Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

2506-46399 SRA_Response with conditions_MCU25-0059_OPW25-0080 · MCU25/0059

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                                              2506-46399 SRA




Schedule 10, Part 17, Division 3, Table 1, Item 1 — Tidal works or work in a coastal management
district— The chief executive administering the Planning Act 2016 nominates the Director-General of
The Department of Environment, Tourism, Science and Innovation to be the enforcement authority for
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following conditions:
6.      The works must be carried out generally in accordance with the         For the duration of
        following plans:                                                       works and to be
              Site plan and water allocation, prepared by Marine              maintained
                Structures, dated 21 February 2025, drawing number MS-
                05069-01, Revision D
              Layout plan, prepared by Marine Structures, dated 25
                February 2025, drawing number MS-05069-02, Revision F
              Elevation, prepared by Marine Structures, dated 25 February
                2025, drawing number MS-05069-03, Revision F
7.      The works to which this approval relates are to be for a private       At all times
        purpose only.
8.      Any operator and contractor involved in the works to which this        During construction
        approval relates
        must:
        (a) be provided a copy of these referral agency conditions
        (b) install all measures, plant and equipment necessary to ensure
            compliance with the conditions of this approval
        (c) maintain such measures, plant and equipment in a proper and
            efficient condition
        (d) operate such measures, plant and equipment in a proper and
            efficient manner.
9.      For the proposed works only use materials which are free from          During construction
        contaminants as defined under section 11 of the Environmental
        Protection Act 1994.
10.     Should the works become damaged as a result of erosion, flooding       At all times
        or storm tide inundation, the registered landowner(s) of the subject
        land shall be responsible for the removal of all debris at their own
        expense.




State Assessment and Referral Agency                                                             Page 5 of 8

Used in these records

About this file

File size
327 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2506-46399 SRA_Response with conditions_MCU25-0059_OPW25-0080.pdf · 327 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.