2506-46399 SRA_Response with conditions_MCU25-0059_OPW25-0080 · MCU25/0059

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                       2506-46399 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)


 No.     Conditions                                                                     Condition timing
 Development Permit – Operational work
 Schedule 10, Part 17, Division 3, Table 2, Item 1 — Tidal works or work in a coastal management
 district—The chief executive administering the Planning Act 2016 nominates the Director-General of
 the Department of Transport and Main Roads to be the enforcement authority for the development to
 which this development approval relates for the administration and enforcement of any matter relating
 to the following conditions:
 Approved plan
 1.      The development must be carried out generally in accordance with               At all times
         the following plan:
              Site plan and water allocation, prepared by Marine
                  Structures, dated 21 February 2025, drawing number MS-
                  05069-01, Revision D
              Layout plan, prepared by Marine Structures, dated 25
                  February 2025, drawing number MS-05069-02, Revision F
 Lighting
 2.      (a) Light/mark all vessels, structures, plant and equipment                    For the duration of
             associated with:                                                           works and for operation
                 i.   the works, in accordance with the following                       to be maintained at all
                                                                                        times
                     specifications:
                      any anchors deployed must be marked with yellow
                         buoys and fitted with FL yellow lights fitted
                      lighting provided must not obscure, disguise or
                         otherwise interfere with the effectiveness of
                         navigational lighting.
                 ii. operations, in accordance with the following
                     specifications:
                      section 3 of AS4282-1997 Control of the obtrusive
                         effects of outdoor lighting

         (b) Lighting provided must not obscure, disguise or otherwise
             interfere with the safe navigation of other vessels, including the
             effectiveness of navigational lighting.
 Protection of navigable waterways
 3.      The construction, operation and maintenance of the pontoon and any             For the duration of
         ship berthed, moored or attached to the structure, must not:                   works, and at all times
             (a) encroach into, pass over or under a navigation corridor
             (b) be located in a high-risk maritime zone
             (c) impede the safe navigation of other ships or boats
             (d) restrict safe access to or from neighbouring structures.
 4.      Remove and dispose of any debris or similar obstruction                        For the duration or
         encountered whilst undertaking the work at an appropriately licensed           works
         facility.
 5.      All piles and/or structure to be demolished both above and below the           Prior to the completion
         waterline must be completely extracted/removed.                                of the works



 State Assessment and Referral Agency                                                                     Page 4 of 8

Used in these records

About this file

File size
327 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2506-46399 SRA_Response with conditions_MCU25-0059_OPW25-0080.pdf · 327 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.