Council archive · source document
Response to information request REC13/0095
Very large file (46.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
"1 Callaghan & Toth Consulting Engineers Pty Ltd ABN No: 45140292324 8/41 Sunshine Beach Road NoosaJunction P.O Box 2305 Noosa Heads 4567 Callaghan & Toth www.callaghwlandtoth.com.au Ph: 07 5474 9081 Fax: 07 54749041 Civil, Environmental & Hydraulic Engineers ~ 10th September 2013 File No: 1225 Sunshine Coast Regional Council C/- Max Watterson and Associates Dear Sir/Madam, RE:" REC13/0095. One lot into 4 lots at 55 Lake Macdonald Drive Draft Conditions We are writing to respond to information request dated 24th July 1. Information Required. Attached are our OPW design plans 1225-17 to 30, which detail: a. Longitudinal sections of driveways on plan 21 b. Plans 19, 20 and 24 clearly show the extent of any necessary batters, banks, drainage structures and scour protection. c. Plans 20 and 24 clearly show the extent of any earthworks necessary to ensure that the overland flow is free draining. d. Plan 24 shows a typical cross-section at the culvert. All culverts have the same minimum cover. e. Plan 18 shows the proposed trees for removal as per the Arborist report, which is attached. 2. Information Required. Our Reconfiguration plans show the driveway edge to the lots to be 1.5 meters off the adjacent boundaries. During detail design, it was found that the driveways needed a 0.5 shoulder each side and 1 in 3 batters as well as headwalls and outlet scour protection. These details resulted in the driveway edge being increased to 2.5m from the boundary to give adequate separation. We do not agree with the concept of combining driveways to lots five and 6as in the past there arises issues as to where to put the fence and gates and who is responsible for fixing the shared driveway and pipe. Therefore, we submit our amended separated driveways as shown on plan 19,20,21 and 24 for consideration. 3. Information Required. We enclose a response from 8risbane Stormwater Management (8SM)to address this query and Plan 1225-198,which accurately represents the regional flood extent on site including lot 5 based on Council Flood model levels and survey contours over the site. Note that we also compared this to the Council flood extents on mymaps and found Council Q100 mapping is completely outside Lot 5. The adopted flood study for this area uses an average n value of 0.064 (n = 0.06 for bed, n= 0.03-0.05 for cleared flood plain). A small portion ofthe gully parallel to Wilgee Court fronting lots 5-7 has some existing Q100 inundation according to Plan 1225-198. X:\Jobs\CT Projects in progress\1225 30 lots lake MacDonald DrivelCorrespondencelSlage 2 CorrespondencelREC Info requesl response.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to information request REC13/0095Related documentApplication case desk ↗
About this file
- File size
- 46.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.