Council archive · source document
Response to information request REC13/0095
Very large file (46.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Lot 6 Culvert: Catchment A + B (see Plan 1225-25).
Catchment Area A =
1.755 ha
Q 1 00 rainfall event FCIA =
1/360 x 0.94 x 155 x 1.755 =
0.711 m3/s
Cross Road culvert, 1 X 900x300 RCBC with outlet control.
Maximum HW =
1 02.883(upstream side of dwy) -
1 02.364(RCBC invert) =
0.519m
ke=O.4, A =
0.908 x 0.305 =
0.277 sqm,L =
4.88m
de =
0.467(QlBi/3 =
OA67 X (OAI0.9i/3 =
0.272m
TW =
xsect D/S of2/C (see attached PCDrain Calculation sheet) = OA11m
(de + D)/2 =
(0.272+ 0.305)/2 =
0.288m
So ho is greater of 0.411 and 0.288 =
0.411m
HW =
H + ho -
LSo
0.519 =
H + 0.411 -
0.064
H =
0.172
From Figure 9A-5 DTMR Road Drainage Manual, Q =
OAO m3/s
Q 1 00 weir flow Q100 flow 0.711 m3/s -
0.40 m3/s piped
0.311 m3/s
Weir QIOO 1.7LH312 B =
3m
0.311 l.7 x 3 x H312
H (0.3111(1.7 x 3))2/3
0.155m
Adopt weir capacity for a 0100 of 0.711 m3/s with 3m width, 0.155m upstream depth H and
900x300 RCBC.
Note culvert more than adequate for Q5 without overtopping as Q5 =
0.34 m3/s vs culvert
capacity of 0.40 m3/s.
X:\JOBS\CT Projects in progrcss\l225 30 lots lake MacDonald Drive\CorrespondencelStage 2 Correspondence\property access,
2
flooding calcs.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to information request REC13/0095Related documentApplication case desk ↗
About this file
- File size
- 46.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.