Decision Notice - 010.2005.00000813.001 [As Published] · 132005.813

of 12

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     7 of 12


       The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
       system at any one location is 25 litres/second.
49.    All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
50.    The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
       accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
51.    The site shall be connected to Council’s existing town water supply and be constructed in accordance with
       Council’s standards and requirements at no cost to Council.

52.    Each individual water connection to the water reticulation system shall extend to the property boundary
       and be metered. All fees for the supply of water meters shall be paid to the Council.

53.    All water meters must be located outside the property boundary and in an easily assessable location to
       facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
       fences or locked gates. In this regard approval of the water meter configuration and location must be
       obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
       hydraulic drawings.

54.    For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall be
       served by:

       54.1. A single Body Corporate water meter to measure the total water consumption (including fire hose
             reels, but excluding fire hydrants and fire sprinkler systems), and

       54.2. Individual water meters to each tenement capable of being separately rated, and

       54.3. A fire service (fully testable single detector check with metered bypass), where applicable, for flows
             to fire hydrants and fire sprinkler systems (excluding fire hose reels).

55.    The proposed access driveway shall not adversely affect the water main or hydrant located in the Bryan
       Street frontage of the property. Should the location of the hydrant conflict with the access driveway the
       hydrant shall be:

       55.1. relocated clear of the access driveway and associated batters or banks, or

       55.2. modified to match the proposed driveway. The modifications shall include, but not be limited to,
             resetting the lid and extending the spindle.
      Council shall carry out all works relating to the relocation to, or modification of, the existing hydrant and
      water mains at the applicant’s cost.
Earthworks
56.    Earthworks required on site shall be carried out in accordance with Council’s Planning Scheme Policy
       PSP5 – Engineering Design Standards, so as not to cause the additional ponding of water on any
       adjoining lands or the blockage of, or interference with, any natural watercourses.

57.    Earthworks carried out on site shall not affect the structural integrity of any of the existing fences and/or
       buildings and/or structures and/or lands that border the development site. Fences that are affected shall
       be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences
       to be replaced shall be clearly shown on the plans submitted for Operational Works approval.
Erosion and Sediment Control
58.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
       control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
       waste, will be necessary.
       In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
       to the Council for approval prior to obtaining a Development Permit for Operational Works.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc082f7a\@[email protected]

Used in these records

About this file

File size
56 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2005.00000813.001 [As Published].pdf · 56 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.