Response to Information Request - Received on 19/04/2012 · OPW11/0335

of 122

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (89.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

                                                                                                              SCRC CORRESPONDENCE



TODCONSULTING                                                                                               1 "1 1 1 1 I~I’1 1 1"’11 1 1 1 1 1 1 1 1 1 1 1
civil &. structural engineers                                                                                           80475521

                                                                                                                                                             @)
TOO CONSULTING PTY LTO                 DIRECTORS                                              20 Mary Street Noosaville QLD 4566
ABN 39 128 805 336                    S Prystupa B.E., M.I.E.Aust C.P.Eng, R.P.E.Q.           PO Box 61 Noosaville QLD 4566
                                      C Dowding B.E., M.I.E.Aust R.P.E.Q.                     P 07 5449 9600
                                       D Reynolds B.E., M.I.P.W.E.Aust. R.P.E.Q.              F 07 5449 9494
                                                                                              E [email protected]
                                                                                              www.todconsulting.com
           DR:AS 10525-6
          YOUR REF: ML011 :MWL:OPW11/0335
          27 January 2012


          The Chief Executive Officer
          Sunshine Coast Council
           Locked Bag 72
          SCMC QLD 4560                               ATTENTION: Mark Lewis


          Dear Sir


          RE:     INFORMATION REQUEST OPW 11/0335                             -




                  ESSENCE OF PEREGIAN


          Further to our letter dated 27 January 2012 please find attached 3 copies of
          following information documentation for your review:-

          .   Updated and amended Stormwater Management Plan (SWMP)prepared by
              Simmonds & Bristow dated March 2012 including Acid Sulphate Soil
              assessment by Butler Partners Pty Ltd


          .   Spice Consulting Hydraulic drawings 964-0P1 H, OP2H, OP4E amended to
              be consistent with SWMP


             Tod Consulting drawings 10525               -
                                                             C1 F, C2H, C3J, C4H, C5F, C6F, C7F, C8B
              amended       to   be   consistent with         both    Simmonds & Bristow                    and           Spice
              Consulting documentation

          .   Copy of correspondence from Butler Partners Pty Ltd clarifying Acid Sulphate
             Soil Assessment


          We look forward to receiving a Development Permit for Operational Works for the
          Essence of Peregian project in due course.


          Please do not hesitate to contact the writer should you require any further
          information.


                                                                                          II~O               Mr
                                                                          I   Box:   "JJ:,.I.~~". R:   "..;..I.Q"""".\
            o G REYNOLDS
          TOO CONSULTING




             buildings I bridges I mining & civil I roads I subdivisions I structural renewal I urban street scapes
Full text of sections 2 to 50 (of 122)

Section 2

                                                                                              Butler Partners Ply LId
                                                                                                      ABN 14 8’~ 5 4 866

                                                                                                   79 Doggett Street
                                                                                        Newstead, Queensland 4006
                                                                                                     P.O. Box 2267
                                                                                                Fortitude Valley BC
                                                                                                  Queensland 4006

Project No. 007-160A                                                                    www.butlerpartners.com.au

                                                                                                 Ph: 61 7 3852 3800
12 July 2010                                                                                      Fx: 61 7 3852 3808
                                                                                    [email protected]



Matrix Pty Ltd
PO Box 3220
LOGANHOLME OLD 4129


Email:        [email protected]

Attention:    Mr C Sloan




Dear Clint




RE:          ACID SULFATE SOILS
             ESSENCE OF PEREGIAN
             215   -   219 DAVID LOW WAY, PEREGIAN BEACH


1.0 INTRODUCTION


Butler Partners has carried out an Acid Sulfate Soil (ASS)assessment at the site and the results of the
assessment are detailed in the following report:


         Acid Sulfate Soil Assessment
         Residential Development
         215   -
                   219 David Low Way, Peregian Beach

         Project No: 07160           Dated: 18 June 2007


The ASS assessment comprised the drilling and sampling of six bores with samples taken for laboratory
testing. The subsurface conditions encountered in the bores generally comprised a surface layer of either fill
material, that varied up to a maximum depth of 0.8m, or silty sand to a maximum depth of O.4m. In two
bores drilled in the lower lying, western part of the site, the fill was underlain by natural, dark grey-brown silty

clays that were underlain in turn by silty sands that were indurated below 2m depth. In the eastern part of
the site, where the majority of the development is understood to be proposed, the surface fill or silty sand
layer was underlain by sands.

The results of the laboratory testing indicated that, in general, the fill material and natural sands and silty
sands were not ASS.          The natural silty clays indicated levels of actual acidity below laboratory reporting
limits, with one exception from a bore at the western edge of the proposed development area. The silty
clays were therefore considered to include an apparently limited amount of ASS, potentially at isolated
locations.




                                                                                                   W;&~
                                                                                              CONSULT AUSTRALIA

                                                                                                   ~
                                                                                                   Member F rm

Section 3

        Essence of Peregian
        215   219 David Low Way, Peregian Beach
              -




        Project No.: 007-160A
        12 July 2010




        2.0 PROPOSED EARTHWORKS


        It is understood from Matrix      Pty Ltd that site earthworks will comprise cut and fill but will not include
        excavation below 5mAHD and will not include excavation within the area where one sample, indicating the

        possible presence of some very low level ASS, was encountered. It is also understood that the currently
        proposed footings are displacement piles (e.g. steel screw piles or driven timber piles) and disturbance of
        ASS, if/where they exist is not proposed.

        3.0 ASS RISK


        Based on the results of the ASS assessment (which indicated that low levels of ASS were present in only

                 samples tested) and the proposed earthworks (which, it is understood from Matrix, do not propose
        one of the

       any excavation or disturbance of soils below 5mAHD), it is considered that the risk of adverse effects from
       ASS presence at the site (for the currently proposed development) is very low.




        If you require any additional information, or if we can be of any further assistance, please do not hesitate to
        contact us.




       Yours faithfully
        BUTLER PARTNERS PTY LTD


        MIKE NEIGHBOUR
        Principal




butlerpartners.com.au                                                                                           Page 2

Section 4

           ~
41   ..,




                   Simmonds & Bristow
                   Established 1965         ACN 010252418   Pty Ltd




                   ESSENCE OF PEREGIAN


                 Stormwater Management Plan


               Sediment and Erosion Control Plan




                                 Prepared for

                        Scanlon Property Group Pty Ltd




                                March 2012

Section 5

                                                                                                                                                                                  ..
                                                                                                                                                                                       .




Document Control




 ID~l~T,~[ld~,"~,~~ist~~
Originating Office:
40 Reginald Street                                             PO Box 3160                                                                    Ph: 07 3710 9100
Rocklea, Qld 4106                                              Yeronga, Qld 4104                                                              Fax: 07 3710 9199

Job Ref Number                      1108-155C

Document Number                     1108-155Cf-02

Client                              Scanlon Property Group Pty Ltd

Client Contact                      Tony Scanlon


                                    Name                                                                      Signed                                                    Date

                                    Terrence Allen BE(Chem)
Written by:                                                                                                    -7.-.--;0;----
                                                                                                               .




                                                                                                                 ~\                      ",,_;..:.--
                                                                                                                                                                        26/03/2012
                                                                                                                                 .....
                                                                                                                               ,,’
                                                                                                                        ....
                                                                                                                   ..




                                    David             BristQw
                                                      I

                                    IEAust, CPENG, RPEQ,
                                                                                       f3E(Ghem),
                                                                                    1A1M.
                                                                                                              c/7i
Reviewed by:
                                                          .




                                                          ’"
                                                                        \
                                                                        \
                                                                                                         ".

                                                                                                              tfY/                                     ~                26/03/2012


                                                           \                "’...
                                                                                ....
                                                               ......               ...

ReVlslon H.
          IStory                                                                           "




Rev No.              Date             Author                       Page(s) \                              Description I Revision                                          Status
    00           14/12/2010          GE&AH                                     ,                     pdate to SWMP & SCEP                                               Superseded
    01           07/09/2011          TA&GE                                             1            S~age 1 Update to SWMP & SCEP                                       Superseded
                                                                                       ,

                                                                                                     ’ Revision of
    02           09/12/2011              TA                                            J                           Stage 1 SWM P &                                      Superseded
                                                                               J                    .,
                                                                                                                                     SCEP
    03           13/01/2012              TA                             ~                      r_
                                                                                                         ~Revision of SCEP & SWMP                                       Superseded
                                                                        -




                                                                                                           following Experts Report
                                                                        ~           -


    04           09/03/2012              TA                                                               Revision following Council                                    Current
                                                                                                                            Feedback




Disclaimer
The information contained in this document has been prepared specifically for our client named
above and as such its use is limited to the above project. Simmonds and Bristow accept no
responsibility to any third party who may use or rely upon this document or the information
contained within.


Whilst S&B have made every effort to ensure the accuracy of the information contained within
this document it may include typographical errors and may be changed or updated without
notice.

@2010 Simmonds and Bristow          Pty Ltd All Rights Reserved. Copyright in the whole and part of this document
belongs to Simmonds and Bristow Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or
in part without the prior written consent of Simmonds and Bristow pty Ltd.




@2012 Simmonds & Bristow Pty Ltd                                   Contrast Constructions                                                              11 08-155C   26 March 2012
                                                                                                                                                                    -




1:ICLlENTFILESIContrast Constructionsl1108-155c   -
                                                          Essence of                Peregian SCEP Stage                 1        Updatel09_Output DocumentsI1108-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321.doc

Section 6

.




                                                            EXECUTIVE SUMMARY


    Simmonds and Bristow were commissioned by the Scanlon Property Group Pty Ltd to develop
    a   Stormwater Management Plan (SWMP)and Sediment Erosion Control Plan (SECP)for the
    proposed Essence of Peregian development.

    The SECP assessed the erosion hazard and risk based                                                                  on          the soil and   topography of the
    development site.            The SECP provides information how to manage the erosion and off-site
    export of soil from the development site, and a statement of the personnel responsible for
    establishing and maintaining all erosion and sediment control measures.

    The SWMP described the management of stormwater from the developed site and         upslope
    sources  beyond the development area. The SWMP provided pre-development measurements
    of water quality and soil parameters from the proposed development area, and computer model
    outputs (MUSIC 4) that demonstrate compliance of the design stormwater quality with required
    guideline standards. These standards were agreed at the Joint Experts Conference, and are
    consistent with loads reductions required by the Queensland Water Quality Guidelines (DERM
    2009).

    Plans that describe the stormwater treatment train (Appendix A) and outputs from computer
    modelling used to support the stormwater design (Appendix B) are appended. These plans
    show the proposed site layout, the location of bioretention trenches, building areas, plumbing
    layout, and the structure of bioretention trenches within the development area.

    Procedures for maintaining stormwater treatment units                                                          (Appendix D) and implementing the
    Sediment And Erosion Control Plan  (Appenaix C; Appendix E) are enclosed with this plan.
    These procedures describe how to control erosion, and miqjmise off-site exports of sediment
    and     nutrients from the            proposed development                                  area,                during            the construction         and   post-
    construction phases. A plan for monitoring water quality to demonstrate compliance with water
                                                                                                                                        .




    quality objectives is included.
                                                                                                                               ,Ii

                                                                    ...rr    ~

                                                                                                      ...;~


                                                                     -"Or,   {~’\_"    ~.N
                                                                                      :"   1
                                                                                                      ..to-   Jtf;~I;.: t:~    "~
                                                                   "
                                                                                               !;:" .’-:;,. -’-’~: (""t..:"_




    @2012 Simmonds & Bristow Pty LId                             Contrast Constructions                                                        11 08-155C   22 March 2012
                                                                                                                                                            -




    1:ICLlENTFILESIContrast Constructionsl110B-155c   -
                                                          Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI110B-155C_SWMP
    SCEMP_Scanlon Property Group_V4 O_ta_120321.doc

Section 7

                                                                                                                                                                   .




                               Contrast Constructions                          -   Scanlon Property Group
                                                             Essence of Peregian
                                                Stormwater Management Plan
                                            Sediment and Erosion Control Plan


                                                              Table of Contents


1.0         INTRODUCTION              .............................................................................................................
                                                                                                                                                              1

2.0         SITE LOCATION.............................................................................................................2

3.0         LOCAL ENVIRONMENT ................................................................................................3

  3.1       Site Features.....        ............................................................
                                                                                                        ...........................................
                                                                                                                                                      .......3

4.0         RECEIVING WATER QUALITY......................................................................................5

5.0         SOILS INFORMATION ...................................................................................................6

6.0         STORMWATER MANAGEMENT PLAN ........................................................................8

  6.1       Management of Stormwater..                       ................................................................
                                                                                                                                     ..........................9

    6.1.1         Roof Water capture ..................................................................................................9

    6.1.2         Vegetated Buffers..................................................................................................... 9
    6.1.3   Bio-retention Trenches .............................................................................................9

   6.1.4
                                       """-1
                                                   r "-f_\1 --;- ~’, :.’~
            Existing Heath Wetland ......!............:......:,...
                                                                           ~-,            -
                                                                                                 i:
                                                                                                 ~.
                                                                                                            ’’L
                                                                               .~:............................................ 10
                                                         ,

                                           \       L._,::_’:.,.~._.. _:J       ~,~,
  6.2   Proposed Treatment Train ........................................:.:........:........................................10
                                                                    ,
                                                                                                        ’

                                                                                                                   n:.



    6.2.1         Stage 1      -
                                  Southern Section (Only).........................!..~                       .
                                                                                                                     ’.......................................10
                                                                                                       j,
                                                                                                                      ........................................10
    6.2.2         Stage 2 &        3.......................................................:;,(::~.
  6.3       Modelling of the Stormwater Treatment Train ............>.-.>....~,....................................... 11
                                                                                                             .
                                                                                                                         ’




                                                                                                                         ,




    6.3.1         Existing Development................................................L.:..~..................................... 11
                                                                            ...,    I                             :’

    6.3.2         Stage 1 Modelling......................)..                        ’.................).:"...,.;.....................................11
                                                                                                       ....’             r
                                                                        i
    6.3.3         Full DevelopmenLModelling ....::..::.......................:.;.......’:.......................................12

7.0         LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES ....13

8.0         SEDIMENT AND EROSION CONTROL PLAN............................................................14

9.0         INSTALLATION SEQUENCE.......................................................................................16

10.0        ENVIRONMENTAL IMPACT ASSESSMENT ..............................................................17

11.0        MONITORING AND EVALUATION OF WATER QUALITY AGAINST TARGETS......19

  11.1      Water Quality Monitoring During Construction...                                   .......................................................
                                                                                                                                                       ....20

  11.2      Water Quality Monitoring During Routine Operation of the Essence of Peregian                                                                ...21
                                                                                                                                                   ......




12.0        CONDITIONS AND LIMITATIONS ...............................................................................22

13.0        COMPLIANCE CERTIFICATE .....................................................................................23

14.0        REFERENCES..............................................................................................................24




@2012 Simmonds & Bristow Pty Ltd                                Contrast Constructions                                           11 08-155C   -22 March 2012
I :ICLlENTFILESIContrast Constructionsl11 OB-155c   -
                                                        Essence of Peregian SCEP Stage 1 Updatel09            _
                                                                                                                  Output Documentsl11 OB-155C_SWMP
SCEMP_Scanlon Property Group_V40_ta_120321.doc

Section 8

r


    .




                                                                         APPENDICES


        APPENDIX A               LAYOUT DRAWINGS
        APPENDIX 8               MUSIC MODELLING
        APPENDIX C               SEDIMENT AND EROSION CONTROL PLAN DAILY CHECKLIST
        APPENDIX 0               LONG TERM MAINTENANCE OF STORMWATER MANAGEMETN
                                 FACILITIES
        APPENDIX E               SEDIMENT AND EROSION MANAGAEMENT PLAN
        APPENDIX F               SOIL AND WATER QUALITY SAMPLING MAP
        APPENDIX G               ACID SULPHATE SOIL MANAGEMENT PLAN


                                                                    TABLE OF FIGURES



        Figure 1: General Location of the Proposed Development ...................................................................2


                                                                       LIST OF TABLES



        Table 3-1: Water Quality Design Objectives for Loads Reductions ......................................................3

        Table 4-1: Water Quality Measured in the Heath Wetland of the Existing Caravan Park Site.............5

        Table 5-1: The Quality of Su                 ace Soil Measured in the                Undeveloped Site ..........................................6
        Table 5-2: The Quality of Su                 ace   Soil Measured ’in the Undeveloped Site ..........................................7
        Table 6-1: Drawing List........................~......................................................................................................8

        Table 6-2: MUSIC Model Results                    -
                                                              Undeveloped Site.............................:............................................. 11
        Table 6-3: MUSIC Model Results                    -
                                                              Stage 1 Site..................................................................................... 12
        Table 6-4: MUSIC Model Results                    -
                                                              Fully Developed Site...................................................................... 12
        Table 7-1: Management Actions of the Essence’of Peregian Stormwater Management Plan                                                            .........
                                                                                                                                                                    13

        Table 8-1: Factors Contributing to Erosion Hazard..................................~........................................... 14

        Table 8-2: Sediment and Erosi n Control for Construction of the Essence of Peregian.................15
                                                                                                   ,   ’.;.



        Table 9-1: Installation Sequence for the Essence of Peregian Development.................................... 16

        Table 10-1: Site Details ofthe Essence of Peregian Development.....................................................17

        Table 10-2: Dimensions of Rainwater Tanks and WSUD Deemed to Comply Solutions.................. 18

        Table 11-1: Summary of Test Methods for Ambient Su                                    ace Waters        .................................................
                                                                                                                                                                    19

        Table 11-2: Location of Water Quality Monitoring at the Essence of Peregian Site                                               .........................
                                                                                                                                                                    20

        Table 11-3: Monitoring Schedule for the Construction and Operational Development.................... 21




        @2012 Simmonds & Bristow Pty LId                                Contrast Constructions                                   11 08-155C     _
                                                                                                                                                    22 March 2012
        1:ICLlENTFILESIContrast Constructionsl1108-155c    -
                                                               Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI1108-155C_SWMP
        SCEMP_Scanlon Property Group_V4 O_ta_120321 ,doc

Section 9

                                                                                                                                                  ~

                                                                                                                                              .




1.0         INTRODUCTION


Simmonds and Bristow have been commissioned by Contrast Constructions and the Scanlon
Property Group Pty Ltd to develop a Stormwater Management Plan (SWMP)and Sediment &
Erosion Control Plan (SECP)for their re-development of the Peregian Caravan Park as the
Essence of Peregian.


The plans describe two development phases; the construction                                        phase when building activity
disturbs the ground surface, which is described by the SECP, and the maintenance phase when
the development is fully built and                        operational is described by the SWMP.                      In addition, the
development will be constructed in three construction stages, with the stormwater infrastructure
being installed in two stages. A portion installed at ’Stage l’ to reflect the reduced development
installed at that stage, with the remainder of the stormwater management infrastructure installed
during stage 2 construction (for stages 2 and 3).

The intent of the plans is to protect the environmental values of receiving waters by minimising
the hydraulic disturbance and the load of contaminants in run-off from the development site.


The SECP develops an erosion hazard and risk assessment based on the soil and topography
of the development site.    This plan identifies the environmental values of the receiving water
body, and any potential consequences~that erosion of the development site might have on the
receiving water body. The SECP tncludes irlformation on how to manage the erosion and off-
site export of soil from the            deveIOPtnent\site,            I
                                                and a statement of the personnel responsible for
establishing and maintaining all erosion ahd sediment control measures.

The SWMP describes a treatment                             train,deSign to manage stormwater from the site, which
includes overland flow               across        the site from           upslope     sources.       The SWMP is based                  on

assessments and MUSIC computer modelling of likely changes to annual stormwater sediment
and nutrient loads from the proposed                           development. The plan also provides information on
managing the stormwater treatment train, and a statement of the personnel responsible for this
management.

The plans are prepared in accordance with the Queensland Best Practice Environmental
Management Guidelines 2009. References were also made to other guidelines:

           .  Introductory Erosion and Sediment Control Guidelines for Queensland Councils;
           .  IECA Best Practice Sediment and Erosion Control;
           .  Erosion & Sediment Control: A decade of lessons learnt; and
           .
              Controlling stormwater pollution on your building site.

This report directly follows from the conceptual SWMP and SECP report (J-0906-226: Essence
of Peregian: Stormwater Management Plan; Sediment and Erosion Control Pian). The
conceptual SWP was modified by removing some, and modifying others, of the process units
from the stormwater treatment train as follows:


           .
              Converting swales to hydraulic conduits and changing roof areas;
           .
              Vegetation in the bio-retention trenches changed from wetland plants to grass;
           .  Consolidation of Northern and Mid section bio-retention trenches
           .  Removal of the constructed wetlands.


The outcome was that suitable water quality could still be achieved with the modified treatment
system.




@2012 Simmonds & Bristow Pty Ltd                              Contrast Constructions                          J-1005-310   -
                                                                                                                               22 March 2012
1:ICLlENTFILESIContrast Constructionsl11 08.155c   -
                                                       Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl11 08-155C SWMP
                                                                                                                           _




SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                  Page 1 of 24

Section 10

.




    This report develops from the earlier conceptual report (J-0906-226) by adjusting maintenance
    procedures to address the indicated changes. This report describes the SWMP, SECP,
    Environmental Impact Assessment based on model results, and a water quality monitoring
    program. This report also retains information presented in the conceptual report (J-0906-226)
    about the site location, local environment, site features, overland flows, and soils.




    2.0              SITE LOCATION


    The development will be called "Essence of Peregian", and will be sited on Lots 8, 9 and 10 on
    P 9315 and Lot 76 on MCH 2969, Parish of Weyba, County of March                                                                                                                                                                                  (Figure 1).                       These
    allotments are collectively located at 215-219 David Low Way, Peregian Beach, with vehicle
                     being from an unnamed road that runs off David Low Way. The site is 23,131
    access to the site

    m2 in        area.  development proposal is for 2 accommodation buildings containing 32
                                                      The
    Apartments, plus  30  beach shacks, and a commercial building containing, a retail/restaurant
    area on ground level and an accommodation module on Level 1.


                                                                                                                                                              0
                                                Noosa Online Maps                             Powered by Maplnfo@                                       ,.,-" 1"~~"""’1 -N. ’. U:lnfitf’o. M ~":              by l\1aplnfo@
                                                                                                                                                                                                                                              ~’~d’
                                                                                          -
                                                                                                                                                                                                                                                           .

                                                                                                                                                                                                .’



                                                                                                                                                        ~3~11S ",T"           8  .
                                                                                                                                                                                   J’_ --\’>", _v.. 2r ~ -1
                                                                                                                                                                                           ..               ’.


                                                                                                                                                                                                            r
                                                                                                                                                                                                                                                                            ’


                                                                                  1I005a                                                                -

                                                                                                                                                                 ’T’           6     i3
                                                                                                                                                                                                       2y.  ’$
                                                                                                                                                                                                                         ;zro3\.’2S....’..,9.
                                            Jewantln
                                                              oosaville
                                                                             0
                                                                                  Heads
                                                                                                                                                        ~’302
                                                                                                                                                        _.  -.        .~.3
                                                                                                                                                                         i
                                                                                                                                                                           ’ 1 .
                                                                                                                                                                          ~s"’;;i
                                                                                                                                                                         401,"
                                                                                                                                                                                     .’"

                                                                                                                                                                                             - 1 .
                                                                                                                                                                                 S.7.’.5 . ,12:10~,<:6.J4,.
                                                                                                                                                                                          -:.. ’<l
                                                                                                                                                                                                   ~..  -




                                                                                                                                                                                                        .
                                                                                                                                                                                                                 2           ’2 ’.Ct,!.’,
                                                                                                                                                                                                                                 <
                                                                                                                                                                                                                                             .
                                                                                                                                                                                                                                                      .
                                                                                                                                                                                                                                                          \ l -’

                                                                                                                                                                                                                                                                  M’
                                                                                                                                                                                                                                                               llJ:,,\
                                                                                                                                                                                                                                                                            I

                                                                                                                                                                                                                                                                                                ’




                                                                                       o Sunshine Beach
                                                                                                                                                                 ItS’jtl  ~21’11;;71$;iJli9 ~.7"~~~5"
                                                                                                                                                                                             2i~~~  i                                                          J:\3Si \
      eerwah                                                                                                                                                                         .          -
                                                                                                                                                                                                    -




                                                                                                                                                                                                                                             ~48               :’.~
                                                                                       OSunrise B~ach                                                                                                "                               <’
                                                                                                                                                                                                                                              ’24$<             ~3-:; \
                                                                                                                                                                                                        ~~ ~1 2S’tW\12~08& .;:: II                                      .




                                                                                                                                                                                                         >:,     ,
                                                                                                                                                                                                                             f.’"                ’2~V            ,so
                                                                                     OCastaways Beach                          ;     l’
                                                                                                                                                                                           4
                                                                                                                                                                                                            _.
                                                                                                                                                                                                                 !
                                                                                                                                                                                                                                 247~            >
                                                                                                                                                                                                                                                   -".,’        ..~1 I
                                                                                                                                                  i,’
                                                                                                                                                                                                                                 ’Z4S’                     ’.4,t’;l!
                                                                                                                                                                                                                                                            ’.I-’
                                                                                     O"’,,’cus Beach                                                                                                             ~
                                                                                                                                                                                                                                 ;Z43J
                                                                                                                                                                                                            ,! 11 ?4t:
                                                                                                                                                                                                            I
                                                                                                                                                                                                                 t-.m~~~
                                                                                                                                                                                                                 !
                                                                                                                                                                                                                     13          ’23’31
                                                                                                                                                                                                                             f’Pj                    224.                       .



                                                                                 o
                                                                                                                                                                                                                                                     ~t.J"..’ ~ r
                                                                                                                                             _.’
                                                                                                                                    <<
           ’fo:.~x                                                                   Peregi.n Beach                                                                                                                          "           ,




                                                                                                                                                                                                    215                  .1221’ Ii:2 ;,"-r..:"’~ ~ ..J.~
                                                                                                                                                                                                                         ,
                                                                                                                                                                                                                                     ,       EjUi4 I’Y~ JIf~                              ’y’:::
                                                                                                                                         ’17                                                                             ~f9;                g’’’’:!,.~t’                   .

                                                                                                                                                                                                                                                                        I
                                                                                                                                                                                                                     l.1S’                    Ok                ,.,:<
                                                                                                                                                                                                                           ...,.....’
                                              ’","
                                                                                                                 tl’~[;                   _~.
                                                                                                                                                  ,.~
                                                                                                                                                                                                                  ~ ~.tJ(~2l!.F
                                                                                                                                                                                                                     .
                                                                                                                                                                                                                                     ,
                                                                                                                                                                                                                                                                        i


                                "
                                                                                                                                                                                                                 i ). ~lO’
                                                                                                                                                                                                                                                                                            ~
                                                                             o Coolum Beach,                     ’n           f!i
                                                                                                                                                                                                                                                                                            "*
                                                                                                                       ,;;;
                                                                                                                                    ,rj

                                                                                                                                         I"’f!’
                     ’#< ~                                                                                           1.n!,1I
                                                                   /\;j ’).                ’{   \       ~:’
                                                                   i~   ~
                                                                            t~
                                                                                                .’            ’"",    "+
                                              ,1’,,’        ,,’,
                                                                                  l’                    -t’
                                                                                                                                tj\
                      ~
                          "}_   ,"
                                     >i’,
                                            ~:.; {,   ~}.
                                                                                                                       ..           ,      ’~
                                                                                                                      , ..~.. ,J,        "




                                                                                 o Marcool~

    Source: http://rrif.noosa.qld.gov.au/masterviewpublic/modules/mappingcontrol/default.aspx?page=search

                                                            Figure 1: General Location of the Proposed Development




    @2012 Simmonds & Bristow Pty LId                                                                                   Contrast Constructions                                                                                                J-1 005-31 0                   _
                                                                                                                                                                                                                                                                                22 March 2012
    I :ICLlENTFILESIContrast Constructionsl11 08-155c                                               -
                                                                                                        Essence of Peregian SCEP Stage 1 Updatel09                                          _
                                                                                                                                                                                                Output Documentsl11 08-155C SWM P                                           _




    SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                                                                                                                                                                 Page 2 of 24

Section 11

                                                                                                                                           ..




3.0        LOCAL ENVIRONMENT


The site is presently developed as a caravan park (the Peregian Beach Caravan Park) in the
Eastern Beaches Locality of the Noosa Shire Council planning scheme. The site is about 200m
west of the coastline on the western edge of the Peregian Beach village (Figure 1). Land uses
in the Peregian Beach Village area surrounding the proposed development site includes retail
and businesses, sporting facilities, a kindergarten, and the Noosa National Park.


The topography has    an average grade of 3.6% (Brown Consulting, 2007) that slopes in a

westerly direction from the retail and business area on the east of the proposed development
site, across the site and towards the Noosa National Park. Visual inspection indicated that land
on the northern and southern boundaries slopes away from the proposed development site.

Therefore stormwater will not enter or leave the site in a northern or southern direction, but will
flow in a westerly direction from the upslope retail and business area, across the development,
and into a wetland buffer on the edge of the Noosa National Park.


About two thirds of the existing site is cleared for caravans and camping, and consists of mown
grass under a light canopy of Broad-leaved Paperbark (Melaleuca quinquenerva). Down-slope
of the cleared caravan park area is a densely grown strip of highly disturbed vegetation that
includes native and exotic species.                           Remnant native wet-heath      vegetation grows along the
western boundary as an                                       the           National Park (Natural Solutions, 2007). The
                                    extension1of.    Nopsa
wet heath is the receiving
                                     environm;nt for sto[mwate~runoff.
                                                               ’

                                                        I

For this development it was proposed that the treatment train   cOfply with the Water Quality
Objectives for loads reductions required by..the Queensland Water Quality Guidelines (DERM
2009) (Table 3-1). The loads reductions wate~quality design objectives are important because
stormwater flow is intermittent, with most’exportlof sediment and, nutrients occurring during a
few short rainfall events each year.                        Manag~Q1ent’’needs to cover those few rainfall events, and
design objectives for annual load reductions                                 modate for h~gh                              events.
                                                                    jCcon
                        Table 3-1: Water Quality Desigr;’l Objectives,for Loads Reductions
                                                                                                   s~ormwater-flow
                        Indicator                                                      Water Quality Objectives

                  Suspended Solids                    ~~            .   ------...----_.      80% reduction

                  Total Phosphorus                                                          60 % reduction

                     Total Nitrogen                                                         45 % reduction


3.1        Site Features


          The planned development seeks to change the use of the site from a caravan park to
          visitor accommodation              (apartments and                beach      shacks), with commercial, retail and
          restaurant uses. The proposal includes two (2)accommodation buildings and thirty (30)
          beach shacks with two (2), three (3)or (4)four bedrooms. The commercial development
          will face David Low              Way, and will provide a street level frontage of retailing and
          restaurant services, with an accommodation module on the upper level of the building.
          The proposal includes 140 car parking spaces and 8 motor cycle bays across the site,
          which are located under the accommodation and commercial buildings.


          Features of the apartments will be utilisation of aspect (passive solar access, natural
          ventilation ofbuildings), topography (stormwater management), and existing native
          vegetation. The resort will have a full-time site manager.




@2012 Simmonds & Bristow Pty LId                              Contrast Constructions                         J-1005-310   _
                                                                                                                              22 March 2012
1:ICLlENTFILESIContrast Constructionsl1108-155c   -   Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl11 08-155C SWMP
                                                                                                                          _




SCEMP_Scanlon Property Group_V40_ta_120321.doc                                                                                  Page 3 of 24

Section 12

.’




                The landscaping has been designed to maintain the unique natural context of the site,
                which abuts the Noosa National Park. An ecological analysis of the natural buffers to
                the wetlands adjacent to the national park has been conducted to protect the significant
                habitats of the national park and to ensure that stormwater runoff is properly managed to
                protect the ecological function of the wetland. Approximately one quarter of the
                development site has been allocated for environmental buffering (between 16 and 60 m
                in width), and weeds that presently exist in the buffer zone will be removed.


                The intensity of stormwater flows will be mitigated                                                                 by a water storage tanks for each
                beach shack, and two (2) large underground water storage tanks for the apartment
                accommodation buildings, and one (1) large underground water storage tank for the
                commercial    building. The captured water will be reused for non-potable domestic
                purposes (laundry, toilets), or for irrigation of the gardens. Stormwater will also be
                directed through a treatment train of Bio-retention Trenches to the existing wetland area
                abutting the Noosa National Park. This treatment train is designed to achieve the water
                quality objectives listed in and Table 3-1.




                                                                         t,

                                                                f
                                                                l:         ~                            ))
                                                                                                                  ’.
                                                                l’       ’?r
                                                                 ,         "




                                                                 ,
                                                                     ,




                                                                                     aI
                                                                            ~;...

                                                                                                                                      ’}; .:’




                                                                                ’\ ’~      ,~
                                                                                               ,




                                                                                               ~
                                                                                                   ,




                                                                                                    :It
                                                                                                         .
                                                                                                                                      ..;
                                                                                                                                      )"




                                                                                                                                          ~
                                                                                                                                           <

                                                                                                                                               ~;:.
                                                                                                                                                      ~j




                                                                                If
                                                                                    ",I:;
                                                                                   .~ ii
                                                                                                   :’                                         J"’I

                                                                                                             ~:
                                                            ~,:. j    fi_’.!f   r~’ f’ J.)l,.,~~ C::’t_                     .....


                                                                       "._J’
                                                                 ~,



                                                                                -’.,._..;~~~ l.’:~L                    ..




     @2012 Simmonds & Bristow Pty LId                                       Contrast Constructions                                                         J-1 005-31 0   -
                                                                                                                                                                              22 March 2012
     1:ICLlENTFILESIContrast Constructionsl11 06-155c   -
                                                            Essence of Peregian SCEP Stage 1 Updatel09                                _
                                                                                                                                          Output Documentsl11 06-155C SWMP_




     SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                                                            Page 4 of 24

Section 13

4.0                RECEIVING WATER QUALITY


Water quality in the existing heath wetland was measured by Simmonds and Bristow on the 10th
July 2009, after rainfall and a stormwater flow event, to describe the existing physical-chemical
and          nutrient status of the                receiving           waters                 before the   proposed       Essence of            Peregian
development.    sample location map is shown in Appendix B. The existing water quality
                               A
parameters (Table 4-1) indicate that the water quality in the existing heath wetland was poor for
turbidity, suspended solids, total nitrogen and total phosphorus. Indicator concentrations that
exceed the guideline concentrations based on the level 2 environmental values associated with
the Noosa River: Environmental Values and Water Quality Objectives are highlighted in Table
4-1.


The Essence of Peregian Stormwater design will install water sensitive urban design features to
ensure that the quality of water entering the Noosa National Park is of better quality than that

currently discharged.

A map of the water quality sampling points has been included as Appendix F.


Table 4-1: Water Quality Measured in the Heath Wetland of the Existina Caravan Park Site

    Water Quality Indicator                                QWQG                     WS01          WS02     WS03         WS04        WS05          WS06

                                                          ,


                                                                                        250        290      470           200        180            230
    Conductivity        -
                            on site   (IlS / cm)
                                                           ,

    pH   -
             on site*                                      \5 7’-                        6.4       6.7      7.1           6.4        6.4            6.0


    Ammonia as N (mg/ L)                                      0~Q2                      0.050      0.25     0.22          0.13      0.054          0.046
                                                                    "’

                                                                         ..,
    Nitrate as N (mg/ L)                                       NA                       0.0’1      0.04     0.06          0.04       0.01          0.04
                                                                               ~
                                                                                   ’.


    Nitrate + Nitrite as N (mg/ L)                            0.06                      0.02       0.05     0.07          0.05       0.02          0.04
                                                                                        .
                                                                                        ,


    Nitrite as N (mg/L)                                        NA                       b.007     0.007    0.006         0.007      0.006          0.004


    Total Nitrogen as N (mg/L)                                ..0..5                     11        31        43           9.7’        11            0.7


    Total Phosphorus as P (mg/ L)                             0.05                       1.4       3.8      2.7           2.0         2.0          0.41


    Orthophosphate as P (mg/ L)                               0.02                      0.12       0.10     0.13          0.16       0.15          0.094


    Colour     -   True 0.45 11m (Pt-Co units)                 NA                       110        120      130           140        120            87


    Faecal Coliforms (CFU / 100 mL)                                                     160       16,200    1,120        1,800       720            <10


    Suspended Solids (mg/ L)                                    6                       720       2500      900          1000        1200           26


    Turbidity      -
                       Raw (NTU)                               50                       280        420      460           510        380            20


               Experts Conference Indicated that the low pH water quality objective IS SUitable on the baSIS of the
*
    JOint
wallum/tannin stained character of the receiving waters.
QWQG = Queensland Water Quality Guidelines.
Water quality indicators that exceed the environmental values have bold font and shaded background.




@2012 Simmonds & Bristow Pty LId                                    Contrast Constructions                                   J-1005-310   _
                                                                                                                                              22 March 2012
1:ICLlENTFILESIContrast Construdionsl1108-155c       -
                                                         Essence of Peregian SCEP Stage 1 Updatel09         _
                                                                                                                Output Documentsl11 08-155C SWMP
                                                                                                                                          _




SCEMP_Scanlon Property Group_V40_ta_120321.doc                                                                                                  Page 5 of 24

Section 14

5.0        SOILS INFORMATION


Soils testing undertaken by Butler Partners (2007)involved six (6)bores drilled to depths of 2.5
meters from across the site.                Surface soils were described as fill (silty sand with sub-angular
gravel)     over     most of the development (particularly the lower slopes), with                                         some        silty sand
observed near the eastern margin. The depth of surface fill was 0.8m on the lowest slopes, and
was about 0.2m further            upslope.

Soil under the surface fill was described as dark grey-brown silty clay or silty sand on the lowest
slopes (under the thick layer of surface fill), or light grey-grown fine sand under the 0.2m of fill
further upslope. The soil texture described by these tests were used to assess the soil erosion
hazard for the SECP by an Erosion Hazard Assessment Form (Queensland Best Practice
Environmental Management Guidelines 2009).


Butler and Partners (2007)identified acid sulphate soils at isolated locations, which will require
management and treatment to neutralise any net acidity if the soils are disturbed. The affected
soils are the dark grey-brown silty clay under the 0.8 m of fill adjacent to the wetland heath on
the western  margin of the development site. Butler and Partners developed a draft Acid
Sulphate Soil Management Plan (appended in Butler and Partner, 2007). This report has been
included as Appendix G of this document. Any soil disturbance in the indentified area is to be
managed in accordance with the Butler & Partners ASS Management Plan.

The SECP does not propose the installation of sediment ponds to collect runoff from the
building site to avoid disturbing acid sulph te soil. Instead sediment fences have been
recommended, with filter socks at outlet points to remove suspended fine sediment from the
                                                          ’ ,



overflow (Appendix D).


The Bioretention trenches to be installed ..,as part of the SMP are indented to be installed
primarily into the fill layer being applied to the,area, with minimal further excavation to a depth of
2.5mRL being expected to accommodate the           ;gravel layer. The Butler & Partners report (2007)
indicates that potential acid sulphate soils ex_ist at, a depth of approximately 2.3mRL under the
area of the site intended to situate the /Bioretention Trenches.             While the likelihood of
disturbance of Acid Sulphate Soils is minimal; an Acid Sulphate Soil Management Plan
(ASSMP)has been developed, by Butler & Partners and is inCluded in the report in Appendix G.
                                                                                         Ii:




Soil tests were also undertaken    by Simmonds and Bristow on the 10th July 2009. Eleven
samples of surface soils (0 100 mm) were collected across the site area, from the road to the
                                        -




edge of the field (refer to sample location map in Appendix B). The soils were analysed for
Loss on Ignition, Total Nitrogen, Total Phosphorus, pH, and Electrical Conductivity (Table 5-1).
These soils were slightly to strongly acidic, which lessens the availability of soil nutrients
available to plants. The soils had inherently low total nitrogen concentrations, and very low soil
salinity, based on these data.

Table 5-1: The Quality of Surface Soil Measured in the Undeveloped Site

                 ,
                     Soil Quality Indicator                                    SS2       SS3              SS4        SS5       SS6         SS7

Conductivity (1:5 soil: water extract) ()lS/cm)                                 76             23           26        19          32        29

Loss on Ignition at 4500C (%)                                                   2.4        1.6             1.6       1.7       3.7          2.2

pH (1:5 soil: water extract)                                                    6.6        5.6             5.4       5.4       5.6          5.5

Total Nitrogen as N (mg/kg)                                                   4700       3600             3600      6900      5700         4200

Total Phosphorus as P (mg/kg)                                                  1000      1100              580      1100       710          700




@2012 Simmonds & Bristow Pty LId                                Contrast Constructions                               J-1005-310   -
                                                                                                                                      22 March 2012
1:ICLlENTFILESIContrast Constructionsl1108-155c   -
                                                      Essence of Peregian SCEP Stage 1 Updatel09    _
                                                                                                        Output Documentsl11 08-155C SWMP
                                                                                                                                  _




SCEMP_Scanlon Property Group_V4 O_ta_120321 ,doc                                                                                       Page 6 of 24

Section 15

                               .-"+...,,n’’’’




                                                                                                                                                                                                               .’




Table 5-2: The Quality of Surface Soil Measured in the Undeveloped Site

                     Soil Quality Indicator                                                                                       SS8                      SS9              SS10    SS11           SS12

Conductivity (1:5 soil: water extract) (f.lS/cm)                                                                                   97                           28          49        80             53

Loss on Ignition at 4500C (%)                                                                                                     3.2                         2.9           3.1      3.1             2.5

pH (1:5 soil: water extract)                                                                                                      5.2                         5.6           5.7      6.0             6.4

Total Nitrogen as N (mg/kg)                                                                                                    9000                        5100             3900    5900           2900

Total Phosphorus as P (mg/kg)                                                                                                     840                      720              1300    1100            1700




                                                                                                L’~~~:’}                                    ,.r



                                                                    Q’l
                                                                                                                               ~
                                                                                                                                        I
                                                                                                                                   *
                                                                                                                    f~
                                                                                                    Ioll_"--’.,..____......       ’_"
                                                                                                                                                     l.,j r;;



                                                                                     "’’l)
                                                                                     ."         "
                                                                                                                                                          ,
                                                                                                                                                            .




                                                                                                                                                          ’ I
                                                                                                    "




                                                                                                         \                                    ..I
                                                                                    ’\                                                       .,

                                                                                           \;\,                 J                                                  ~..,,N

                                                                                                    t;                                                        1   ’~’"1




                                                                                                /                                                 f,’;J
                                                .,....,.~__~_,.i,1i                             :
                                                                                         ;1I~

                                                                                                         ,
                                                                                                                              ’t f:\~
                                                                                    .,                                                               ,.
                                                                                                    .


                                                ,~._...............____;;,___...f~.,.""_.."’_ .~v...""""""",..r’      ~.......~   .,.




@2012 Simmonds & Bristow Pty LId                                                Contrast Constructions                                                                        J-1005-310   -
                                                                                                                                                                                               22 March 2012
1:ICLlENTFILESIContrast Constructionsl11 08-155c              -
                                                                  Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl11 08-155C SWMP                                              _




SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                                                                                 Page 7 of 24

Section 16

6.0        STORMWATER MANAGEMENT PLAN


The attached plans in Appendix A show the location of key features of the Essence of Peregian
SWMP, and the proposed control measures to manage stormwater across the developed site.
A list of these plans is provided in Table 6-1.


Table 61 Drawlng L.
           -
               .
                  ISt
                                                                                     ’" ’.~.             "



                                                                                 l   i’,
                                                                                                                                         ,~’     -




       Drawing No                  ’Rev No                    Date              ..,i>
                                                                                           ’"
                                                                                                    r’       Title
                                                                                                                                          ’:~:

1105-155C-01-01                         A                  Dec 2011          Site Layout


                                        C                  Jan 2012
                                                                             Proposed Stormwater Treatment Device
11 05-155C-01-02
                                                                             Details & Lavout

11 05-155C-01-03                        C                  Dec 2011
                                                                             Proposed Pipe Routing and Catchment
                                                                             Areas
                                                                             Bio-Retention Trench Layout and
11 05-155C-01-04                        C                  Jan 2012
                                                                             Construction Details
                                                                             Bio-retention Trench Cross-Section and
11 05-155C-01-05                        C                  Jan 2012
                                                                             Construction Details

11 05-155C-01-06                        A                  Jan 2012
                                                                             Proposed Stormwater Treatment Train
                                                                             Details
                                                                             Erosion and Sediment Control Plan
11 05-155C-01-07                        A                  Dec 2011
                                                                             (ESCP) Full Development
                                                                                                -




                                                                             Erosion and Sediment Control Plan
11 05-155C-01-08                        A                  Dec 2011
                                                                             (ESCP) Stage 1 Development
                                                                                                -




The Site Location (Drawing 01) shows site boundaries of the Essence of Peregian in relation to
the Noosa National Park to the west, and urban development to the north, south and east.
                                            \

The Essence of Peregian development will install water sensitive urban design features. These
features willcapture and hold stormwater In Rainwater Tanks and on the land, with held
rainwater being used for domestic p_urposes within the residential complex, or for irrigating the
gardens to ensure stable ground cover., Stable ground cover is’~n important feature of erosion
risk management. Overflow from the rainwater ’st rage tanks will be directed to the site bio-
retention trenches.


Stormwater will be piped directly into Bio-retention Trenches, (Drawing 03 & Drawing 04) which
are   depression storages designed to impede water flow. These features will be installed within
fill platforms placed over the existing landscape. The beds will be installed at between 3.0                                                         -




3.5m, which is above the 100 year ARI flood level identified for the nearby Lake Weyba (RL
2.05m AHD) (Brown,2007). After passing through the Bio-retention trenches, stormwater will
flow into the existing heath wetland on the site, (Drawing 05 & 06) which will act as a buffer to
the national park.


Overland flow will be diverted, via catch drains into the bio-retention trenches (Drawing 06), for
treatment.


The    development site does not fall within the flood hazard area nominated by the Noosa
Council (Brown,2007). The stormwater treatment train is designed to accommodate the most
intense stormwater event encountered during a 5 year interval described by the ARI records
(202 mm/hour over a 5 minute period) (Australian Government, Bureau of Meteorology).




@2012 Simmonds & Bristow Pty LId                            Contrast Constructions                              J-1 005-31 0   -
                                                                                                                                   22 March 2012
1:\CLlENTFILES\Conlrasl Conslrudions\1108-155c   -
                                                     Essence of Peregian SCEP Slage 1 Updale\09_Oulpul Documenls\1108-155C_SWMP
SCEMP_Scanlon Property Group_V4 0_la_120321 ,doc                                                                                     Page 8 of 24

Section 17

                                                                                                                                                          ’.




6.1        Management of Stormwater

          This sub-section describes the treatment train                                 (Drawings 02 & 06) used to manage
          stormwater flowing through the Essence of Peregian development. The treatment train
          is designed to keep stormwater within the landscape of the proposed development site.
          There are three treatment units in the design treatment train:


           6.1.1         Roof Water capture


          Guttering provides capture of the rainwater incident upon the roofs of the buildings
          within the development. 100% of the roof guttering is connected to rainwater tanks,
          which provide both rainwater storage for re-use within the development, and attenuation
          of stormwater flows.


          These tanks have been sized in line with MP-4.3 of the Queensland Building Code to
           meet water savings targets, and sized are as follows
                .     Beach Shacks: 3 kL
                .     Building A: 100 kL
                .
                      Building B: 100 kL
                .     Hotel/Commercial Area: 100k L


           These tanks are to be provided with appropriate inlet arrangements, including first-flush
          diverters. Overflow of the tanks are to be ~connectecl to the Bioretention trenches for
          treatment before release to the r~ceivi(lg environment.
                                                                              ~   -      .

                                                          I

                                                                                               1’1
           6.1.2         Vegetated Buffers                      "



                                                                       ’f>.

          Vegetated buffers provide stable grounocover,
                                                  "
                                                        thereby minimising the erosion potential
          of the landscape surface. Vegetation includes grassed surfaces and deep rooted
          vegetation. Energy from rainfall is di’S.sipated over a broad, stable surface, and shallow
          sheet-flow of accumulated
                                      stormwate~ is slowed by the rough surface provided by the
          vegetation. The  soil binding capacity of the plant roots, and the capacity of the plants to
          assimilate nutrients from infiltration....water, provides the first step of the treatment train.
          Stormwater flows from the vegetated buffers into Bio-retention devices.


           6.1.3         Bio-retention Trenches


          The Bio-retention Trenches are generally dry, but during a stormwater flow the trenches
          may contain accumulated water to a depth of 200 mm, and 150 mm shortly thereafter
          when the trench is dewatering.


          Flow out of the Bio-retention Trenches is underground, with filtered water percolating
          through the base of the retention trench, through a gravel layer to the surrounding soil.
          Flow out of the Bio-retention Trenches during high flow will be via rock weirs. Maximum
          flow depths over the weir crests in the 100 year local runoff event are estimated to be
          less than 25 mm. Outflow is towards the existing Heath Wetland.


           Overland sheet-flow for the majority of the development is to be piped from stormwater
          collection pits to the bio-retention trench. For the periphery, where it is not possible to
          use stormwater collection pits, an interceptor drain, essentially a grassed swale, will be

           used     to    capture and divert incident stormwater to the bio-retention trenches for
          treatment.


          Pipe and swale entrances to the bio-retention trenches are to use rock basins and
          energy diffuser arrays to protect against scouring (drawing 04 & 05).




@2012 Simmonds & Bristow Pty LId                                Contrast Constructions                                J-1 005-31 0   -
                                                                                                                                         22 March 2012
I :\CLlENTFILES\Contrast Constructions\11 08-155c   -
                                                        Essence of Peregian SCEP Stage 1 Update\09   _
                                                                                                         Output Documents\11 08-155C SWMP
                                                                                                                                     _




SCEMP_Scanlon Properly Group_V4 O_ta_120321.doc                                                                                            Page 9 of 24

Section 18

~




               6.1.4       Existing Heath Wetland

              The existing wet heath wetland is to act as a buffer to the Noosa National Park. The
              Wetland System provides an ecological buffer to pest flora entering the Noosa National
              Park.


    6.2        Proposed Treatment Train

              This sub-section describes the proposed treatment train for stormwater management
              associated with the    operating phase of the developed site. The development is
              proposed to be completed in 3 stages.     Specific stormwater control will be instated for
              Stage 1 only, with the remainder of the stormwater devices being installed at Stage 2 for
              both the Stage 2 and Stage 3 development.


              The treatment units include Rainwater Tanks, Vegetation Buffers, Bioretention Trenches
              and include the environmental buffering provided by the existing Heath Wetland system
              for assimilation of stormwater into the                                               receiving environment.   The treatment train
              sequence is shown in Appendix B as follows:


               6.2.1       Stage 1     -  Southern Section (Only)


              Southern Section


              1.     Direction of flow from the Commercial area (restaurant roof, tank) into Bio-retention
                                                                                           ’

                     C1a.
              2.     Dire~tion of flow from the offsite commercial area, ar-park and on-site commercial
                     area   (restaurant podium) into Bio’::~tention C1a
              3.     Direction of sheet flow from th~ ~outhern catchment (the "South balance@ into Bio-
                     retention C1 b;                                                 ...



              4.     Direction of flow from shacks (ro s, tanks) into Bio-retention C1 b;
              5.     Direction of flow from bio-retention C1a to bio-retention C1b;
              6.     Direction of flow from Bio-retentio~ C 1 b into Heath Wetland;
              7.     Capture of sheet-fow from the northern and mid catchments using a Swale or catch
                     drain, directed to Bio-retention"C1b                                                 .il


                                                                                                            t’
                                                              _,p~_i""’..._
                                                                              ,-   _.~_""~.......,.,.,,!;,,,i;t~!
               6.2.2       Stage 2 & 3

              Northern Section


              1.     Direction of flow from the North balance into the Bio-retention A 1;
              2.     Direction of flow from the roof and rainwater tank of Building A into Bio-retention A 1;
              3.     Direction of flow from shacks (roofs,tanks) in the north section into Bio-retention A 1;
                     and
              4.     Direction of flow from the Bio-retention A 1 north trench into the Heath Wetland


              Mid section


              1.     Direction of flow from the Mid balance into the Bio-retention B 1;
              2.     Direction of flow from the roof and rainwater tank of Building B into Bio-retention B1;
              3.     Direction of flow from shacks (roofs,tanks) in the mid section into Bio-retention B1.
              4.     Direction of flow from the Bio-retention B1 mid trench into the Heath Wetland;


              Stormwater that has passed through all these treatment units enters the receiving node
              (Appendix B).          The design stormwater quality passing through the treatment units, as
              well   as    into the receiving node, for each stage of development, was modelled                                                     using
              MUSIC Version 4.




    @2012 Simmonds & Bristow Pty Ltd                                    Contrast Constructions                               J-1 005-310   22 March 2012
                                                                                                                                           -




    1:ICLlENTFILESIContrast Constructionsl1108-155c   -
                                                          Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI1108-155C_SWMP
    SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                            Page 10 of 24

Section 19

                                                                                                                                               .




          Southern Section


          1)    As per stage 1, without the swale for the capture of sheet-flow from the northern
                catchment areas


6.3        Modelling of the Stormwater Treatment Train

          Version 4 of the Model for Urban Stormwater Improvement Conceptualisation (MUSIC
          v4) has been utilised to predict the performance of the proposed stormwater treatment
          train. The use of Version 4 of the MUSIC model has been maintained due to the timing
          of the submission of the original application (prior to the release of Music V5). Modelling
          for both Stage 1 only and the complete development has been conducted to ensure that
          the proposed treatment system will be effective at all stages.


          Music model parameters have been developed and agreed to by the stormwater experts
          (David Bristow and Neil Collins) as part of the Planning and Environment court appeal
          (Appeal No: 2587 of 2008) concerning the development.

          In addition to load reduction         predictions a ’no worsening’ case has been applied,
          comparing        the   predicted discharge from the undeveloped site with the development
          stages.

           6.3.1      Existing Development                                ’~----."’~



          The site is presently developed as a caravan~park (the Peregian Beach Caravan Park),
          with approximately two thirds of, the existing site                             "Qeing
                                                                      cleared for caravans and
          camping, consisting of mown grass, urder a light canopy of Broad-leaved Paperbark
          (Me/aleuca quinquenerva).                                        ,




          Land uses in the Peregian Beach Village area surrounding the proposed development
          site includes retail and businesses,       facilities, a kindergarten, and the Noosa
                                                                     ~portiljlg
          National Park.                                              I




          There is currently no stormwater qualityl’improvement’ or treatment devices installed at
          the existing caravan park. Modelling has been conducted to provide a baseline to allow
          the comparison of the performance on                             aevelop {’"stormwater system to the existing
          case.     The stormwater system must achieve both the quality objectives in Table 3-1 and
          a ’no   worsening’ of pollutant loads on the national park.

          Table 6-2: MUSIC Model Results                         -
                                                                     Undeveloped Site
                            Water Quality Indicator                                                       Result

            Estimated long-term load (kg/year)                                           % reduction             Load (kg/year)

            Suspended Solids                                                                    0                      2170

           Total Phosphorus                                                                     0                          5.1

           Total Nitrogen                                                                       0                          30


           6.3.2      Stage 1 Modelling

          Results of MUSIC modelling showed that there will be no net increase in stormwater
                              Loads of sediment, total nitrogen and total phosphorus will be
          runoff from the site.
          substantially removed              from          stormwater          before   entering    the   Noosa      National         Park

          (Appendix B).




@2012 Simmonds & Bristow Pty LId                             Contrast Constructions                         J-1 005-31 0   -   22 March 2012
1:ICLlENTFILESIContrast Constructionsl1108-155c   -
                                                      Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI1108-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321 ,doc                                                                               Page 11 of 24

Section 20

.’   ,




                    Modelling for the Stage 1 development predicted a 15% reduction in stormwater entering
                    Noosa National Park, from 13.1    MLlyear to 11.1 MLlyear. The annual load of total
                    suspended solids from the existing site (the caravan park) was predicted to be
                    approximately 2500 kg/year, whereas the annual load from stage 1 of the developed site
                    is reduced to 77 kg/year (Appendix B). Likewise, annual loads for total nitrogen reduce
                    from 34 kg/year to 18.1 kg/year and the annual load for total phosphorus reduces from
                    5.9kg/year to 1.81 kg/year (Appendix B).

                    Water       Quality      predictions             from        the   MUSIC       model            (Appendix B)          indicate         that
                    contributions of total suspended solids, nitrogen and phosphorus in treated stormwater
                    from the Stage 1   developed site (Table 6-3) comply with the required water quality
                    objectives (Table 3-1) and are not worse than the existing case (Table 6-2).


                    Table 6-3 MUSIC M odeI ResuIts                           -   Stage 1 S.t
                                                                                           I e
                                                                                                                                                         ,;i
                                     ,

                                         Water Quality Indicator                                                               Result

                     Estimated long-term load (kg/year)                                                  % reduction                 Load (kg/year)

                     Suspended Solids                                                                               77                         567

                     Total Phosphorus                                                                               69                         1.81

                     Total Nitrogen                                                                              46                            18.1


                     6.3.3       Full Development Modelling                             t~
                                                                                                  ,’.   t:    ~’j




                    Results of MUSIC modelling showed that there will be no net increase in stormwater
                                        Loads of sediment, total nitrogen and total phosphorus will be
                    runoff from the site.
                    substantially removed from                         stormwater       before      entering             the   Noosa     National         Park

                    (Appendix B).

                   Modelling for the fully developed site.predicted a 30 reduction in stormwater entering
                   Noosa National Park, from 19 MLlyear to 13.3 MLlyear. ’The annual load of total
                   suspended solids from the existil)g site (the caravan park) was predicted to be
                   approximately 2500 kg/year, whereas the annual load from the fully developed site is
                   451 kg/year (Appendix B). Likewise, the annual load for total nitrogen reduces from 34
                   kg/year to 20 kg/year and the annuan ad for tot l phosphorus reduces from 5.9kg/year
                   to 1.8 kg/year (Appendix B).


                    Water       Quality      predictions from the MUSIC                            model            (Appendix B)          indicate         that
                    contributions of total suspended solids, nitrogen and phosphorus in treated stormwater
                   from the developed site (Table 6-4) comply with the required water quality objectives
                    (Table 3-1) and are not worse than the existing case (Table 6-2).

                    Table 6-4 MUSIC ModeI Results                            -   FuIIIy Developed Site
                                                                                                                                          .
                                                                                                                                                   "


                                     Water Q        ality Indicator                                                            Result’

                     Estimated long-term load (kg/year)                                                 % reduction                  Load (kg/year)

                     Suspended Solids                                                                         88                               451

                     Total Phosphorus                                                                         79                               1.79

                     Total Nitrogen                                                                           56                               20.3




         @2012 Simmonds & Bristow Pty LId                                Contrast Constructions                                 J-1 005-31 0   _   22 March 2012
         I :ICLlENTFILESIContrast Constructionsl11 08-155c   -
                                                                 Essence of Peregian SCEP Stage 1 Updatel09  _
                                                                                                                 Output Documentsl11 08-155C SWM P
                                                                                                                                               _




         SCEMP_Scanlon Property Group_V4 O_ta_120321 ,doc                                                                                          Page 12 of 24

Section 21

                                                                                                                                                                               .
                                                                                                                                                                                   I




 7.0          LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES

 Management actions for keeping the treatment train in working order are listed in Table 7-1, and
 are described  in detail in Appendix D. The maintenance actions required do not vary between
 Stage 1 and the ultimate development. Management of stormwater during the construction
 phase will be covered by the Sediment and Erosion Control Plan.
                                           .


Ta ble 71 M anagement A ctlons 0f the Essence 0fPere~lIan Stormwater Management Plan
          -
              .




       Management                                                                                        Description
            Action


        EP-SMP-01
                                   Maintaining the 3kL rainwater tank volumes associated with each beach
                                   shack

                                   Maintaining the 100kL underground rainwater tanks associated with the
        EP-SMP-02
                                   ornamental garden irrigation scheme

        EP-SMP-03                  Maintaining the vegetated buffer zones
        EP-SMP-04                  Irrigating the ornamental gardens
        EP-SMP-05                  Maintaining Swales or Catch Drains
        EP-SMP-06                  Maintaining the bio-retention trenches
        EP-SMP-07                  Maintaining the pipe infrastructure                                          ~      ....._

                                                                                            I


                                                                                                        A




                                                                           <.~~~)j
                                            ..,._~’:~           ’"
                                                                -   --
                                                                                ,,~.<
                                                                                          ). 1 ’)>1J


                                                                                                .~-__/           rll
                                                                                                                                J

                                                                                                                                     r-
                                                                                                                                         /
                                                                                                                                          I

                                                           t’            --~   .e.


                                               ’’’’
                                                                                                                                  ,rr’
                                                                                                                          _of’"
                                                ,j              ....
                                                                                      ~


                                                                               ,_.r’.,.._ .~_~_---"’-~"_~-"""-~’_"’_""-




 @2012 Simmonds & Bristow Pty LId                                                    Contrast Constructions                                   J-1005-310   -
                                                                                                                                                               22 March 2012
 I :ICLlENTFILESIContrast Constructionsl11 08-155c    -
                                                          Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl11 08-155C SWMP                      _




 SCEMP_Scanlon Property Group_V4 O_ta_120321 ,doc                                                                                                              Page 13 of 24

Section 22

.   ,




        8.0         SEDIMENT AND EROSION CONTROL PLAN


        The     Noosa       River: Environmental                      Values     and          Water      Quality Objectives       state        that the
        environmental values associated with the Noosa River Wetlands include aquatic ecosystem
        protection, and cultural and spiritual values. Because Noosa National Park is a protected area,
        these values require a high level of protection (level 1 protection).


        However the wetland adjacent to Noosa National Park is a disturbed ecosystem, as indicated
        by measured water quality parameters (Table 4-1). The existing caravan park development
        appears to be placing pressures on this wetland. The treatment train built for the proposed
        Essence of Peregian development is designed to improve the quality of water entering the
        wetland, and therefore, the water quality of the wetland. The target water quality objectives of
        stormwater entering the wetland are listed in Table 3-1.


        During the construction of the Essence of Peregian development, there is a hazard that
        disturbed soil might be carried into the wetland     by stormwater. In particular, fine sediment
        mobilised by stormwater will potentially carry nutrients into the wetland. The likely consequence
        of this is increased nutrient availability to weeds, with potential negative consequences for the
        adjacent Noosa National Park ecosystem.

        Assessment of the Queensland Best Practice Environmental Management Guidelines (DERM,
        2009) checklist (Table 8-1), shows that overall there is a high erosion hazard for this site. This
        hazard is directly affected by soil type (particularly imported,’fiII on lower slopes), the need to
        reshape the ground surface to install structwes, and the anticipated duration of site disturbance
        being 3 to 6 months. The hazard is greater during the wet season between November and July
        when the average monthly rainfall is expected to be above 100 mm.
                                                                                   .,




        Table 81 Factors Cont’b  mg t0 Eroslon. Hazard
                             rl uf
                       .
                   -
                       .




                                                   Erosion Hazard Assessment Form

         Controlling Factor                                                                         Points"                       Score
                                                                           ..
                                                                                                                     .;
         Average Slope of Whole Site                         ~: .,
                                                                     ;k~; i’~           ~’l’"’~;J     11f’!:1       -/               1
                                                                                             ~
                                                                          .~
         Soil type being disturbed                         ,~ ~’
                                                                                         ~..
                                                                                                    20r’5                         30r6

         Anticipated duration of site disturbance                                                     5                          8 or 11

          Erosive rainfall risk during site disturbance                            1 between Aug                -

                                                                                                                    Oct;
                                                                                                                              9 or up to 13
                                                                                    2 between Nov               -
                                                                                                                    Jul.

         Off-site sediment control (downslope of soil
                                                                                                      0                       9 or up to 13
         disturbance)
         Run-off entering the site                                                                    0                       9 or up to 13

         Extent of site disturbance                                                                   2                      11 or up to 15

         Total Score                                                                                11-15                  High Erosion Risk

        By implementing sediment and erosion controls, it is possible to moderate the erosion hazard.
        This includes protective covering of disturbed soils (particularly on erosion prone parts of the
        landscape, and when rain is expected), scheduling work to avoid the highest rainfall risk period,
        installing upslope diversion of runoff away from soil disturbance, and installing purpose built
        sediment control traps down-slope of the soil disturbance.


        The SECP has identified construction site best practices for managing sediment erosion and
        control. A daily site check-list will be used to ensure that building contractors are cognizant of
        and performing the required management actions.                                          This check-list is attached in Appendix C.




        @2012 Simmonds & Bristow Pty LId                                Contrast Constructions                             J-1005-31 0   -
                                                                                                                                             22 March 2012
        1:ICLlENTFILESIContrast Constructionsl11 08-155c   .
                                                            Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl11 08.155C SWM P _




        SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                      Page 14 of 24

Section 23

                                                                                                                                                                                                                     ,
                                                                                                                                                                                                                         .




The SECP also coordinates stormwater management with construction milestones, for effective
implementation of sediment erosion and control measures during the construction phase.

The plan      layout of the SECP in the proposed development area is shown in Drawings 1108-
155C-01-07 and 11 08-055C-01-08 (Appendix E), which shows where erosion management
structures need to be placed during construction activities. Slope-related erosion hazard areas
within the development site were identified from the topographic map (Drawing J-1 005-31 0-09
in Appendix C), and represent control points within the construction site where particular care
will be needed. The management actions for controlling erosion of the site, and movement of
sediment and nutrients from the site, are described in Table 8-2. The detail management plans
for sediment and erosion control are described in Appendix E.


Table 8-2: Sediment and Erosion Control for Construction of the Essence of Pere ian

   Management Action                                                                                                                    Description                          J.::




 EP-SECP-01                             Up-slope stormwater flow diversion.
 EP-SECP-02                             Site entry and exit points.

 EP-SECP-03                             Designated on-site stockpiles and waste receptacles.
 EP-SECP-04                             Down slope sediment controls.

 EP-SECP-05                             Maintaining ground cover.

                                                                  ’;
                                                            ,PJ
                                                          .r~ ~"
                                                               .\
                                                                                l
                                                                                                    l.,
                                                                                                       .~"-""""--__!!.-~
                                                                                                            .




                                                         .,.’
                                                            11:                     l

                                                         f.., ,.~_         j

                                                                       "
                                                                                                                                                               I,
                                                                                             ~!Ji
                                                                     ’’Ilo-l    f,



                                                                                                u
                                                                                                                                                               )
                                                                                          I~
                                                                                             \.~’-
                                                                                                .
                                                                                                                                                     ".. \
                                                                                                    ~       >
                                                                                                                         )
                                                                                                                         ~1
                                                                                                                                                                \
                                                                                                        I’
                                                                                                                ’1   ~


                                                                                                        I                 i
                                                                                                        ,II..’:           I                                          !

                                                                                                    )                                                            .~
                                                                                                        a;:          ’:t’                                        .



                                                                                                                      I                                        ..l"~     .


                                                                                                    ~                y                                   ~~~
                                                                        -<M_.   """
                                                                                        ""                        iC.......,."""_..".....-..-~._~riilrl,r.;-
                                                                                     .1


                                         ,r~~ ~,_~
                                                         ,,’r.Y,\
                                                                                                                  "._,;,;,,::_.
                                                                                                                                           ~
                                                                                                                                                   ~..~:)~.~




@2012 Simmonds & Bristow Pty LId                                           Contrast Constructions                                                                                   J-1005-310   -
                                                                                                                                                                                                     22 March 2012
I :ICLlENTFILESIContrast Constructionsl1108-155c   -
                                                       Essence of Peregian SCEP Stage 1 Updatel09                                                                _
                                                                                                                                                                     Output Documentsl1108-155C SWMP
                                                                                                                                                                                                 _




SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                                                                                      Page 15 of 24

Section 24

.   ’




        9.0         INSTALLATION SEQUENCE


        The installation sequence refers to implementation of the sediment and erosion controls during
        construction. The installation sequence described in Table 9-1 includes management actions
        detailed in EP-SECP-01 to -05 (Appendix D).


                                    atlon Sequence for the Essence 0fPereglan Deve opment
                    Table 91 I nstaII.
                                -




                         Item                           Drawing                                         Installed                 Removed

        Mark out initial limits of
                                                     Appendix D                             Before site disturbance.
        disturbance

        Install upslope flow
        diversions around area of
                                                                                                                            After surface ground
        disturbance, and down-                       Appendix D                             Before site disturbance.
                                                                                                                            cover is established.
        slope sediment control
        points
        Install access point on un-
        named road off David Low                     Appendix D                             Initiation of the project
        Way
        Clear access track                           Appendix D                         Before installing site office.

        Clear stockpile area                         Appendix D                         Before installing site office.
                                                                                            _,           -   ~   ...




        Install site office                          Appendix D                             Before building activity.

        Install waste areas and
                                                                                                                           After building activity
        stockpile sediment and                       Appendix D                         "   Before building activity.
                                                                                                                                 is complete.
        erosion controls.

                                                                                             After flow diversions,
                                                                                                  sediment control     .




                                                                                                   1
        Building activity.                           Appendix D                         "structures, access track,
                                                                                          stockpile are~, and site
                                                            ".R....~..,._-’
                                                                          ",J
                                                                              ._~’"
                                                                                        office-have’been installed.
                                                        r,’                      0"

                                                            .’1"        ’~~             Re-establish ground cover
        Install surface ground                                                           in development sub-areas
                                                     Appendix D                                  within 2 weeks after
        cover    (gardens)
                                                                                                       disturbance.




        @2012 Simmonds & Bristow Pty LId                                         Contrast Constructions                    J-1005-310   _
                                                                                                                                            22 March 2012
        I :ICLlENTFILESIContrast Constructionsl11 08-155c   -
                                                                Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl1108-155C SWMP
                                                                                                                                        _




        SCEMP_Scanlon Property Group_V40_ta_120321.doc                                                                                      Page 16 of 24

Section 25

                                                                                                                                         "    I
                                                                                                                                                  .




10.0       ENVIRONMENTAL IMPACT ASSESSMENT


The environmental             impact of stormwater from the development was assessed using the
accepted      solutions for managing stormwater quality in South East Queensland. The Water
Sensitive Urban Design Deemed to Comply Solutions for South East Queensland (henceforth
termed "the Solutions") outlines a seven step process for selecting and designing stormwater
management solutions, to achieve the stormwater management outcomes required by the
Department of Environment and Resource Management (DERM)(2009). The Solutions identify
acceptable solutions for "common" development scenarios to meet design objectives, which
are:



1)Stormwater Quality: Limiting the quantity of pollutants by adopting a best practices pollutant
load reduction approach, with consideration of the local climate.


2) Waterway Stability: Controlling the magnitude and duration of stormwater flows, to prevent
exacerbated in-stream erosion downstream of the development.


3) Frequent Flow: The hydraulic disturbance of in-stream ecosystems is similar to the pre-
development condition, which is achieved by capturing the initial portion of runoff from
impervious areas.

The     proposed              Peregian development will be in the Sunshine Coast Regional
                      Essence of
Council jurisdiction, which is in the North
                                            Co~st  climate-region of South East Queensland. The
proposed development type     is resi~ential land use, with a scenario of residential development
greater than 2 lots up to 20 lots. The  residential development scenario can include commercial
development of high-density, multiple dwelling buildings at’a scale of $; 12,500 m2. This
scenario applies to the "Essence of Peregian" development inclusive of the 6,970 m2
commercial node.                                                        ~




The site details of the Essence of Peregian ’Dev lopment are"presented on the annotated site
                                                                                             ’<

details plan (Appendix C), and summarized in,Table 10-1.

                                                                   ,j,f
                   Table 10-1: Site Details oftt\e Ess,ence of Pe!egian Development

            Site Detail                                                               Description
                                            The average grade is 3.6%, with a preferred flow pathway from
Existing Topography                         east to west across the development.

Existing Drainage                           There          are   no   significant existing drainages in the proposed
Characteristics                             development            area.


Proposed Discharge Points                   A proposed stormwater drainage has been designed for this
and Invert Levels                           development (refer to plan drawings in Appendix A).
                                            The surface and sub-surface soils of the proposed development
                                            area         include imported fill, silty-clay, silty-sand, and fine sand.
                                            The surface soils are acidic, with low nitrogen concentration and
Soils
                                            very low salinity. Acid sulphate soils may occur in the sub-
                                            surface, but these soils will not be excavated or disturbed
                                            because additional fill will be placed over them.




@2012 Simmonds & Bristow Pty LId                             Contrast Constructions                         J-1005-31 0   _
                                                                                                                              22 March 2012
1:ICLlENTFILESIContrast Constructionsl110B-155c   -
                                                      Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI110B-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                               Page 17 of 24

Section 26

    I
.




        Development details (site layout, sub-catchments, conceptual earthworks and conceptual
        drainage) are provided as plan drawings in Appendix A (drawing numbers 1108-155C-01-01 to
        1108-155C-01-06). Specifications of the site layout (roof area, balance area) are given in
        Appendix B. There are south, mid, and north sub-catchments (drawing J-1 005-31 0-06), each
        with a design treatment train that flows toward the existing heath wetland and the receiving
        node of the receiving waters next to therNoosa National Park.


        The Solutions state minimum sizes of Rainwater Tanks and Bio-retention                                                                  systems that are
        required     to meet the Queensland Development Code Mandatory Part 4.2 and 4.3, and the
        stormwater quality objectives outlined in the Best Practice Environmental Guidelines                                                                    -
                                                                                                                                                                    Urban
        Stormwater. The stated dimensions proposed for the Essence of Peregian development are
        listed in Table 10-2.

                                                                                                                                                                 .


                                                                           I SoI utlons
           Table 10-2: Dimensions 0fRainwater Tanks andWSUD Deemed to Comply

                Deemed to Comply                               Deemed to Comply
                                                                                                         I’
                                                                                                                     ’"’"
                                                                                                                            "" ,
                                                                                                                                     Development size               ,

                                                                                                                                                                    .J’
                                                                                                                                                                        ,,’

                      Solution                                     Requirement
                                                                                                                ..




                                                                                                         ’.~’!;             ,
                                                                                                                                                                    \,


                                                    3 kL.

                                                    Old Development Code
         Rainwater tank for                                                                                   3 kL. per beach shack
                                                    MP 4.3 requires1.5 kL per
         attached dwellings in the
                                                                                                              2 x 100 kL               =   200 kL (apartment
         Sunshine Coast Regional                    required pedestal in
                                                    commercial buildings with                                 buildings)
         Council (North Coast)
                                                    a class 3 code (Le. motels                                1 x 100kL = commercial building
         region:
                                                    or boarding houses that
                                                                                                                     ~-.~       ,A
                                                                                                                            .

                                                    unrelated people co-habit).
                                                                                                                "’
                                                                                                                     "


                                                                                                              Bio;retention A 1 (north)                  =   1.5 %
                                                                       /- J,;’
                                                                        ’"
                                                                                                                     J      ’




                                                                                                              Bio-retention B1 (Mid)= 1.5 %
         Bio-retention System Filter
         Media Area (%of                                                1.1 %               1
                                                                                                              Bio-retention C1A (south)= 1.5 %
                                                                                            .1
         catchment area):                                                                        I
                                                                                                              Bioretention C1 B (south)= 1.5%
                                                                                 t.)
                                                                                       .I
                                                                                            3~                              l

                                                                                                     ,    Total Bio-retention Area = 1 5%
                                                                                                                     "J
                                                                                            j


        The Rainwater Tanks are sized       app~opriately for the accommodation units (3 kL per beach
        shack).      The surface areas represented by the ’Bio-retention Trenches (1.5% of the catchment
        area) complies the WSUD Deemed to Comply Solutions (1’:1 %).

        It is possible to design a stormwater treatment train outside the prescribed parameters,
        provided that the Best Practice Environmental Management Guidelines Urban Stormwater                                                -




        (DERM 2009) and the planning requirements of the assessment authority are followed. A
        carefully designed stormwater treatment train has been proposed by the Stormwater
        Management Plan, and has been supported by detailed MUSIC modelling (section 6.0).

        In summary, the Environmental Impact Assessment indicated that the proposed Essence of
        Peregian development will have negligible consequences resulting from total suspended solids,
        total nitrogen and total phosphorus entering Noosa National Park. The treatment train for the
        SWP has been designed to minimise the effects of rainfall and stormwater erosion of the
        landscape, retain rainwater collected on roofs and hard surfaces for irrigation and domestic use,
        and direct remaining overflow through Bio-retention Trenches.


        Detailed MUSIC modelling identified that the proposed development will achieve the required
                    objectives (Appendix B). Suspended solids and total nutrients will be removed
        water quality
        early in the treatment sequence (Appendix B). It is predicted that the maximum concentrations
        of pollutants in stormwater during extreme events (Appendix B) will be substantially less than
        concentrations presently measured in stormwater entering the existing heath wetland from the
        existing caravan park site (Table 4-1).



        @2012 Simmonds & Bristow Pty LId                              Contrast Constructions                                                J-1005-310   -
                                                                                                                                                             22 March 2012
        1:ICLlENTFILESIContrast Constructionsl11 08-155c   -   Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl1108-155C SWMP                _




        SCEMP_Scanlon Property Group_V4 0_la_120321 ,doc                                                                                                     Page 18 of 24

Section 27

                                                                                                                                                             ,   .




11.0          MONITORING AND EVALUATION OF WATER QUALITY AGAINST TARGETS


A draft water quality monitoring program has been developed to measure the performance of
the proposed stormwater treatment. The objective of the monitoring program is to quantitatively
show whether or not the nominated water quality targets are being met.


The key water quality indicators are total suspended solids, total nitrogen, total phosphorus and
pH. Other relevant water quality parameters include microbiological parameters (faecal
coliforms, Escherichia COIl), chemical and physical parameters (dissolved oxygen, turbidity), and
herbicides if they are used within the development site. The following water quality indicators
are recommended (Table 11-1):



      .        Microbiological: Faecal coliforms, Escherichia coli
      .
               Physical: Biological Oxygen demand, dissolved oxygen, suspended solids, turbidity,
               pH;
      .        Chemical: Total suspended solids, total nitrogen, total phosphorus; and
      .        Herbicides: If herbicides are used to control weeds on the development site, then
               they should be included in the suite of water quality indicators.

                                    -
                                        .
                                                                   lent Su rface Wt
                        Table 111 Summaryof Test M ethods for A m b.
                                        .
                                                                                  aers


                                                      ,.Sample Preparation
               Parameter
                                                                           Method
                                                                                                                 Sample Analysis Method

                                                        Heated persulphate
 Nutrients      -
                    total                                                                                       S~AL AQ2 discrete analyser
                                                                          digestion-       ~
                                                                                                   .




 E coli                                                  Membrane filtration                            l EC      ~roth or EC-MUG medium
                                                                                                       iI         .

 Faecal coliforms                                        Membran~filtration                                               M-FC Agar

                                                                                                   ...Membrane electrode in Wheaton
 BODs                                                                    Incubation
                                                                                                                            Bottles

 Suspended solids                                        Membrane filtra:tion                                I            Gravimetric
                                                                                                                      ,
                                                                                                            J
 Dissolved oxygen                                                           None                        ""
                                                                                                                   Membrane electrode

 pH                                                    ..-.;t"-f’.:;-_
                                                             t
                                                                 f.’
                                                                            None
                                                                                            -

                                                                                                                   Membrane electrod~
                                                       ,                                                    ,-

 Turbidity                                                                  None               ~                          Photometer

 Herbicides                                                Solvent extraction                                              #GC/MS

#GCMS     -
              Gas Chromotograph/Mass Spectrometer



The existing         spatial variation of key water quality indicators in the wetland adjacent to the
Noosa National Park, measured on the 10th July 2009 after a stormwater flow, was used to
identify the replication needed to represent water quality in the heath Wetland System and the
receiving node.

It is recommended that the water  quality of the existing heath wetland is represented by 9
sampling points per sampling                        replicates). This sampling frequency will
                                             event (Le. 9 spatial
accommodate the spatial variation of water  quality measurements   expected in the heath that
connects with Noosa National Park, and   will quantitatively show the difference between the
average measured concentrations compared with the required target or guideline values.


The recommended sample points are indicated in Table 11-2, which lists the location of sample
points during the construction phase and the operational phase.




@2012 Simmonds & Bristow Pty LId                                         Contrast Constructions                             J-1005-310   _
                                                                                                                                             22 March 2012
1:ICLlENTFILESIContrast Constructionsl1108-155c   -
                                                      Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI1108-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                              Page 19 of 24

Section 28

    ,.
.




         Table 11-2: Location of Water Quality Monitoring at the Essence of Pereaian Site

                        Site                  Site No.                                           Description

          Heath     -
                        Southern                    1              Monitor quality of stormwater entering wetland from the
          Bioretention Outlet                                      Southern treatment train

          Heath     -
                        Southern                   2               Replicate monitoring of stormwater quality entering
          Bioretention Outlet                                     wetland the Southern treatment train

          Heath     -
                        Mid                         3              Monitor quality of stormwater entering wetland from the
          Bioretention Outlet                                      Mid treatment train

          Heath     -
                        Mid                        4               Replicate monitoring of stormwater quality entering
          Bioretention Outlet                                     wetland from the Mid treatment train

          Heath     -
                        Northern                    5              Monitor quality of stormwater entering wetland from the
          Bioretention Outlet                                      Northern treatment train

          Heath     -
                        Northern                   6               Replicate monitoring of stormwater quality entering
          Bioretention Outlet                                      wetland from the Northern treatment train

                                                    7              Monitor quality of stormwater entering the receiving
          Heath
                                                                   waters

                                                    8              Replicate monitoring of stormwater quality entering the
          Heath
                                                                   receiving waters
                                                    9              Replicate monitoring of,stormwater quality entering the
           Heath
                                                                   receiving waters        ’\

           Construction Site                       10              Monitor fainfall onto cons~ruction site
                                                                                                           ,
           Inflow onto                             11
                                                                   Monitor qua ity of stormwater entering construction site
           construction site
                                                                                                       .
           Inflow onto                             12
                                                                   Monitor quality of stormwater entering construction site
           construction site                                                                           .

                                                                                                    c)’"
           Outflow from                            13
                                                                   Monitor quality of stormwater exiting construction site
           construction site

           Outflow from                            14,
                                                                   Monitor quality of sformwater exiting construction site
           construction site


         Locations are as per the sampling map, included as Appendix F,


         Monitoring needs to              commence               during the construction phase, and continue during the
         operational phase.

         11.1       Water Quality Monitoring During Construction


                   During construction, monthly monitoring for the parameters described in Table 11-1 is
                   recommended from sites 7 to 9 (Table 11-2).      Additionally, it is recommended that the
                   suspended solids concentration     of stormwater  is measured at sites 10 to 14 during
                   stormwater events, with collection of four (4) stormwater samples flowing onto the
                   construction site, four (4) more stormwater samples flowing from the construction site
                   into the heath wetland, and a rain-gauge is installed on site to indicate the intensity of
                   rainfall during a stormwater event (Table 11-2).




         @2012 Simmonds & Bristow Pty LId                             Contrast Constructions                         J-1 005-31 0   _
                                                                                                                                        22 March 2012
         1:\CLlENTFILES\Contrast Constructions\1108-155c   -
                                                               Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
         SCEMP_Scanlon Property Group_V4 O_ta_120321 ,doc                                                                               Page 20 of 24

Section 29

                                                                                                                                                      .,
                                                                                                                                                           ,




           Inflow and outflow water needs to be collected as paired                                       samples within a short time
          frame, with each pair representing the same phase of stormwater activity. The volume
           of stormwater generated in the catchment can be calculated by the area of catchment
           and      intensity of rainfall during the event. The proportionate change in the
                  the
           suspended solids loads in stormwater flowing over the construction site will provide a
           measure of the sediment being generated from the construction site.



           Herbicide monitoring in stormwater entering and leaving the construction site should be
           performed           when     applications           are     known         to   occur, rather            than   routinely.          Some
           herbicides have a short residence time, so arrangements may need to be made with the
           laboratory for rapid courier service and turnaround time. The monitoring schedule is
           listed in Table 11-3


11.2       Water Quality Monitoring During Routine Operation of the Essence of Peregian


          Sampling should be performed at sites 1 to 9 (depending upon staging). The temporal
          sampling frequency is recommended at monthly intervals for the first 12 months, with
          quarterly sampling thereafter (Table 11-3). This temporal frequency is intended to show
          the proportional improvement from the existing water quality condition in response to
          improved stormwater management associated with the new development. Seasonal
          variations can be identified from the quarterly samples. Herbicide monitoring is as
          described for the construction phase.


    Table 11-3: Monitorin ~ Schedule for the Construction and Operational Development
                       Site     Site     Site          Site    Site     Site     Site     Site    Site        Site   Site   Site       Site   Site
 Parameter
                       1        2        3             4       5        6        7        8       9           10     11     12         13     14
                                                                       )’.                        .
                                                                                                          "




 Rainfall                                                                                                     S
                                                                                                          .

                           .        .        .                     .         .       .        .



 pH                    M        M        M         M’          M        M        M        M       M’      .

                           .        .        .                     .         .       .        .       .


 Dissolved             M        M        M         M’          M        M        M        M       M
 oxygen
                                                                                 ’                    .
                           .        .        .                     .         .       .        .
                                                                                                              .

 BODs                  M        M        M         M’          M        M        M        M       M
                           .        .        .                     .         .       .        .   ".

 Suspended             M        M        M         M’          M        M        M        M       M                  S      S         S       S
                                                                                                          r
 Solids
                           .        .        .                     .         .       .        .       .


 Total                 M        M        M         M’          M       M         M        M       M
 Nitrogen
                           .        .        .                     .         .       .        .       .


 Total                 M        M        M         M’          M        M        M        M       M
 Phosphorus
                           .        .        .                     .         .       .        .       .


 Herbicides            M        M        M         M’          M       M         M        M       M                  S      S         S       S
                           .        .        .             .       .         .       .        .       .


 Faecal                M        M        M         M           M       M         M        M       M
 coliforms
                           .        .        .                     .         .       .        .


 Enterococci           M        M        M         M’          M       M         M        M       M’
                           .        .        .                     .         .       .        .       .



 Turbidity             M        M       M          M’          M       M         M        M       M

M   _

        monthly monltonng dunng construction and dunng the first two years of operation; quarterly mOnltonng dunng
the second year and thereafter,
S = Monitoring during stormwater flow events




@2012 Simmonds & Bristow Pty LId                               Contrast Constructions                                J-1005-310   _
                                                                                                                                      22 March 2012
I :\CLlENTFILES\Contrast Constructions\1108-155c   -
                                                       Essence of Peregian SCEP Stage 1 Updatel09  _
                                                                                                       Output Documentsl11 08-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321,doc                                                                                       Page 21 of 24

Section 30

    ,.
.




         12.0        CONDITIONS AND LIMITATIONS


         The data contained in this volume has been commissioned by Scanlon Property Group, Limited
         on   behalf of Thomco Pty Limited, to support a Development Application for Operational Works
         associated with the development     known as ’Essence of Peregian’ located at 215-219 David
         Low Way, Peregian Beach.


         In preparing this report, Simmonds and Bristow has, in part, relied on survey data, flood level
         data, calculations and previous reports prepared by Council and external consultants to support
         the original development application, and the preparation of Joint Experts Reports for the court
         ordered       mediation        process        associated            with    the    preparation of the negotiated approval
         conditions.


         While reasonable              precautions           have been taken to validate the data                        provided before its
         incorporation into modelling and design procedures, the absolute accuracy of such data cannot
         be guaranteed with certainty and may vary over time as site conditions change. As such, it is
         anticipated that minor changes may be required on site to allow the recommendations of this
         plan to be implemented effectively.

         Minor or temporary changes to accommodate on-site conditions during the construction phase
         should be made in consultation with a suitably qualified and experienced professional engineer
         or   qualified sediment and erosion control specialist.                                 ."




         Any proposed permanent changes required to the layout, geometry, depth and/or volume of
         bioretention trenches and/or wetland elements                                 as   a    result;’of any site conditions that are
         different to those assumed and modelled       during design, shou’ld be referred back to the
         designer, or to a suitably experienced and,qualified stormwater management consultant, and
         resubmitted to Council for compliance re-certification and approval.


         The Stormwater Management Report contained within this repbrt comprises of all constituent
         parts of the report in full, including the text, calculation summary and appended drawings. If
         additional copies of this repp,rt are required, separate sections or individual pages must not be
         copied in isolation.                                                                         Ii,




         Except for archival and record keeping purposes, this report should not be copied and stored in
         any electronic media or passed onto other parties without the express written permission of
         Simmonds & Bristow.


         No part of this report may be copied or used for any other purposes other than the purpose
         stated in this report.




         @2012 Simmonds & Bristow Pty LId                               Contrast Constructions                          J.1005-310   -
                                                                                                                                         22 March 2012
         I :ICLlENTFILESIContrast Constructionsl11 08-155c   -   Essence of Peregian SCEP Stage 1 Updatel09_Output Documentsl11 08-155C SWMP
                                                                                                                                     _




         SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                 Page 22 of 24

Section 31

                                                                                                                                             oJ’
                                                                                                                                                   .




13.0        COMPLIANCE CERTIFICATE


Simmonds & Bristow hereby certifies that the Stormwater Management Plan, as detailed within
this report, "Essence of Peregian, Stormwater Management Plan & Sediment & Erosion Plan,
Simmonds & Bristow, March 2012," (including the associated drawings listed and attached
herein 1108-155C-01-01 to 1108-155C-01-08), if implemented and maintained on site in
           -




accordance with the detailed instructions set out for both the Operational and Construction
Phase of the development contained within the report, will result in compliance with the relevant
conditions of development consent, in particular:


Condition 61       "All stormwater drainage (including roof water overflow from the rainwater
                      -




storage system) shall be collected and discharged so there is no net increase in stormwater
runoff from the site. Stormwater drainage permitted to drain from the site shall e discharged via
existing and proposed drainage structures contained within the site, as detailed within the
Simmonds and Bristow report titled "Essence of Peregian Stormwater Management Plan,
Sediment and Erosion Control Plan" revision 3 dated 13 January 2012, except as modified by
these conditions. The maximum discharge of stormwater drainage allowable to Council’s kerb
& channel street drainage system at anyone location is 24 litres/second.


Condition 62         -
                         "A detailed Stormwater Management Plan and a Sediment and Erosion Control
Plan shall be prepared. This will generally be in accordance with Simmonds and Bristow report
titled "Essence of Peregian Stormwater Management Plan;--Sediment and Erosion Control Plan"
revision 3 dated           13 January 2012.                   IMUSIC modelling and "reporting shall be refined to
incorporate the final proposed desigrJ:
                                                                                              ’"I


Condition 63         -
                         "Grease and Oil arrestors and/or stormwater                          duality improvement devices must
be incorporated into the design to treat all run-off prior to run~off exiting the premises. Grease
                                                                 "                     ....
and Oil arrestors or stormwatrer quality    improvement devices must be consistent with the
                                                                   ,                          ~

design  and   water quality objective requirements specified within the Simmonds and Bristow        ~

report titled  "Essence   of Peregian Stormwater Management Plan, Sediment and Erosion
Control Plan" revision 3 dated 13 January 2012.
                                                                                               .J

Condition 63a       "The proposed stormwater treatment system (including all bioretention
                         -




trenches) must be wholly located within land contained within Stage 2 and Stage 3 and must
not be located within the lands identified as Park/Environmental Reserve (Stage 1)


Condition 64   "A detailed maintenance plan shall be prepared for the proposed stormwater
                     -




management system, which shall be submitted to the council for approval prior to obtaining a
development permit for Operational Works.

This report and the certification included within it has been prepared for a specific location and a
specific development proposal, as described in this report. Any changes to the development
layout, sequencing, or the relative areas of pervious, impervious or roof areas made
subsequent to this certification shall render this certification void and an amended certification is
to be obtained.




Signed:                                                               Date: 26 March 2012


David Bristow MIEAust, CPENG, RPEQ




@2012 Simmonds & Bristow Pty LId                             Contrast Constructions                         J-1005-310   _
                                                                                                                             26 March 2012
1:ICLlENTFILESIContrast Constructionsl1108-155c   -
                                                      Essence of Peregian SCEP Stage 1 Updatel09_Output DocumentsI1108-155C_SWMP
SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                              Page 23 of 24

Section 32

.’   4"




          14.0       REFERENCES


          Australian and New Zealand Environment and Conservation Council (2000). Australian and
          New Zealand Guidelines for fresh and marine water                                      quality. Australian and New Zealand
          Environment and Conservation Council, Agriculture and Resource                                       Management Council of
          Australia and New Zealand.


          Brown Consulting (2007). Concept Stormwater Management Plan for Essence of Peregian at
          David Low Way, Peregian Beach. Technical Report. 17pp.


          Butler Partners (2007). Acid Sulfate Soils Assessment Residential Development 215-219 David
          Low Way Peregian Beach.


          Department of Environment and Resource Management (2009). Queensland Best Practice
          Environmental Management Guidelines 2009.  Queensland Department of Environment and
          Resource Management Technical Report. 304pp.


          Environmental Protection   Agency (2007). Noosa River Environmental Values and Water
          Quality Objectives. Basin No. 140 (part) Including Kin Kin Creek, Teewah coastal creeks, Lakes
          Cooroibah, Cootharaba, Doonella and Weyba. Queensland Environmental Protection Agency
          Technical Report. 35pp.


          Grant Witheridge. Erosion and Sediment Control. A decade of lessons learnt. Catchments and
                                                                                      -




                                                                                                              "

          Creeks Pty Ltd unpublished seminar material.


          Healthy Waterways. Controlling stormwater pollution on your building site. Information booklet
          with factsheets.


          Healthy Waterways (2006). Water Sensitve’;Ubran Dsesign Technical Design guidelines for
          South East Queensland


          Healthy Waterways (2009). Concept Design Guidelines for Water Sensitive Urban Design

          Facility for Advancing Water Biofiltration (2009), Guidelines for Filter Media in Biofiltration
          Systems V 3.01

          Local Government Association of Queensland       (2006). Introductory Erosion                                          and Sediment
          Control Guidelines for Queensland Councils. Technical Report.. 64pp.


          Natural Solutions (2007). Ecological Assessment- 215-219 David Low Way, Peregian Beach.
          Technical Report. 41pp.


          SEQ  Healthy Waterways Partnership (2009). Water Sensitive Urban Design Deemed to
          Comply Solutions for South East Queensland. Technical Manual 74pp.




          @2012 Simmonds & Bristow Pty LId                              Contrast Constructions                           J-1005-310   -
                                                                                                                                          22 March 2012
          1:ICLlENTFILESIContrast Constructionsl1108-155c   -
                                                                Essence of Peregian SCEP Stage 1 Updatel09
                                                                                                         _
                                                                                                             Output Documentsl1108-155C SWMP
                                                                                                                                      _




          SCEMP_Scanlon Property Group_V4 O_ta_120321.doc                                                                                 Page 24 of 24

Section 33

                                                                                         ..."
                                                                                                .




                                    APPENDIX-A:----              :t   ’:...
                                                       .

                               11       ’I    ’..
                                                       .
                                                        ,
                                                                 ,’\,
                               "I        ,    Jl:"~>        _    .:           "\




                               ’’’:;~~_~E       PLANS
                                                                 ’) )
List of Certified Plans Included:                               ....."’. (
1105-155C-01-01, Rev A, Dec 2011    Site Layout
                                    -




1105-155C-01-02, Rev C, Dec 2011    -

                                        Proposed Stormwater Treatment Device Details &
                                         Layout
1105-155C-01-03, Rev C, Dec 2011    -

                                        Proposed Pipe Routing &/Catchment Areas
1105-155C-01-04, Rev C, Dec 2011    -
                                        Bioretention Trench Lay ut General Arrangement
1105-155C-01-05, Rev C, Dec 2011    -
                                        Bioretnetion Trench Short Cross-Section and
                                        Construction Details
1105-155C-01-06, Rev A, Dec 2011    -
                                        Stormwater Management and Control Areas

Section 34

     QflfTDUAU                ...-                    _satllIU                                                                                        IllAWll T

     SCANLON PROPERTY GROUP   ESSENCE OF PEREGIAN
                                                                                \
                                                                                    ::::’:==~,Simmonds & Bristow Ply. Ltd.                            SITE LOCA TION
                                                                                    ............L

.                             STORMWATER MANAGEMENT                             ~ ::...~..._....... WATBI&ENYRlNIoIENTALAIW.’i8TS &CONSI1.TN<<S


!.
                              PlAN

                                                                 IITl.
                                                                         TA
                                                                         DJII
                                                                                    .._.......
                                                                                l...........................
                                                                                    ,.....,.,.............     "Intm,IIIOW’.
                                                                                                               ’.IOXJIM~...41t4.wsJlAUl
                                                                                                               ’In".,..
                                                                                                               ,.........
                                                                                                                              -.....,............
                                                                                                                                                    Ii)
                                                                                                                                                    , IllAWll SlAM
                                                                                                                                                                     FORINfORHATION
                                                                                                                                                                                      _..
                                                                                                                                                                                      110B-1SSC
                                                                                                                                                                                      M"

                                                                                                                                                                                      1108-155(-01-01
                                                                                                                                                                                                        1lY.

                                                                                                                                                                                                         A
.

Section 35

                                                                                                                                                                                                                   -I
                 BEACH SHACKS (EXAMPLE) FOR ALL SHACKS
                                         -




                          100% OF ROOF AREA CONNECTED TO
                     3kL STORAGE TANKS WITH APPROPRIATE
                                     INLET ARRANGEMENTS

                                                                                                                                                             BUILDING A
                                              CATCH-DRAIN TO A 1                                                                                             100% OF ROOF AREA CONNECTED TO
                                                                                                                                                             1 OOkL STORAGE TANK WITH APPROPRIATE
                          NORTHERN BIORETENTION TRENCH A 1
                                                                                                                                                             INLET ARRANGEMENTS
                                         95m’ SURFACE AREA
                                     SEE DWG 1108-155C-01-04
                                          AND 1108-155C-01-05
                                FOR GENERAL DESIGN DETAILS
                                                                                                                                                                                         I
                                                                                                                                                           OFFSITE CATCHMENT
                                    APPROXIMATE
                                 DEDICATION LINE




                                             CATCH-DRAIN TO A 1

                                                                                                                                                           BUILDING B
                                                                                                                                                                                        I
                                                                                                                                                           100% OF ROOF AREA CONNECTED TO
                                                                                                                                                           100kL STORAGE TANK WITH APPROPRIATE
                                                                                                                                                           INLET ARRANGEMENTS
                                          CATCH-DRAIN TO 81
 EXISTING I^T HEATH
                I^TLAND




                                                                                                                                                                                                 40       5C
                                MID BIORETENTION TRENCH B1
                                         81m’SURFACE AREA
                                     SEE DWG 1108-155C-01-04                                                                                                        HOTEUCOMMERCIAL AREA

                                         AND 1108-155C-01-05                                                                                                        100% OF ROOF AREA CONNECTED TO

                                FOR GENERAL DESIGN DETAILS                                                                                                          100kL STORAGE TANK WITH APPROPRIATE
                                                                                                                                                                    INLET ARRANGEMENTS




                                       \
                                          CATCH-DRAIN TO B1
                APPROXIMATE
                BOUNDARY TO
               NATIONAL PARK                 \
                               ~~C\-DF
                                         "~’’’’’.
                        SOUTHERN BIORETENTION TRENCH C1 b
                                         74m’ SURFACE AREA
                                                                                                                                                                                FLOW FROM OFF-SITE
                                     SEE DWG 11 08-155C-01-04
                                                                                                                                                                                AREA DIRECTED TO
                                         AND 1108-155C-01-05
                                                                                                                                                                                C1A BIORETENTION Trench
                                FOR GENERAL DESIGN DETAILS
                                                                                                                                                                                I   I


                                                        \
                                             CATCH-DRAIN TO C1b




CLIlI1IllIlS
                                                                   CefJrigllt ~h.,,,,,,,,,,"’1Io
CONTRAST CONSTRUCTIONS                ESSENCE OF PEREGIAN          .,_........,,..........,...
                                                                   ....,.....nyfllS&lwll’l"’......’"’
                                                                   ",ltUU.                               WATER & ENVIRONMENTAL ANALYSTS &
FOR THE                               STORMWA TER MANAGEMENT       OOMOTSCAlt:
                                                                   ~"""’,.etL""’ftI’IfW_                 CONSULTANTS
SCANLON PROPERTY GROUP                PLAN                         lIt.prtwt.....-.w.fll4
                                                                      _,..,_..,....,.,.,...,.s,.         "’:IINAI.fSTlm’.JIOCIUA~.
                                                                   ,...,......tiwI..,...w"...uttt."ri.   POIOX,..TQL.D’.AIJITWJ4
                                                                                                         PtI ""....                                                                                            ~
                                                                                                         fAllnllryf,’1ftIelping you make good dean water
                                                                                                                                                                                                               .

Section 36

                                                                                                                                115.J

                                           -<




       NORTHERN CATCHMENT




                                                                                                                                                                                                                OFFSITE CATCHMENT




                                                                                                                                                                                                                                     40          50




                 MID CATCHMENT




                                                                                                                                                                                                    HOTEUCOMMERCIAL
                                                                                                                                                                                                                   AREA


                                                ~


                                                    -....:




             SOUTH CATCHMENT
                 (STAGE 1)




    ClDTOCTIlS                 DlIWtE                        RE’l!S     SOIIlI.I                  6tNnIMtUI
                                                                                                                                                                                                         lIU\IN;l                       S(Al.E

    CONTRAS T CONS TRUCTIONS   ESSENCE OF PEREGlAN
                                                                                                \c."ritlltlll..-.-............_...
                                                                                                  ..,.__.       lKVt.’,...I1I INU,....
                                                                                                                                         Simmonds & Bristow Pty. Ltd.                                    PROPOSED PIPE
                                                                                                  ..."..,...".rAS,.....cn.... l
                                                                                                L .....,sr...
                                                                                                                                         WATER & ENVIRONMENTAL ANALYSTS &                                ROUTING AND
                                                                                                                                                                                                                                            AS SHOWN
    FOR THE                    STORMWA TER MANAGEMENT                                           J.OO.TSCAlf




~
    SCANLON PROPERTY GROUP     PLAN
                                                                13/01/12 GENERAL UPDATE
                                                                05/01/1 GENERAL UPDATE
                                                                19/12/1 INITIAL VERSION
                                                                      DATI    (IItOTS
                                                                                          TA
                                                                                          Ole
                                                                                                  ~lttlll..,t.t........,....
                                                                                                4. ....,...","",___.,-",
                                                                                                      ~t.lMr.,...t.t.S"
                                                                                                  ,..te:MWltMMt_tWf’Jlnt...tt.-,-
                                                                                                                                         CONSULTANTS

                                                                                                                                         UIIlE6IUUI’TlUT.1OCICI.tl4"
                                                                                                                                         PO lOX "’1’OCII5A QL 4*AUSTIAU\
                                                                                                                                         N I’7)m,*

                                                                                                                                         ’AXn"".’1Ifelping you make good dean water
                                                                                                                                                                                       ID
                                                                                                                                                                                      A.C.N. 010252418
                                                                                                                                                                                                         CA TCHMENT AREAS               _At..
                                                                                                                                                                                                                                          1108-155C

                                                                                                                                                                                                         IIU\IN;STA11ISFOR INFORMATION IMiNo.
                                                                                                                                                                                                         PlOT’_"        OATI,13/01l12   110B-155C-01-03
                                                                                                                                                                                                                                                          REV.

                                                                                                                                                                                                                                                            C
.

Section 37

  1=
   h
   ~
       0.5m


              ,.
                   2.OM



                          l.CIrI
                                   .~I                                                                                                                                                                                                                                     SCALE (nvn)


                                                                                                                                                                                                                                                                                                   110
                                                                                                                                                                                                                                                                           III   )01111                          I
                                                                                                                                                                                                                                                                          o              100                 200

                                                                  ,,- "
                                                                         /                 /’
                                                                      / _/ ’-<


                                                              "
                                                                  ’/

                                                                  //A
                                                                        /’
                                                                             ./




                                                                               ./
                                                                                       ,,~
                                                                                           !’!l


                                                                                                          0
                                                                                                                                                             /~8~
                                                              ’/
                                                             ;’
                                                                   ,,/
                                                                        ;"




                                                                         ’/
                                                                        /’
                                                                              i
                                                                                       .-<
                                                                                                      0
                                                                                                                                                                                                                           f5
                                                                   /              ,’,
                                                                                      J~
                                                                             ,,/
                                                              /’
                                                             ./
                                                                      ,/11           ,~;
                                                                                                                                                                                                   G-::\                             .

                                                                                   ~_;
                                                                   I’




                                                                                                  o
                                                                                                                                                                                                   ~~~1            ~~
                                                                                                                                                                                                                  _’
                                                                                                                                                                                                                               4
                                                    --< >-
                                                                                                                                                                                                     .~
                                                                  /          ,r’-<                                                                                                                                     400mm
                                                             ./Q) /            ’




                                                                   /
                                                                              ,t
                                                                               :I’            o
                                                             "          /’
                                                                        .

                                                                                                                                                                                            DETAIL A         -   ANTI SCOUR DEVICE GENERAL ARRANGEMENT
                                                         //                                                                                                                NOTES:
               <D                                                                                                                                                          1           WETLAND BUFFER TO NATIONAL PARK
                                                                                                                                                                           2           ROCK ARMOURED SPILLWAY, 1m BASE WIDTH, 1:3 GRADE WALLS IN GRASSED
                                                                                                                                                                                       BAHER AT 1:4 SLOPE WITH ROCK APRON                            -
                                                                                                                                                                                                                                                         SUBJECT TO DETAIL DESIGN
                                                                                                                                                                           3           BIORETENTION TRENCH
                                                                                                                                                                                       SANDY LOAM FILTER MEDIA, 60% OA5mmES, 150mm/hr HYDRAULIC
                                                                                                                                                                                       CONDUCTIVITY
                                                                                                                                                                                       <1000mg/kg TOTAL NITROGEN, <80mg/kg ORTHOPHOSPHATE, -3% ORGANIC
                                                                                                                                                                                       MA HER CONTENT
                                                                                                                                                                                       PERVIOUS GRAVEL BASE, 200mm DEPTH, 5-20mm ES GRAVEL
                                                                                                              DETAIL A
                                                                                                              SEE INSET
                                                                                                                                                                                       IMPERVIOUS GEOMEMBRANE SIDE-WALL LINER
                                                                                                                                                                                       SEE DRAWING 1108-155C-05 FOR MORE DETAIL
                                                                                                                                             A                                         SUBJECT TO DETAIL DESIGN
                                                                                                                                                                           4           PIPED INLET FROM STORMWATER DRAINS WITH ANTI-SCOUR DEVICE SEE                                                     -




                                                                                                                                                                                       DETAIL A
                                                                                                                                                                               5       BIORETENTION TRENCH EDGE SHEET-FOW ANTI-SCOUR DEVICE, 65mmES RIVER
                                                                                                                                                                                       ROCK IN GEOTEXTIE               -
                                                                                                                                                                                                                           SEE DRAWING 1108-155C-05 FOR MORE DETAIL
                                                                                                                                                                               6       INTERCEPTOR DRAIN/SWALE INLET TO BIORETENTION TRENCH
                                                                                                                                                                                       SEE DRAWING 1108-155C-05 FOR MORE DETAIL
                                                                                                                                                                           7           BOLLARDS TO SUIT SITE AESTHETICS
UlJIllUAlS                               .Il61Wl1                                                                                DAM

CONTRAST CONSTRUCTIONS                   ESSENCE OF PERIGIAN
                                                                                                                                                      \
                                                                                                                                                           51?==::,:.:;r.~. Simmonds & Bristow Pty. Ltd.                                                    ;~~:E~NTION TRENCH S(!lAE S SHOWN                               .
                                                                                                                                                           .."""""_lIIun
                                                                                                                                                      ,"""""
                                                                                                                                                                                        WATER&ENVlRONMENTALANALYSTS &CONSULTANTS                            LAYOUT GENERAL
FOR THE                                  STORM WATER TREATMENT                                                                   [l(SIiHED       lA   1
                                                                                                                                                                           .       .




                                                                                                                                                           =~._.........

                                                                                                                                                                                                                                           ID
                                                                                                                                                                                                                                                            ARRANGEMENT                        J/PllIJ’OSIlHo.
                                                                                                                          TAIl!AW                lA
SCANLON PROPERTY GROUP                   DESIGN                                                                                                                                                                                                                                                                             ~
                                                                                                                          T
                                                                                                                          T
                                                                                                                                 (l(0I!0

                                                                                                                                 S
                                                                                                                                             OJB
                                                                                                                                                      ..
                                                                                                                                                           =::;"’~h-!:."..
                                                                                                                                                      1.........___........
                                                                                                                                                                                         ’*I  SlI&l.MOW4.
                                                                                                                                                                                         "..,...........’M~
                                                                                                                                                                                                                                           ,                ~AWMiSTATUS
                                                                                                                                                                                                                                                                                                 11 0 B-1 sse
                                                                                                                                                                                                                                                                                               MHo.                  REV.
                                                                                                                                                                                         :.::::                                                                           CONCEPT ONL Y
                                                                                                                                                                                                                                                                                                                       C.
                                                                                                                                        .



                                                                                                                                                                                                             .



                                                                                                                          Nil.                                                                            He{ptngyou makegood~’.~-
                                                                                                                                                                                                                           ~,.-                                                                1108 lSSC 01 04
                                                                                                                                 OllE                                                               ...

                                                                                                                                                                                                                                         A.CJt 010 252418   PlOIlU’ln         011&13/01/12
                                                                                                                                                                                                                                                                                                     -       --

Section 38

                                                                                                                                                                                                                                                                                                                                                                                  ..


                                                                                                                                                                                                                                                                                                                                                                                  !
                                                                                                                                                                                                                                                                                                           RL 4.00 DWELLING FFL MIN


                                                                                                                                                                                                                           @
                                                                                                                                                                                                                                                                           OWELUNG PAD ""’0
                                                                                                                                                                                                                                                                                                  ~N      r     ....             .,
                                                                                                                                                                                                                                                                                                                                   .                            st.   .
                                                                                                                                                                                                                                                                                                                                                                                  ..




                                         RL 3.20
                                                    RL 3.25
                                                   T.          __
                                                                                        RL 3.35
                                                                                               .,
                                                                                                               It

                                                                                                               1
                                                                                                                       0.6m            0.5m                                                    2.9m




                                                                                                                                                                                                                         fl
                                                                                                                                                                                                                                                        l’   RL 3.35
                                                                                                                                                                                                                                                             Y..
                                                                                                                                                                                                                                                                                                      @
                                                                                                                                                                                                                                                                                                           t             -I
~                                                        @                                          @          c:::                                             ~on                                         ’-’.




                                                                    (j)~1
                                                                                                                                                                       ~~..
                                                                                                                                                                                                                          ’.’




                                                   E

                                                   ~                            <D                                                      @
                                                                                                                                                                             ~’                                    \1V

        RL 2.50 (NGL)
                                                   ,._
                                                                                                                .                                                         -;:-                  "’-oETAILA
                                                                                                                                                  RL 2.50                  <D
                                     CD                                                                                                                                                                  SEE INSET
.......".Y.___.."..._......._._.."

                                                                                        -==~~-.~ ._.=====..:~.===~=.__=
                                                         ...   -----




                                                                       RL

                                                                            2.3~:~..~                           I                                                                                                                                       SCALE
                                                                                                                              3m
                                                                                l
                                                                                                                                                                                                                                                                       O.5m


                                                                                                                                                                                                                                                     Om                          1.0m                            2.0m                                      3.0m

  SECTION ’A-A’ BIORETENTION TRENCH CROSS-SECTION
                                     -




   NOTES:
   1       EXISTING HEATH WETLAND BUFFER TO NATIONAL PARK
   2       ROCK ARMOURED SPILL WAY (3OF), 1 m BASE WIDTH, 1:3 SLOPE SIDE WALLS. SUBJEOTTO DETAIL
           DESIGN
   3       ~~ET~OOffi~
           500mm FILTER DEPTH
           SANDY LOAM FILTER MEDIA, 60% 0.45mmES, 150mmlhr HYDRAULIC CONDUCTIVITY, <1 OOOmgillg TOTAL
                                                                                                                                                                                                                                                                                                                                         i
           NITROGEN, <80mgillg ORTHOPHOSPHATE,-3% ORGANIC MAnER CONTENT                                                            .
                                                                                                                                                                                                                                                                                                                                      ,      .                    ’L\
                                                                                                                                                                                                                                                                                                                                                           L’
           200mm EXTENDED DETENTION DEPTH                                                                                                                                                                                                                                                                                                .




                                                                                                                I
           SUBJECT TO DETAIL DESIGN
   4       IMPERMEABLE GEOMEMBRANE SIDE.WALL LINER                                                                                                                                                                                                                 @
   5       PERMEABLE GRAVEL BASE LAYER. 200mm DEPTH, 5-20mmES NO.FINES COARSE GRAVEL                                                                                                                                                                                   ~


                                                                                                                                                                                                         cv en \ J,
   6       BIORETENTION TRENCH PLANTINGS. TURF SPECIES SUITABLE FOR INUNDATION. SOlJ,RCE
                                                                                                                                                                  (!)                                                                                                  (~
           SUITABLE PLANTS FROM APPENDIX A OF THE WATER SENSITIVE URBAN DESIGN                                                                                                                                 E

   7       INLET ROCK DIFFUSER                                                                        MANjL                                                       ’
                                                                                                                                                                                                        ,
                                                                                                                                                                                                              ~                                                                          L’
   8       STORM DRAIN INLET ENERGY DIFFUSER. SEE DETAIL A                                                         ,                                                                                                                                                                                      L’
                                                                                                                                                                                                                                                                                                                          L’
   9       STORM DRAIN INLET PIPE                                                                                                                                                                                                                                      -
                                                                                                                                                                                                                                                                                                                                                 L
                                                                                                                                                                                                                                                                                                                                                                 ’"
           500mm DEPTH OF COVER TO BE MAINTAINED WHERE POSSIBLE                                                                                                                                                                 @                                                             E
                                                                                                                   I
           WHERE HYDRAULICS REQUIRE LESS THAN 500mm DEPTH OF COVER, PIPE TO BE CONCRETE CASED
                                                                                                                                              E
                                                                                                                                                                                                                                                                                              ~
           WITH 200mm DEPTH OF COVER
   10
                                                                                                                   .




                                                                                                          1:51ARI STORM                   ",,8                                                                                                            400mm
           GRASSED CATCH DRAIN (SWALE),200mm DEEP 1:130 FALL ALONG LENGTH TO SUIT
           EVENT                                                                                                I                                                                                                                                                                                              SCALE (mm)
           TRAILING EDGE TO BE FILLED TO PROVIDE 200mm DEPTH AND TO ACCOMMODATE FALL TO


   11
   12


  13
           BIORETENTION TRENCHES
           BOLLARDS TO SUIT SITE AESTHETICS
           DWELLING PADS. 3.5mRL MINIMUM TO 6.0mRL
           BIORETENTlON TRENCH C1A LOCATED AT 4.0mRL
           GRASSED BAnERAT 1:4 GRADE
                                                                                                                                                  ~
                                                                                                                                                          L
                                                                                                                                                         "I
                                                                                                                                                                           250mm
                                                                                                                                                                                                      ~                                                                                                                  50


                                                                                                                                                                                                                                                                                                                                   100
                                                                                                                                                                                                                                                                                                                                                     150


                                                                                                                                                                                                                                                                                                                                                                200



   14      INLET ROCK DIFFUSER GEOTEXTILE WRAPPER                                                                                                                       DETAIL A         -
                                                                                                                                                                                             SCOUR PROTECTION DEVICE GENERAL ARRANGEMENT
   ALL RL’S IN mAHD. DIMENSIONS AS MARKED. FINISHED GROUND LEVELS ARE INDICATIVE O.NLY AND
   SUBJECT TO FINAL ADJUSTMENT ON SITE
(LENT IIElAll                                            JOONAHI                         IIt:vlIIINlOfIll.lE                                             DATUM                                                                                                                                         IN!AWlNGTlTLE                             I(AlE

 CONTRAS T CONS lRUC liONS                                ESSENCE OF PERIGIAN
                                                                                                                                                                  ..




                                                                                                                                                                             ’~E=~?~’;~’ Simmonds & Bristow Pty. Ltd.                                                                                     BIORETENTlON TRENCH
                                                                                                                                                                                                                                                                                                                                                      ASS HOW N
                                                                                                                                                                             ~ :?-_:’::’:’:t..k’~"M,.....1t              WATER & ENVIRONMENTAL ANALYSTS &CONSUlTAHTS                                      SHORT CROSS-SECTION
 FOR THE                                                  STORMWA.lER TREATMENT                                                                          DEmlED    TA




                                                                                                                                                                                                                                                                                    . ,llIt:v.
                                                                                            13/01/11 GENoRAL UPOA TE                              TA DRAWN         TA
                                                                                                                                                                                                                                                                                                          SECTION A-A                            118/_OSALNo.
 SCANLON PROPERTY GROUP                                   DESIGN                                                                                                             ~.   "",~II"’"",,"t.s’.r.
                                                                                                                                                                                                                                                                                                          GENERAL ARRANGEMENT                        1108        -
                                                                                                                                                                                                                                                                                                                                                                          155 C
                                                                                            06/0111 GENERAL UPOA TE                               TA (I((KED      018             I’UIllul..’...f.,.,_....Iht-n.         UI(QW.OSTIUT,IIQ(kl.(A’IM
                                                                                                                                                                             1. AIl-..-".._onmol....ltf’..
                                                                                                                                                                                                                         I’OIOX)lWYUlt’lGAIItJI’.AUS~                                                      AWlHGSTATUS                           DWG.No.
                                                                                         1,ll1911111 INITI)\L VERSION                             TA I~HED.                                                              PtlIIf1In.,.                                                                                    CONCEPT ONL Y
                                                                                                                                                                                                                         ’" ,0>.....
                                                                                         E     DATE        CDHI’lNTS                              IITL   DATE                                                                                 HeIpirG
                                                                                                                                                                                                                                             ...        you make good doan_       A.C.N. 010 252418                                                  110B-155C 01-05         C
                                                                                                                                                                                                                                                                                                       PlDT hlJHBER           DATE,13/01l12

Section 39

~~
t




                                                 ~,~           ’LON
                                                              NOR’"




                                                 c^’~       FLOWtollO




              NOOSA
                                                                                         NOO5’
             NATIONAl..
                                                                                        NATIONAL
               PARK
                                                                                         PARK




                          STAGE 1 TREATMENT TRAIN                                                                            FULL DEVELOPMENT TREATMENT TRAIN


     (If)(1IETAlS                  DN.IIf                   fEVlSDCSOfIUE                                    ..,"_ta;                                                                                                   Il!AWN;TIll.E                     S(Al!

     CONTRAST CONSTRUCTIONS        ESSENCE OF PEREGlAN
                                                                                                         \   ~11II.__Ih,"""""’’’’’
                                                                                                             ."._... __’M"_ "’-lIMIt......
                                                                                                                                                       Simmonds & Bristow Pty. Ltd.                                     PROPOSED STORMWATER
                                                                                                             ftIt.....,_-ty,f S......... UlItHMftlIf
                                                                                                         1. viii’&-"                                                                                                    TREA TMENT TRAIN
                                                                                                                                                                                                                                                             AS SHOWN
     FOR THE                                                                                                                                           WATER & ENVIRONMENTAL ANALYSTS &
                                   STORMWA TER MANAGEMENT                                                1. 00 lilT SOU




                                                                                                                                                                                                      ID
                                                                                                   TA        .......1enb..tc.t.....III’ifW..           CONSULTANTS                                                      DETAILS                             lPRIJ’OS.llllo,
     SCANLON PROPERTY GROUP        PLAN                                                                  ..IIh....,t.ttw_._’III....,..                                                                                                                      110S-1SSC
                                                                                                   DJ8     ,..,~I...,..,..tllllt.S"1                   4f-.....otnlUT.MICJCl..U4.
                                                                                                             ,.,,...IItIII!M1’...~"’"-.-k.             "’_""l’OION5ot.GlO,*AIlS.,.,..                                   Il!AWN;STAM                       Milo,               RIV,
                                                              05/0111 INITIAL VERSION                                                                  "’" WIll"’’’’                                                                    fOR INfORMATION
                                                                OAT!    [IJIOIS                                                                        h.X""~.’1’felp ng you make good clean water   Ae.N. 010 252418   PlOTIUIlIl<        DAThOS/01l12   1108-155C -01-06     A

Section 40

  ,

     ~

             ,(.

             ’"
        .,




                                   MUSIC
                   u



                                                                               "
                       ~




                                                              APENDIX
                                                       .




                                                                        ..N
                                                        "



                                            .

                                                                         ’lh
                                   Ni       t"J’
                                                                                           ,
                                                                                                ;;,
                                                                                                           ,..
                               f
                                                     ~.j.~                            "\


                                                         ,"
                                                                                                          ~

                                            \
                               ,1                                                                   ~


                                                                               "’-~
                               !




                                                                                                    ~.




-$?Ji/.f’!,"
                       "’

                               <
                                   EL ING
                                   .
                                              ...

                                                    "
                                                              B:
                                                                                      (
                                                                                           ~;.’!~
                                                                                                      .-"_, .
                                                                                                ,\~ 1>&’:~’
                                                                ",\
                       I’~))   .
                                                    ~\/l ,)
                                                          ;’("1
                               !    \
                            j
                             tl
                                   \


[OCR of page images]
APPENDIX B:

MUSIC MODELLING

Section 41

                                                                                                               .




                    STAGE 1 MUSIC MODEL SUMMARY




                                                                                      ~
                                                                                  NO<fhem Gr>:1Jnd




                                              ~
                                            Sy.’ilfe~,




                                                                                      ~
                                              ~                                    Michl" Grc<lnd


                                         e .,.Reler."JC<n 9.1




   II
Rec<:rr.-.g t~ode




                                                                        ~                      ~
                                       ~
                                !Br..of’l.le>nl;.,n C 18
                                                                 GhOo01: T"",b Sootl!     :on"""Room Soulll




                                                           ’.



                                                                ""
                                                                        ’[jJ
                                                                     Scujh_Hn GrC\llild


                                                                      "\,\

                                                                         ~                      ~
                                       ~                         Rain Tank Cammerc :tl     R~txlr.3nt R.oesf
                                                                                                      N




                                Sr...f’letenlian C 1A


                                                                                  -~
                                                                                    c..r~ort



                                                                                  ~
                                                                                   Olr.




           Figure B-2: MUSIC Model Diagram                 -
                                                                Stage 1 Only


[OCR of page images]
STAGE 1 MUSIC MODEL SUMMARY

 

 

 

 

©

Noxthem Ground

 

 

ey

Swate Noeth:

 

 

ci a

Bic-Reterace B1

 

 

 

 

 

 

Receiving Node

 

 

 

 

a ©

a Shack Tanks South Shack Roofs South

e

Southern Ground

eo §

Rain Tank Commercial Restaurant - Roof

Bio-Retention C14

 

 

 

 

 

Bio-Retention C18

 

 

 

 

 

 

 

 

 

Figure B-2: MUSIC Model Diagram — Stage 1 Only

 

Section 42

                                                    STAGE 1 ONLY MUSIC MODEL INPUT PARAMETERS

                                                I
                                            Table B-1: Stage 1 MUSIC Model Input Parameters                              -
                                                                                                                             Sources (A)
                                                                                                                Commercial
MUSIC Model Inputs for the Essence of Peregian:                                                                                         North       Mid              South
                                                                       Commercial (hotel)                   Podium (rest.,
Stage 1     "                                                                                                                          balance    ~alance           balance
                ,                                                ~’,
                                                                                                                  shops)          ’"



Size (ha)                                                                           0,254                         0,0915               0,5345     0,7057             0,296
% Impervious                                    I                                    40                             40                   11          0                 0
Rainfall threshold (mm/day)                     I                                    1                              1                     1          1                 1
Soil storaQe capacity (mm)                      1                                   120                            120                  400         400               400
Initial storage (%of capacity)                  I                                    25                             25                   10          10               10
field capacity (mm)                             j                                    80                             80                  200         200        ,
                                                                                                                                                                      200

infiltration capacity coefficient   -
                                        a        j                                  200                            200                   50          50               50
infiltration capacity exponent   -
                                     b           (                                    1     ’-...-’
                                                                                                      t.
                                                                                                                    1                     1           1                1
initial depth (mm)                               (                                   50                             50                   50          50               50

daily recharQe rate_(%)                          I                      ,
                                                                                ,    25                             25                   25          25               25
                                                                            ,




daily baseflow rate (%)                          1                                  ’5                              5                     5          5                 5

daily deep seepaQe rate (%)                                                          0                              0                     0          0                 0
TSS Base flow cone, Params (Mean,Std Dev) (log mULl                             0,78,0,39                        0,78,0,39             1,0,34      1,0,34           1,0,34
TSS Storm flow cone, Params (Mean,Std Dev) (log mULl                            2,16,0,38                        2,16,0,38         2,18,0,39     2,18,0,39         2,18,0,39
TP Base flow cone, Params (Mean,Std Dev) (loQ mULl                               -0,6,0,5                        -0,6,0,5         -0,97,0,31     -0,97,0,31        -0,97,0,31
TP Storm flow cone, params_(Mean, Std Dev) (log mULl                            -0,39,0:34                      -0,39,0,34        -0.47,0,31     -0.47, 0,31       -0.47,0,31
TN Base flow cone, Params (Mean,Std Dev) (log mULl           ~                  0:32,0,3                   ""
                                                                                                                 0,32;’0,3             0,2,0,2    0,2,0,2           0,2,0,2
TN Storm flow cone, Params (Mean,Std Dev) (log mULl                             0,37,0.4                         0,37,0.4          0,26,0,23     0,26,0,23         0,26,0,23

Section 43

                                                                                                Roof Restaurant


                                                                                                            0.111

                                                                                                            100



                                                                                                            400

                                                                                                             10

                                                                                                            200

                                                                                                             50



                                                                                                             50

                                                                                                             25

                                                                                                             5

                                                                                                             o

                                                                                                           1,0.34
                                                                                                          2.18,0.39
                                                                                                      -0.97,0.31
                                                                                                      -0.47,0.31
                                                                                                           0.2,0.2
                                                                                                          0.26,0.23

                                                                                                ~

Table B 3 Stage 1 MUSIC M odeIInputP8rsmeters- TreatmentoeVlces (A)
         -




     Treatment devices and parameters                                                         Rain tank Restaurant

     Low flow by-pass (m3/sec)                                                                               0
                                         -


                                                               ’\                .

     High flow by-pass (m3/sec)              \..      ~         ’\                              \           100

     Volume below overflow pipe (kL)               ’’{’"        ~\                        ,
                                                                                                _<   ’l     100
                                                      ,              I                    ,
     Depth above overflow (m)                                                                                0.2
                                                       ,                 ,

     Surface area (m2)                                j              "r                                      5
                                                           -




     Overflow pipe diameter (mm)                                     /                                      150
                                                                                                     ,



     Anunal demand 9kUyr)scaled by daily PET                         -"""-""",.~"..             -’           0

     Daily demand (kUday)                                                                                  7.633

     Monthly distribution of annual demand (kUyr)                                                            0




Table B-4: Stage 1 MUSIC Model Input Parameters                                           Treatment Devices (B)
                                                                                          -




                                                                             Blo-retentlon                   Blo-retentlon
       Treatment devices and parameters
                                                                                 C1A                                C1B

  Low flow by-pass (m3/sec)                                                           0                              0

  High flow by-pass (m3/sec)                                                      100                               100

  Surface area (m2)                                                               52                                 37

  Extended detention depth (m)                                                    0.2                               0.2

  Seepage loss (mm/hr)                                                                0                              0

  Filter area (m2)                                                                63                                74

  Filter depth (m)                                                                0.5                               0.5

  Filter median particle diameter (mm)                                           0.45                               0.45

  Saturated hydraulic conductivity (mm/hr)                                        150                               150

  Depth below underdrain pipe (%of filter depth)                                      0                              0

  Overflow weir width (m)                                                             3                              3

Section 44

  Table 8-5 Stage 1 MUSICM odeIInput Parameters- Treatment Devices (C)
                     Treatment devices and parameters                                                        Swale North

              Low flow by-pass       lm3/sec}                                                                              0

              HiQh flow by-pass (m3/sec)                                                                                   100

              Length em)                                                                                                   25

              Bed Slope (%)                                                                                                1.0

              Base Width (m)                                                                                               0.1

              Top Width (m)                                                                                                5.0

              Depth (m)                                                                                                    0.5

              Vegetation Height (m)                                                                                       0.25

              Exfiltration Rate (mm/hr)                                                                                    75




                         STAGE 1 ONLY MUSIC MODEL OUTPUTS

                                                                                                                 .


        Table 86 Stage 1 MUSIC M odeI
                 -
                     .

                     .
                                                         -        Treatment Tram Eftecf
                                                                                      Iveness


    Treatment Train Effectiveness                   Sources                                  Residual Load                       % Reduction

Flow (MUyr)                                                       13                                                11               15
Total Suspended Solids (kg/yr)                              2420                                               567                   77
Total Phosphorus (kg/yr)                                        5.9                                  .
                                                                                                                 1.8                 69
Total Nitrogen (kg/yr)                         ,                  33                                 "
                                                                                                                    18               46
Gross Pollutants (kg/yr)                                       214                                                  0                100
                                           ~




                                                                                                     !~~
                                                                                                         ?
                                                                                            ..,.t;
                                                    .’"                                        ~’.. 4’1’      ~
                                                                                                                     ,.




                                                                                               ~,            .
                                                                                                                    ’f;


                                                                                                                      "




                                                            /:’
                                                    ;

                                                               ;.}/!                                          )’;
                                                                                                                      ,"




                                                                   ’----:JI ~~,,,,,,,,,,,, lJ!
                                                                             -
                                                                       ,,.
                                -:        -::’-":   t              .

                                                                                             ~
                           .~
                                                        1\11                ~
                                     ;!                                          L~-";:’!                ’~
                                                        "
                                                            1.l}-’~=~_ ~_..,,~~ ~             "’-’

Section 45

       FULL DEVELOPMENT MUSIC MODEL SUMMARY




                                                                 ,/~                                              ~
                                                          /,’RaUl Tank B,ld A                                  Roof Building A




                                         ,~~’---
                                     B,o-Retantlon Al
                                                                                                       ~
                                                                                                    Northem GrouM




                                                                                ’~ --~
                                                                  Shack Tanks North                        Shack Roofs North




                                                                      ,,.,.’
                                                                                 /~                             -_



                                                                                                                          ,




                                                                ,,-            Shack Tanks Mid                 Shack Roofs Mid
                                                           ./
            I."




   _,                                  .oo:~-~."..,’-"""-,----,                                        {~
Receiving Node’,.                  Bio-Retenlion   B"""--’~,~,                                       MJ<fC1le Ground




                                                                        ’"..~                                        ~
                                                                           Ratn Tank Bid B                      Roof BuiJa.ng B




                                                                     ___-JQL
                                                                        ~                                       ,~
                                       ’FQ1.-----~..-                   ShaCk Tanks South                      Shack Roofs South
                                        ~""
                                   BiD-Retention G 1B -"’~-"

                                                                          ’-"

                                                    "’’-.,.",                    ....-#.


                                                                                           ~
                                                                ’.
                                                                 "
                                                                                           ~.’,
                                                                                           ,




                                                                      "
                                                                            Soulhern Ground
                                                                           "\.

                                                                                ""’’’’

                                                                                           ~                    --




                                                                                                                     &I
                                        00t
                                   Blo-Retention CIA’,
                                                                       Rain Tank Commercial                     Restaurant. Roof




                                                         "_
                                                                "

                                                                  "                  ’---"---13
                                                                                  ",                  Carpafk
                                                                                    ",
                                                                                               ",




                                                                                                ""’&1
                                                                                                     Otfstte


         Figure B-2: Full Development MUSIC Model diagram

Section 46

                                                                                                                                                                                        -
                                                                                                                                                                                   I:




                                                                DEVELOPMENT MUSIC MODEL INPUT PARAMETERS
                                                        FUlL
                                                  Table B-7: Full Development MUSIC Model Input Parameters                      -
                                                                                                                                 Sources (A)
                                                                         &            ill                      Commercial
        MUSIC Model Inputs for the Essence of Peregian: Full                                Commercial                                           ~
                                                                                                             Podium (carpark,   North balance        Mid balance   South balance
                                 Development                                                 (Offsite)
                                            ,’1                                                                  shops)
Size (ha)                                                                                     0.278               0.205               0.389             0.335          0.146
% Impervious                                               1                                    80                 80                  11                11             11
Rainfall threshold (mm/day)                                ,                                    1                   1                   1                 1              1
Soil storage capacity (mm)                                 I                                   120                 120                 400              400             400
Initial storage (%of capacity)                             J                                    25                 25                  10                10             10
field capacity (mm)                                        I                                    80                 80                  200              200             200
infiltration capacity coefficient   -
                                        a                  I                                   200                 200                 50                50             50
infiltration capacity exponent   -
                                     b                                                          1                   1                   1                 1              1
initial depth (mm)                                         .                                    50                 50                  50                50             50

daily recharge rate (%)                                    I                                    25                 25                  25                25             25

daily baseflow rate (%)                                    j                                    5                   5                   5                 5              5

daily deep seepage rate (%)                                                                     0                   0                   0                 0              0

TSS Base flow conc. Params (Mean,Std Dev) (log mULl                                          0.78,0.39          0.78,0.39            1,0.34            1,0.34         1,0.34
TSS Storm flow conc. Params (Mean,Std Dev) (log I"(lUl)                                      2.16,0.38          2.16,0.38           2.18,0.39         2.18,0.39      2.18,0.39
TP Base flow conc. Params (Mean,Std Dev) (log            mULl                                -0.6,0.5            -0.6,0.5           -0.97,0.31       -0.97,0.31      -0.97,0.31
TP Storm flow conc. Params (Mean,Std Dev) (log mULl                                         -0.39,0.34          -0.39,0.34          -OA7, 0.31       -OA7,0.31       -OA7,0.31
TN Base flow conc. Params (Mean,Std Dev) (log m~l)                 p-’"’-""’--"""""          0.32,0.3    ~       0.32,0.3            0.2,0.2           0.2,0.2        0.2,0.2
TN Storm flow conc. Params (Mean,Std Dev) (log mULl                   ;;,;
                                                                               -




                                                                                             0.37,OA             0.37,OA            0.26,0.23         0.26,0.23      0.26,0.23
                                                                                                ~

Section 47

                                            Table B-8: Full Development MUSIC Model Input Parameters                              Sources (B)
                                                                                                                                  -




    MUSIC Model Inputs for the Essence of Pereglan                                                                Shack roofs     Shack roofs     Shack roofs     Roof
                      Full Development
                                                            RoofBldg A                            RoofBldg B            North           Mid         South       Restaurant

Size (ha)                                                         0.155                                0.155            0.077          0.037         0.077         0.19
% Impervious                                                       100                                      100          100            100           100          100

Rainfall threshold (mm/day)                                          1                                       1            1              1             1            1

Soil storage capacity (mm)                                         400                                      400          400            400          400           400

Initial storaQe (%of ca!)acity)                                     10                                      10            10             10           10           10

field capacity (mm)                                                200                                      200          200            200          200           200

infiltration capacity coefficient   -
                                        a                           50                                      50            50             50           50           50
infiltration capacity exponent   -
                                     b                               1                                       1            1              1             1            1

initial depth (mm)                                                  50                                      50    "’.     50             50           50           50

daily recharQe rate (%)                                             25                                      25    :       25             25           25           25
                                                                                                                  ’"
daily baseflow rate (%)                                              5                                       5            5              5            5             5

daily deep seepage rate (%)                                          0                                       0            0              0            0             0

TSS Base flow cone. Params (Mean,Std Dev) (log mUl)               1,0.34                               1,0.34           1,0.34         1,0.34       1,0.34        1,0.34
TSS Storm flow cone. Params (Mean,Std Dev) (log mULl            2.18,0.39                             2.18,0.39       2.18,0.39       2.18,0.39    2.18,0.39    2.18,0.39
TP Base flow cone. Params (Mean,Std Dev) (log mULl              -0.97,0.31                        -0.97,0.31       -0.97,0.31     -0.97,0.31      -0.97,0.31    -0.97,0.31
TP Storm flow cone. Params (Mean,Std Dev) (log mULl             -0.47, 0.31                       -0:47,0.31       -0.47, 0.31    -0.47,0.31      -0.47, 0.31   -0.47,0.31
TN Base flow cone. Params (Mean,Std Dev) (log mUl).              0.2,0.2                               0.2,0.2          0.2,0.2        0.2,0.2      0.2,0.2      0.2,0.2
TN Storm flow cone. Params (Mean,Std Dev) (log mULl             0.26,0.23                             0.26,0.23       0.26,0.23       0.26,0.23    0.26,0.23    0.26,0.23


                                                                               ’’’,!;II   1       ~


                                                                         ...
                                                                                              ~         Q



                                                                         .Iq’=
                                                            .                  .


                                                            !’    ~"-’ .~...-~-"

Section 48

                                                                                                                                  -
                                                                                                                                  ,




       Table B 9 Fu II Deve opment MUSICM odeI Input Parameters
                    -
                        .

                        .
                                                                                                  -
                                                                                                   Treatment Units
     Treatment devices and parameters                           Bloretentlon       Bloretentlon    Bloretentlon    Bloretentlon
               Full Development                                    C1A                C1B              B1              A1

Low flow by_-pass   (m3/sec)                                         0                  0               0               1

High flow by-pass (m3/sec)                                         100                 100            100              100
Extended detention depth (m)                                        0.2                0.2             0.2             0.2
Seepage loss (mm/hr)                                                 0                  0               0               0
Filter area (m2)                                                    63                 74              81              95
Filter depth (m)                                                    0.5                0.5             0.5             0.5
Filter median particle diameter (mm)                               0.45               0.45            0.45            0.45
Saturated hydraulic conductivity (mm/hr)                            150                150             150             150

Degth below underdrain pipe (%of filter depth)                       0                  0               0               0
Overflow weir width (m)                                              2                  3               3               3


                               FULL DEVELOPMENT MUSIC MODEL OUTPUTS

                                                                                                  .

         Ta ble B 10 Fu II Deve opment MUSIC M odeI
                        -                                                      Treatrnent Train Eftecf
                                                                               -
                                                                                                      Iveness
                                                    ~




          Treatment Train Effectiveness                           Source           Residual Load       % Reduction

        Flow (ML/yr)                                                 19                     13               30
        Total Suspended Solids (kg/yr)                             3790                  451                 88
        Total Phosphorus (kg/yr)                                    8.5                     1.8              79
                                                    -   .



        Total Nitrogen (kg/yr)                      .
                                                                     46                  20,3                56
                                       u
                                            to’]"           +
        Gross Pollutants (kg/yr)       "~    ~
                                                                    387                      0               100

Section 49

                                                                                                                                               ,


                                                                                                                                               J




                                                                                                           ...

                                                                                    "
                                                                                                     J
                          l"            :                                           $,..
                               ~
                          ,.            I                           ~:’ j        1I;:~~                              _’

                                                        !
                                                                  ,...1. _’.;.
                          \        ’
                                        \
                                        ,
                                                            .                                      ..,._


                                                                                                                 ’\~. l\
                                              ~’l                                                                     I
                                                                                                                                  ’




                                                                                                                                      ~J
                                     APPENDIX C:                                                                     }       _’       /
                                            ~ ~’.       ~ >’.~.-                                             ~-/             .    {
                                                            ’.   ’^’

                         ~-:~, ,’\            \~.   r




SEDIMENT AND EROSION CONTR l F?LAN DAilY
                                        CHECKLIST                                                                            r, ’1
                                                        / ’.      .-.,

                                                                                                                                           /
                                                    ,       !
                                                                                                                                       /
                                   ..
                                                                       "’"                :t
                                                                                                        ?                         ~/
                               .
                                                                             V
         I                                                                                                                        ;’

         ~~       ~;.;:
                               11]
                                                    _..
                                                                             ,       ,


                                                                                                                 ._’ "....
              ~
                                                                 ,t1!.!3’"                     ~
                                                                                                    .


[OCR of page images]
 

APPENDIX C:

SEDIMENT AND EROSION CONTROL PLAN DAILY
CHECKLIST

 

Section 50

                                                                                                                                                     -




-~
I
     EROSION AND SEDIMENT CONTROL
     DAILY SITE CHECK LIST
    C   ’()lllrolling \rorl1\\.Jter pollution on your building site


    Location of site


    Site Supervisor



    It is suggested that the site
                                              supervisor completes the following checklist daily while site work occurs.
I
                                                                                                                             TIMIN
                                                                                                                             ....
                                                                                                               ~     a.             m
                                                                                                     s:’                     =r
                                                                                                                                         ::0   (")


I                            ,
                                  ITEM AND/OR LOCATION TO CHECK                                      ;::j.
                                                                                                     0
                                                                                                     -
                                                                                                               Q
                                                                                                               """
                                                                                                               .,
                                                                                                                     c

                                                                                                                     ~ g
                                                                                                                     _.


                                                                                                                     o
                                                                                                                     =>
                                                                                                                             IQ
                                                                                                                             =r
                                                                                                                                    ..

                                                                                                                                    g.
                                                                                                                                    a.
                                                                                                                                    ..
                                                                                                                                         0
                                                                                                                                         !:t
                                                                                                                                               0
                                                                                                                                               3
                                                                                                                                               "0
                                                                                                                                               ~
                                                                                                                             0      ’<         <to
                                                                                                     ~               0       c
                                                                                                     0               .....
                                                                                                                                    I          0
                                                                                                                             ....
                                                                                                                                               ::J
                                                                                                     a-                      ....
                                                                                                                             =r


I        a.       Have the tradespeople and suppliers been made
                                                                         aware of the
                                                                                                                             I




                  requirements for erosion and sediment control, and the consequences
                  involved if there is a breach?

         b. If required, has an Erosion and Sediment Control
                                                                         Management Plan been
              prepared and approved?
              0     Are all contractors and subcontractors aware of the
                                                                           contents of this plan?

         c.   Is the builder’s sign displayed?


        d. Are the sediment fences erected
                                                       adequately/correctly?
              NOTE:

              .     Geotextile sediment fence buried at least 200 mm below
                                                                                  ground.
              .     Posts installed at minimum 2m
                                                      spacing.
              .     Built up sediment should not exceed 1/3 of the
                                                                     height of the sediment fence.
              0     No tears or rips.
              0     Not laying down or covered over
                                                        by materials.
              0     Is there an advisory/attention
                                                     sign on the sediment fence?
        e.    Is the stabilised entry/exit
                                                point (rumble pad) in the correct location?
              NOTE:

              0    Are all tradespeople/suppliers
                                                     using this entry point?
        f.    Does the entry/exit point (rumble
                                                       pad) require maintenance?
              NOTE:

              .    Has the entry/exit pad got excessive sediment in it?
              0    Turn over with a machine to
                                                  expose the coarse aggregate again.
              .
                   Aggregate must be 40 mm or greater.
              .    Is there a bunding/diversion drain above the stabilised
                                                                               entry/exit point
                   (rumble pad) to divert sediment behind the sediment fence?
              .
                   Are the
                             tradespeople using an adjacent lot to gain entry to the site?
                   If so, has permission been
                                                sought from the land owner(s) and are there
                   control measures in place to
                                                  prevent the movement of sediment off the
                   lot and into the gutter?




                                                                                                             ,,<,’.:,~:::1;~~::4}::;~~~.;;~~tJ

The text continues on section 51.

Used in these records

About this file

File size
89.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request - Received on 19_04_2012.pdf · 89.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.