NOOSA COUNCIL IDAS Development Application Decision Notice                                                 4 of 12


13.    The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
       Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating
       and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to
       comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not
       exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
       requirement.

14.    Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted,
       to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
       operational works. The cash bond or trading bank guarantee will be returned on performance of the
       conditions of approval less any costs incurred by Council in respect of enforcing performance of this
       permit.

15.    The requirements of this development approval are to be effected, prior to the use of the premises.
       Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
       compliance with conditions.

16.    The Development Permit for a material change of use of premises lapses if the use has not happened by
       11 October 2011, unless an application to extend the currency is approved by Council.
Building Services

Condition Survey
17.    A condition survey is to be carried out of adjoining buildings, structures and services prior to any
       demolition works or construction works taking place on site. If distress already exists, a photographic
       survey shall be undertaken, the distress measured and a plan to monitor changes to distress shall be
       implemented.
Demolition
18.    Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
       damage and made safe to the standard required by the regulatory authority;

19.    All infrastructure must be disconnected, capped or sealed including:-
              electricity meters removed and electrical wires disconnected; and

              telephone lines are disconnected; and

              high speed data cables and television provider boxes are disconnected and removed to the
              standard required by the regulatory authority;


20.    All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
       must be removed from the building and disposed of in accordance with industry best practice.

21.    Waste generated during construction must be stockpiled in a centralised location and covered as required
       to prevent material being blown onto adjoining properties including the road reserve or food waste from
       generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly
       or via an approved waste receptacle and collection service. Storage areas are to be located near the
       temporary access to the site so that access can be gained with out damage to infrastructure.

22.    Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the
       relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions.

23.    Sediment and erosion control measures must be placed on site prior to the works commencing and shall
       be maintained until all works are complete. The erosion and sediment control measures shall be in
       accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by
       Healthy Waterways (copy attached or available at www.healthywaterways.org).

24.    The transportation of all materials to and from the site must be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
       shall be covered to prevent materials including dust being windblown from the vehicle.

25.    A Waste Management Plan shall be submitted for the demolition to the Environmental Health Section of
       Noosa Council, prior to the development permit for building works being issued. The Plan shall contain the
       following information:-




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc082f7a\@[email protected]

Used in these records

About this file

File size
56 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2005.00000813.001 [As Published].pdf · 56 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.