum car parking requirements for the intended use while maintaining the integrity of the streetscape. Earthworks Code The purpose of the Earthworks code is to ensure earthworks do not unreasonably impact on the natural environment or other properties and provide a safe and secure work environment. The proposed development meets the following overall outcomes sought for the Earthworks code are: a) Earthworks are designed and constructed to be structurally sound. b) All onsite works provide land stability (including differential settlement or expansion in reactive soils. c) Earthworks avoid contamination of land. d) Flooding and drainage are appropriately addressed. 4 PO Box 1818 07 S474 3873 s Noosa Heads adminergstrategic.com.au QLD 4567 rgstrategic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original