Council archive · source document
Response to information request REC13/0095
Very large file (46.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Lot 5 Culvert: Catchment A + B (see Plan 1225-25).
Catchment Area A =
1.755 ha
Q 1 00 rainfall event FCIA =
1/360 x 0.94 x 155 x 1.755 0.711 m3/s
Cross Road culvert, 1 X 1200x300 RCBC with outlet control.
Maximum HW =
102.579(upstream side of dwy) -
102.1 04(RCBC invert) =
OA 75m
ke= OA, A =
1.212 x 0.305 =
0.370 sqm, L =
4.88m
de =
OA67(Q/Bi/3 =
OA67 X (OAll.2i/3 =
0.246m
TW =
xsect D/S of2/C (see attached PCDrain Calculation sheet) =
OAl1 m
(de + D)/2 =
(0.246+ 0.305)/2 =
0.276m
So 110 is greater ofOAl1 and 0.276 =
OAllm
HW =
H + 110 LSo
-
OA75 =
H + OAl1 -
0.069
H =
0.133
From Figure 9A-5 DTMR Road Drainage Manual, Q =
OA6 m3/s
Q 1 00 weir flow Q 1 00 flow 0.711 m3Is -
OA6 m3Is piped
0.251 m3/s
Weir QI00 1.7LH312 B =
4m
0.251 :::::
1.7 x 4 X .H312
H (0.251 I (1.7X 4))2/3
0.111m
Adopt weir capacity for a 0100 of 0.711 m3/s with 4m width, 0.111m upstream depth H and
900x300 RCBC.
Note culvert more than adequate for Q5 without overtopping as Q5 =
0.34 m3/s vs culvert
capacity of 0.46 m3/s.
X:VOBS\CT Projects in progress\l225 30 lots lake MacDonald Drive\Correspondence\Stage 2 Correspondence\property access,
3
flooding eales.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to information request REC13/0095Related documentApplication case desk ↗
About this file
- File size
- 46.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.