NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 12
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated volume (m³) On-site *specify Off-site *specify *Specify contractor
materials proposed reuse or contractor & & landfill site
onsite recycling recycling outlet
methods
Excavation material
Green waste
Bricks
Concrete
Timber – please
specify
Plasterboard
Metals – please
specify
Asbestos
Other – please
specify
NOTE: Details of site area to be used for onsite separation, treatment and storage (including weather
protection) shall be provided on the plan drawings accompanying your application.
Site Stability
26. Building works shall be undertaken in accordance with conditions and recommendations of the report
titled “GEOTECHNICAL ASSESSMENT OF SITE STABILITY 28 BRYAN STREET, SUNSHINE BEACH”
from Soil Surveys Engineering Pty Ltd Reference Number 3-2423 BR sg 2006-07-17 (Job Number 306-
2423), and the further recommendations contained in the review of the Geotechnical report by Coffey
Geotechnics – dated 18 September 2006 (reference GEOTNATH20028-AA, copy attached herewith and
also available on request).
27. There is to be no uncontrolled discharge of water onto the slope.
28. Additional load due to fill, construction equipment or stockpiled materials should not be located on the
dune slope.
29. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use
of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating,
earthmoving or demolition machinery or other similar construction techniques.
30. Boundary wall movement shall be monitored throughout construction by a RPEQ and if movement occurs
construction is to be stopped immediately and appropriate action is to be taken to arrest the movement.
Further work shall only take place after a re-assessment of the conditions on site.
31. An RPEQ is to be engaged by the client to oversee any piling works.
32. The applicant’s Geotechnical Engineer shall supervise the demolition of the existing buildings and the
excavation and construction of the proposed development to ensure that the works are carried out in
accordance with the recommendations of the abovementioned reports in order to protect the stability of
adjoining buildings and/or structures and/or land.
33. The Geotechnical Engineer will be required to be on site for the whole of the time during any excavation.
The construction of the whole of the foundations is to be supervised and directed on site by a consulting
Geotechnical engineer. No work of any kind relating to the foundations shall be carried out if he is not on
the site and supervising and directing this work. Such works shall only be carried out during dry weather
conditions and if there is a risk of sand movement occurring, all work shall be suspended until such steps,
approved by the applicant’s Geotechnical engineer and the Council’s Building Surveyor, have been taken
to ensure that no further slippage will result.
Land Development
Vehicle Access
34. A vehicular access driveway to serve the development shall be constructed from the Bryan Street frontage
of the site with a maximum width of 3.5m.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc082f7a\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2005.00000813.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.